Red flags

  • 2 complaints at MahaRERA
  • Rs 90.00 crore secured on the land, in favour of TATA CAPITAL HOUSING FINANCE LTD

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0 of 186Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 158 documents Report an error

VISION VANESSA is a Others project by P4 GROUP in Pune, Maharashtra, registered with MahaRERA as P52100050912 on 15 May 2023. Possession is promised by 31 Dec 2026. 186 of the 186 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameVISION VANESSA
  • TypeOthers
  • Location
    • SECTOR NO 32A
    • RAVET PRADHIKARAN
    • Ravet
    • Haveli
    • Pune
    • 411044
  • Pincode411044
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050912
  • ReraGenie IDRG-MH-80983

Builder

  • NameP4 GROUP
  • Entity typePartnership
  • PartnersRAMESHKUMAR VITTHALBHAI PATEL, MANISH SURESHBHAI PATEL, NITESHKUMAR SURESHBHAI PATEL, JAYESHKUMAR SHANTILAL PATEL, MAHENDRA SURESH THAKUR, CHETANKUAR AMBALAL PATEL, JAYKUMAR BIPINBHAI PATEL
  • Authorized PartnerVIPULKUMAR CHIMANLAL BHAVANI
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed158 files

Current status

100%186 of 186 units booked
85.6%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA2522881098
B BUILDINGNA252288088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

A BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,767 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofTATA CAPITAL HOUSING FINANCE LTD
Secured amountRs 90.00 crore
CERSAI search filedYes
Declared on11 Nov 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI27312.34
Proposed, not sanctioned12,900 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHERMAX CHOWK, SAMBHAJI NAGAR, CHINCHWAD,PUNE-411019
Estimated costRs 150.04 cr
Cost incurredRs 128.49 cr
Work done85.64%
BuildingWingEstimatedIncurred
A BUILDINGNARs 67.76 crRs 63.83 cr
B BUILDINGNARs 67.76 crRs 52.23 cr
-NARs 14.52 crRs 12.43 cr

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS MAHENDRA THAKUR AND ASSOCIATES
EngineerSPECTRUM CONSULTANTS
EngineerSWAPNIL SASANE
EngineerRameshwar Chitale
EngineerNARENDRA PANDURANG KULKARNI
EngineerSAURABH VIJAY BENDALE
EngineerMayank Shubhaschandra Patel
Chartered AccountantBANKIM PATEL & ASSOCIATES
Chartered AccountantP H P & ASSOCIATES
Chartered AccountantSNK & CO.
PartnerRole in project
P4 GROUP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
SM12500108Ram GawaliP4 GROUP02/09/2025
SM12500109Ram GawaliP4 GROUP02/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed158

