Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Somnath Avenue is a Others project by SOMNATH BUILDERS & DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000056009 on 6 May 2024. Possession is promised by 31 Dec 2033.
At a glance
Project
- NameSomnath Avenue
- TypeOthers
- Location
- Aadhikari Life Line Hospital
- Reliance Smart
- Betegaon
- Palghar
- 401501
- Pincode401501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000056009
- ReraGenie IDRG-MH-06700
Builder
- NameSOMNATH BUILDERS & DEVELOPERS
- Entity typePartnership
- PartnersRahul Ramesh Thumar, Devendra Khimraj Jain
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 May 2024
- Promised completion31 Dec 2033
- Revised completionNone
- Buildings3 building records
- Documents filed74 files
Current status
Figures as on 16 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TYPE C4 SECTOR NO 1 BLDG NO 4 WING A | NA | 4 | 0 | 0 | 0 | 0 |
| TYPE B6 SECTOR NO 1 BLDG NO 4 WING B | NA | 4 | 0 | 0 | 0 | 0 |
| TYPE B6 SECTOR NO 1 BLDG NO 4 WING C | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 20%.
TYPE C4 SECTOR NO 1 BLDG NO 4 WING A66%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
TYPE B6 SECTOR NO 1 BLDG NO 4 WING B56%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
TYPE B6 SECTOR NO 1 BLDG NO 4 WING C56%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| TYPE C4 SECTOR NO 1 BLDG NO 4 WING A | 10 | 10 |
| TYPE B6 SECTOR NO 1 BLDG NO 4 WING B | 10 | 10 |
| TYPE B6 SECTOR NO 1 BLDG NO 4 WING C | 10 | 10 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| HEMANT RAMESH MHATRE | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TYPE C4 SECTOR NO 1 BLDG NO 4 WING A | NA | Rs 3.04 cr | Rs 2.67 cr |
| TYPE B6 SECTOR NO 1 BLDG NO 4 WING C | NA | Rs 1.75 cr | Rs 1.53 cr |
| TYPE B6 SECTOR NO 1 BLDG NO 4 WING B | NA | Rs 1.71 cr | Rs 1.49 cr |
| - | NA | Rs 1.30 cr | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ajay Wade & Associates |
| Engineer | Shilplekha Associates |
| Chartered Accountant | CA. Shailendra Kumar Mishra |
| Partner | Role in project |
|---|---|
| SOMNATH BUILDERS & DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Sep 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Sep 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Sep 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2033
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Somnath.pdf | 16 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 -Somnath Avenue.pdf | 16 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Somnath.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 September.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 December 25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 September.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 December 25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Sep.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 December.pdf | 26 Feb 2026 |
| Layout approvalFile: Layout Plan_11zon.pdf | 29 Sep 2025 |
| Building plan approvalFile: Building Plan_11zon.pdf | 29 Sep 2025 |
| Layout approvalFile: Layout Plan_11zon.pdf | 29 Sep 2025 |
| Building plan approvalFile: Building Plan_11zon.pdf | 29 Sep 2025 |
| Commencement certificateFile: Revise CC.pdf | 29 Sep 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 29 Sep 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 29 Sep 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 29 Sep 2025 |
| Form 1File: FORM 1 SOMNATH BUILDERS & DEVELOPERS.pdf | 13 Jun 2025 |
| Form 2File: FORM 2 SOMNATH BUILDERS & DEVELOPERS.pdf | 13 Jun 2025 |
| Form 3File: Form 3 Somnath Avenue.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Somnath Avenue.pdf | 13 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon (1).pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-Booked Inventory.pdf | 12 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: NEW PLINT CERTIFICATE SOMNATH.pdf | 30 Apr 2024 |
| Layout approvalFile: LAYOUT PLAN - RERA SITE (1).pdf | 8 Apr 2024 |
| Building plan approvalFile: BLDG NO 4 A WING (2).pdf | 8 Apr 2024 |
| Building plan approvalFile: BLDG NO 4 B AND C WING (2).pdf | 8 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - RERA SITE (1).pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG NO 4 A WING (2).pdf | 8 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG NO 4 B AND C WING (2).pdf | 8 Apr 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABT CCC.pdf | 8 Apr 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE DRAFT FINAL.pdf | 8 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: NO DEVIATION CERTIFICATE.pdf | 8 Apr 2024 |
| Other - TechnicalFile: CC VERIFICATION SOMNATH.pdf | 8 Apr 2024 |
| Other - LegalFile: 1 Proforma of Agreement for sale.pdf | 23 Mar 2024 |
| Other - LegalFile: LEGAL TITLE SEARCH SOMNATH GUT NO 111 (1) (1).pdf | 4 Mar 2024 |
| Other - LegalFile: DECLARATION CUM UNDERTAKING.pdf | 4 Mar 2024 |
| Other - TechnicalFile: clarification for application of gut no 111.pdf | 27 Feb 2024 |
| Other - TechnicalFile: clarification for landowner for got no 111.pdf | 27 Feb 2024 |
| Other - TechnicalFile: LETTER FOR PLOT OF LAND.pdf | 26 Feb 2024 |
| Copy of the legal title reportFile: TITLE AND LEGAL SEARCH (1).pdf | 29 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC (2).pdf | 27 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: REVALIDATED CC.pdf | 11 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 23 Nov 2023 |
| Declaration in FORM BFile: From B NEW compressed.pdf | 22 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 17 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 17 Nov 2023 |
| Proforma of Allotment letterFile: ALLOTEMENT LETTER (2).pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 01 TO 04.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 05 TO 10.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 11 TO 16.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 17 TO 22.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 23 TO 28.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 29 TO 34.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 35 TO 40.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 41 TO 46.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 47 TO 52.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 53 TO 58.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 59 TO 64.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 65 TO 70.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 71 TO 76.pdf | 17 Nov 2023 |
| Other - LegalFile: D A PAGE NO 77 TO 83.pdf | 17 Nov 2023 |
| Other - LegalFile: Somnath Partnership Deed (1).pdf | 17 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account.pdf | 23 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 16 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Booked Inventory.pdf | 14 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Letter of Encumbrances Finance.pdf | 13 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Letter of Encumbrances Finance.pdf | 13 Sep 2023 |
| CERSAI detailsFile: Undertaking for No Cersai report.pdf | 13 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: No Changes in Deviation Of Allotment letter.pdf | 13 Sep 2023 |
| PAN CardFile: Company Pan.pdf | 9 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Somnath Avenue on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Reliance Smart3,200+ in Palghar
Filed coordinates, straight-line distance. 53 registered projects within 2 km.
Birla Mrida
Birla Estates Private Limited
Roop Rajat Park Phase 3
MAHAVIR ASSOCIATES
AGAMI INFINITY PARK
MAYURESH REALTY PRIVATE LIMITED
Luxury Empire Township Phase I
VEENAA DEVELOPERS PRIVATE LIMITED
MAHAVIR ARCADE
MAHAVIR DEVELOPERS AND REALTORS
SHANTI VISTA - II
SHAH REALTY CORPORATION
See every Palghar project, with the district possession charts
Builder: SOMNATH BUILDERS & DEVELOPERS
SOMNATH BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including Somnath Avenue. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Somnath Avenue is delayed beyond 31 Dec 2033?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Somnath Avenue?
The registered promoter entity is SOMNATH BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Somnath Avenue?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Somnath Avenue?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Somnath Avenue?
The professionals named in the filing: Architect: Ajay Wade & Associates; Engineer: Shilplekha Associates; Chartered Accountant: CA. Shailendra Kumar Mishra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Somnath Avenue?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback