Home / Browse projects / Pune, Maharashtra / Shuban Enclave

Registered No litigation declared Residential / Group Housing project

Shuban Enclave

By Sahyadri Devcon

RG-MH-01122 · RERA P52100007474 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 72 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 72 months from the original
8 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 70%
54 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 158 documents Report an error

Shuban Enclave is a Residential / Group Housing project by Sahyadri Devcon in Pune, Maharashtra, registered with MahaRERA as P52100007474 on 17 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 72 months from the original filing. 2 of the 56 units on this registration are recorded sold or booked, and 8 of 33 construction stages are filed complete.

At a glance

Project

  • NameShuban Enclave
  • TypeResidential / Group Housing
  • Location
    • Maharashtra
    • Ravet
    • Haveli
    • Pune
    • 411044
  • Pincode411044
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007474
  • ReraGenie IDRG-MH-01122

Builder

  • NameSahyadri Devcon
  • Entity typePartnership
  • PartnersPratyush Jaiprakash Bhartiya, Savitri Jaiprakash Bhariya

Key dates

this monthRegisteredAug 2017First promiseDec 2020Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 1 Dec 2020)
  • Buildings3 building records
  • Documents filed158 files

Current status

4%2 of 56 units booked
37.4%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shuban enclave Wing DNA9728028
SHUBAN ENCLAVE Wing ENA9728028
SHUBAN ENCLAVENA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 70%.

Shuban enclave Wing D44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHUBAN ENCLAVE Wing E44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHUBAN ENCLAVE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed182

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots182
Closed/Covered30
Open Space152
BuildingClosed/CoveredOpen SpaceTotal
Shuban enclave Wing D157691
SHUBAN ENCLAVE Wing E157691

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,598 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025
LandownerVillageDistrict
Krushnakishor Dayaram AttaradeRavetPune
NItin Pralhad Choudhary And Bhavana N ChoudharyRavetPune
Sangita Satish Narekar And Satish D NarekarRavetPune
Pallavi Pradip VaykodeRavetPune
Kishor Namdeo And Vikas N PatilRavetPune
Sunanda Sharad Saner And Sharad G SanerRavetPune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI5077.32
Proposed, not sanctioned5,077 sq m
Buildings approved5
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGRD AND MEZZ FLOOR SHOP NO 9 10 11 SR NO 31 SUKHWANI PACIFIC OPP ADITYA BIRLA HOSPITAL CHINCHWAD PIMPRI CHINCHWAD MAHARASHTRA 411033
Estimated costRs 12.80 cr
Cost incurredRs 4.79 cr
Work done37.44%
BuildingWingEstimatedIncurred
Shuban enclave Wing DNARs 6.40 crRs 2.40 cr
SHUBAN ENCLAVE Wing ENARs 6.40 crRs 2.40 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARAS SUBHASH NETRAGAONKAR
ArchitectSHILPI ARCHITECTS & PLANNERS
EngineerVijay Kothalkar
EngineerRushikesh Santosh Wanare
Chartered AccountantP S Sunchu And Associates
Chartered AccountantCA ABHIJIT B GAIKWAD
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
Sahyadri Devcon-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017849Dec 2020 → Dec 2026

Reason as filed by the promoterEarlier, we had plan to develop the residential building in survey number 110/1 of Ravet, the plans were sanctioned by the authority Pimpri Chinchwad municipal corporation but due to the encroachment on the access road we could not start the actual work of the project "Shubham enclave" we have we had also registered under MahaRERA having project number P52100007474. but as there was no construction on the site and we could not develop the property due to encroachment on the access road, we have not taken any bookings and advance from anyone. now as the access road is cleared by PCMC and now we

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Oct 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed158