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: FORM 05 VISION VANESSA.pdf8 Jul 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 05 06 2026 Vision Vanessa.pdf4 Jul 2026
Withdrawal Update Form 2File: P4 GROUP FORM 2.pdf4 Jul 2026
Withdrawal Update Form 3File: P4 GROP FORM 3 05 06 2026.pdf4 Jul 2026
Form 2A (FY 2023-2024)File: FORM 2A 2023 24.pdf4 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A for FY 2025-26.pdf3 Jul 2026
Form 1File: Architect Certificate 30 09 2024.pdf10 Jun 2026
Form 2File: Engineer Certificate 30 09 2024.pdf10 Jun 2026
Form 3File: CA Certificate 30 09 25.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 09 24.pdf10 Jun 2026
Form 1File: RERA FORM 01 31 3 2025.pdf10 Jun 2026
Form 2File: RERA FORM 02 31 03 2025.pdf10 Jun 2026
Form 3File: RERA FORM 03 31 03 2025.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31 03 2025.pdf10 Jun 2026
Commencement certificateFile: V Vanessa _Ravet_Comencement Certificate.pdf17 Apr 2026
Building plan approvalFile: V Vanessa _Ravet_Approved layout_compressed.pdf17 Apr 2026
Withdrawal Update Form 1File: V Vanessa P4 Rera Form 1.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 02.pdf17 Apr 2026
Withdrawal Update Form 3File: P4 Group Form 3 Q4.pdf17 Apr 2026
Form 1File: Form - 1.pdf21 Mar 2026
Form 2File: Form - 2.pdf21 Mar 2026
Form 3File: Form - 3.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf21 Mar 2026
Form 1File: Form - 1.pdf21 Mar 2026
Form 2File: Form - 2.pdf21 Mar 2026
Form 3File: Form - 3.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf21 Mar 2026
Form 1File: Form - 1.pdf21 Mar 2026
Form 2File: Form - 2.pdf21 Mar 2026
Form 3File: Form - 3.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf21 Mar 2026
Form 1File: FORM NO -01 P4 GROUP VANESSA.pdf21 Mar 2026
Form 2File: FORM NO -02 P4 GROUP VANESSA.pdf21 Mar 2026
Form 3File: V VANESSA -FORM NO 3.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf21 Mar 2026
Form 1File: Form 01 Mar 24.pdf23 Feb 2026
Form 2File: Form 02 Mar 24.pdf23 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Mar 24.pdf23 Feb 2026
Form 3File: Form - 3 Mar 24.pdf23 Feb 2026
Withdrawal Update Form 1File: P4 GROUP FORM 1 31 12 2025.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 -Vision Vanessa -FY 2025-26 -Q 3.pdf19 Jan 2026
Withdrawal Update Form 3File: P4 GROUP- Vision Vanessa (1).pdf19 Jan 2026
Withdrawal Update Form 1File: P4 GROUP FORM NO 1 ARCHITECT CERTIFICATE.pdf15 Oct 2025
Withdrawal Update Form 2File: P4 GROUP ENGINEER CERTIFICATE FORN NO 2.pdf15 Oct 2025
Withdrawal Update Form 3File: P4 GROUP CA CERTIFICATE FORM NO 3 30 09 2025.pdf15 Oct 2025
Withdrawal Update Form 1File: P4 GROUP FORM NO 1 ARCHITECT CERTIFICATE.pdf14 Oct 2025
Withdrawal Update Form 1File: P4 GROUP FORM NO 1 ARCHITECT CERTIFICATE.pdf14 Oct 2025
Withdrawal Update Form 2File: P4 GROUP ENGINEER CERTIFICATE FORN NO 2.pdf14 Oct 2025
Withdrawal Update Form 2File: P4 GROUP ENGINEER CERTIFICATE FORN NO 2.pdf14 Oct 2025
Withdrawal Update Form 3File: P4 GROUP CA CERTIFICATE FORM NO 3 30 09 2025.pdf14 Oct 2025
Withdrawal Update Form 3File: P4 GROUP CA CERTIFICATE FORM NO 3 30 09 2025.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 P4 Group Vision Vanessa.pdf25 Sep 2025
Form 5 (FY 2023-2024)File: Annual Audit Report of Statutory CA Vanessa 2023 24.pdf25 Sep 2025
Form 2A (FY 2024-2025)File: FORM 2A (P4 GROUP).pdf16 Jul 2025
Building plan approvalFile: 1-2.pdf10 May 2025
Building plan approvalFile: 3-5.pdf10 May 2025
Building plan approvalFile: 6-9.pdf10 May 2025
Building plan approvalFile: 10-12.pdf10 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-2.pdf10 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf10 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 6-9.pdf10 May 2025
Building Plan Approval / NA Order for plotted developmentFile: 10-12.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 P4 Vanessa 31 3 2025.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project P4 Group 31 3 2025.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02 VISION VANESSA 31 03 2025.pdf6 May 2025
Commencement Certificates / NA Order for plotted developmentFile: P 4 GROUP CC.pdf2 May 2025
Declaration about Commencement CertificateFile: Declaration about CC P4 group.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work P4 GROUP FORM 01.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 01 P4 GROUP VANESSA.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VISION VANESSA FORM NO 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 02 P4 GROUP VANESSA.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: P4 GROUP.pdf20 Jan 2025
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf9 Dec 2024
Building plan approvalFile: 1_2.pdf7 Dec 2024
Building plan approvalFile: 3_4.pdf7 Dec 2024
Building plan approvalFile: 5_6.pdf7 Dec 2024
Building plan approvalFile: 7_8.pdf7 Dec 2024
Building plan approvalFile: 9_10.pdf7 Dec 2024
Building plan approvalFile: 11_12.pdf7 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf7 Dec 2024

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISION VANESSA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET PRADHIKARAN13,700+ in Pune

2 kmVISION VANESSACompleted 56Lapsed / revoked 27Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 164 registered projects within 2 km.

Builder: P4 GROUP

P4 GROUP has 3 registrations on MahaRERA, including VANESSA and VISION PRISA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VISION VANESSA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISION VANESSA?

The registered promoter entity is P4 GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISION VANESSA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VISION VANESSA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VISION VANESSA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISION VANESSA?

The professionals named in the filing: Architect: MS MAHENDRA THAKUR AND ASSOCIATES; Engineer: SPECTRUM CONSULTANTS; Engineer: SWAPNIL SASANE; Engineer: Rameshwar Chitale; Engineer: NARENDRA PANDURANG KULKARNI; Engineer: SAURABH VIJAY BENDALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISION VANESSA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISION VANESSA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISION VANESSA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.