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4 FY 2025-26.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 FY 2025-26.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 2025-26.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf24 Dec 2025
Form 5 (FY 2023-2024)File: FORM 5 UPLOAD 23-24.pdf12 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Upload.pdf12 Dec 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf13 Nov 2025
Withdrawal Update Form 2File: Withdrawal Application Form2_compressed.pdf13 Nov 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf13 Nov 2025
Withdrawal Update Form 1File: Form 1 Q2.pdf19 Oct 2025
Withdrawal Update Form 2File: Form 2 Q2.pdf19 Oct 2025
Withdrawal Update Form 3File: Form 3 Q2.pdf19 Oct 2025
Layout approvalFile: Revised Layout Plan Highlighted.pdf3 Oct 2025
Building plan approvalFile: Building Plan1.pdf3 Oct 2025
Building plan approvalFile: Building Plan 2.pdf3 Oct 2025
Building plan approvalFile: Building Plan 3.pdf3 Oct 2025
Building plan approvalFile: Building Plan 4.pdf3 Oct 2025
Commencement certificateFile: Commencement Certificate.pdf3 Oct 2025
Withdrawal Update Form 1File: Form 1 Withdrawal Upadte.pdf3 Oct 2025
Withdrawal Update Form 2File: Form 2 Withdrawal Upadte.pdf3 Oct 2025
Withdrawal Update Form 3File: Form 3 Withdrawal Upadte.pdf3 Oct 2025
Form 1File: Form 1 31-03-2025.pdf29 Sep 2025
Form 2File: Form 2 31-03-2025.pdf29 Sep 2025
Form 3File: Form 3 Received Upload.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf29 Sep 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: doc 2025-05-01 1520.pdf1 May 2025
Certificates of CA (Form 3)File: doc 2025-05-01 1525.pdf1 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: doc 2025-05-01 1522.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: doc 2025-05-01 1519.pdf1 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: doc 2025-05-01 1523.pdf1 May 2025
Certificates of CA (Form 3)File: 20250122000437_page-0001.pdf22 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA ARCHITECT CERTEFICATE (2).pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certificate.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)_page-0001.pdf20 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT.pdf25 Oct 2024
Certificates of CA (Form 3)File: CA.pdf25 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG.pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY.pdf25 Oct 2024
Certificates of CA (Form 3)File: CA Certuficate Shubhan DocScanner 12-Aug-2024 5-11 PM.pdf13 Aug 2024
Layout approvalFile: scan0293-pages-1-min.pdf31 Jul 2024
Layout approvalFile: scan0293-pages-2-min.pdf31 Jul 2024
Layout approvalFile: scan0293-pages-3-min.pdf31 Jul 2024
Layout approvalFile: scan0293-pages-4-min.pdf31 Jul 2024
Copy of Layout Approval (in case of layout)File: scan0293-pages-1-min.pdf31 Jul 2024
Copy of Layout Approval (in case of layout)File: scan0293-pages-2-min.pdf31 Jul 2024
Copy of Layout Approval (in case of layout)File: scan0293-pages-3-min.pdf31 Jul 2024
Copy of Layout Approval (in case of layout)File: scan0293-pages-4-min.pdf31 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC (1).pdf31 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate -compressed.pdf23 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate (1)-compressed.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA (2).pdf23 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf26 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Qc SHUBAN (2).pdf26 Apr 2024
Certificates of CA (Form 3)File: CA Certificate SHUBAN.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GetUserDocumentFileContent (2).pdf23 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 17 18.pdf23 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18 19.pdf23 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 19 20.pdf23 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FROM 5 20 21.pdf23 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 21 22.pdf23 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 22 23.pdf23 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22 23.pdf23 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT.pdf23 Dec 2023
Other - LegalFile: 0000001.pdf21 Dec 2023
Other - LegalFile: 0000002.pdf21 Dec 2023
Proforma of Agreement for saleFile: Agreement Shubhan Enclave.pdf15 Dec 2023
Proforma of Agreement for saleFile: Agreement to Sale Shuban Enclave - 04-12-23.pdf4 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 ENGINEERING CERTIFICATE 30062023.pdf3 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14 ENGINEERING CERTIFICATE 31032023.pdf3 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 15 ENGINEERING CERTIFICATE FOR QUALITY ASSURANCE 31032020.pdf3 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 16 ENGINEERING CERTIFICATE FOR QUALITY ASSURANCE 31032021.pdf3 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 17 ENGINEERING CERTIFICATE FOR QUALITY ASSURANCE 31032022.pdf3 Dec 2023
Certificates of CA (Form 3)File: 10 ARCHITECT CERTIFICATE 30062023.pdf3 Dec 2023
Certificates of CA (Form 3)File: 11 ARCHITECT CERTIFICATE 30092023.pdf3 Dec 2023
Certificates of CA (Form 3)File: 12 ARCHITECT CERTIFICATE 31032023.pdf3 Dec 2023
Copy of the legal title reportFile: DocScanner 28.pdf28 Nov 2023

How this compares with Pune

4%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shuban Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravet13,700+ in Pune

2 kmShuban EnclaveCompleted 97Lapsed / revoked 52Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 246 registered projects within 2 km.

Builder: Sahyadri Devcon

Sahyadri Devcon has 1 registration on MahaRERA, including Shuban Enclave. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Shuban Enclave is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shuban Enclave?

The registered promoter entity is Sahyadri Devcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shuban Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shuban Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shuban Enclave?

The professionals named in the filing: Architect: PARAS SUBHASH NETRAGAONKAR; Architect: SHILPI ARCHITECTS & PLANNERS; Engineer: Vijay Kothalkar; Engineer: Rushikesh Santosh Wanare; Chartered Accountant: P S Sunchu And Associates; Chartered Accountant: CA ABHIJIT B GAIKWAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shuban Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shuban Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shuban Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.