ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Somnath Avenue

Registered No litigation declared Others project

Somnath Avenue

By SOMNATH BUILDERS & DEVELOPERS

RG-MH-06700 · RERA P99000056009 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2033Possession promisedno revision filed
19 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 20%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Somnath Avenue is a Others project by SOMNATH BUILDERS & DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000056009 on 6 May 2024. Possession is promised by 31 Dec 2033.

At a glance

Project

  • NameSomnath Avenue
  • TypeOthers
  • Location
    • Aadhikari Life Line Hospital
    • Reliance Smart
    • Betegaon
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000056009
  • ReraGenie IDRG-MH-06700

Builder

  • NameSOMNATH BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersRahul Ramesh Thumar, Devendra Khimraj Jain

Key dates

this monthRegisteredMay 2024PromisedDec 2033

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 May 2024
  • Promised completion31 Dec 2033
  • Revised completionNone
  • Buildings3 building records
  • Documents filed74 files

Current status

72.9%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE C4 SECTOR NO 1 BLDG NO 4 WING ANA40000
TYPE B6 SECTOR NO 1 BLDG NO 4 WING BNA40000
TYPE B6 SECTOR NO 1 BLDG NO 4 WING CNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 20%.

TYPE C4 SECTOR NO 1 BLDG NO 4 WING A66%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
TYPE B6 SECTOR NO 1 BLDG NO 4 WING B56%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
TYPE B6 SECTOR NO 1 BLDG NO 4 WING C56%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Open Space30
BuildingOpen SpaceTotal
TYPE C4 SECTOR NO 1 BLDG NO 4 WING A1010
TYPE B6 SECTOR NO 1 BLDG NO 4 WING B1010
TYPE B6 SECTOR NO 1 BLDG NO 4 WING C1010

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area631 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Jun 2025
LandownerVillageDistrict
HEMANT RAMESH MHATREVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityCREDAI-MCHI
Permissible FSI2632.05
Proposed, not sanctioned2,632 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGokul Township Virar West
Estimated costRs 7.80 cr
Cost incurredRs 5.69 cr
Work done72.89%
BuildingWingEstimatedIncurred
TYPE C4 SECTOR NO 1 BLDG NO 4 WING ANARs 3.04 crRs 2.67 cr
TYPE B6 SECTOR NO 1 BLDG NO 4 WING CNARs 1.75 crRs 1.53 cr
TYPE B6 SECTOR NO 1 BLDG NO 4 WING BNARs 1.71 crRs 1.49 cr
-NARs 1.30 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjay Wade & Associates
EngineerShilplekha Associates
Chartered AccountantCA. Shailendra Kumar Mishra
PartnerRole in project
SOMNATH BUILDERS & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Sep 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2033

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Somnath.pdf16 Jun 2026
Withdrawal Update Form 2File: Form 2 -Somnath Avenue.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3 Somnath.pdf16 Jun 2026
Withdrawal Update Form 1File: Form 1 September.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 December 25.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2 September.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2 December 25.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 Sep.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 December.pdf26 Feb 2026
Layout approvalFile: Layout Plan_11zon.pdf29 Sep 2025
Building plan approvalFile: Building Plan_11zon.pdf29 Sep 2025
Layout approvalFile: Layout Plan_11zon.pdf29 Sep 2025
Building plan approvalFile: Building Plan_11zon.pdf29 Sep 2025
Commencement certificateFile: Revise CC.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf29 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf29 Sep 2025
Withdrawal Update Form 3File: Form 3.pdf29 Sep 2025
Form 1File: FORM 1 SOMNATH BUILDERS & DEVELOPERS.pdf13 Jun 2025
Form 2File: FORM 2 SOMNATH BUILDERS & DEVELOPERS.pdf13 Jun 2025
Form 3File: Form 3 Somnath Avenue.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Somnath Avenue.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon (1).pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-Booked Inventory.pdf12 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: NEW PLINT CERTIFICATE SOMNATH.pdf30 Apr 2024
Layout approvalFile: LAYOUT PLAN - RERA SITE (1).pdf8 Apr 2024
Building plan approvalFile: BLDG NO 4 A WING (2).pdf8 Apr 2024
Building plan approvalFile: BLDG NO 4 B AND C WING (2).pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - RERA SITE (1).pdf8 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BLDG NO 4 A WING (2).pdf8 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: BLDG NO 4 B AND C WING (2).pdf8 Apr 2024
Declaration about Commencement CertificateFile: DECLARATION ABT CCC.pdf8 Apr 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE DRAFT FINAL.pdf8 Apr 2024
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION CERTIFICATE.pdf8 Apr 2024
Other - TechnicalFile: CC VERIFICATION SOMNATH.pdf8 Apr 2024
Other - LegalFile: 1 Proforma of Agreement for sale.pdf23 Mar 2024
Other - LegalFile: LEGAL TITLE SEARCH SOMNATH GUT NO 111 (1) (1).pdf4 Mar 2024
Other - LegalFile: DECLARATION CUM UNDERTAKING.pdf4 Mar 2024
Other - TechnicalFile: clarification for application of gut no 111.pdf27 Feb 2024
Other - TechnicalFile: clarification for landowner for got no 111.pdf27 Feb 2024
Other - TechnicalFile: LETTER FOR PLOT OF LAND.pdf26 Feb 2024
Copy of the legal title reportFile: TITLE AND LEGAL SEARCH (1).pdf29 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC (2).pdf27 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: REVALIDATED CC.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf23 Nov 2023
Declaration in FORM BFile: From B NEW compressed.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Nov 2023
Proforma of Allotment letterFile: ALLOTEMENT LETTER (2).pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 01 TO 04.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 05 TO 10.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 11 TO 16.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 17 TO 22.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 23 TO 28.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 29 TO 34.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 35 TO 40.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 41 TO 46.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 47 TO 52.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 53 TO 58.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 59 TO 64.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 65 TO 70.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 71 TO 76.pdf17 Nov 2023
Other - LegalFile: D A PAGE NO 77 TO 83.pdf17 Nov 2023
Other - LegalFile: Somnath Partnership Deed (1).pdf17 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account.pdf23 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf16 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Booked Inventory.pdf14 Sep 2023
Details of encumbrances concerned to FinanceFile: Letter of Encumbrances Finance.pdf13 Sep 2023
Details of encumbrances concerned to LegalFile: Letter of Encumbrances Finance.pdf13 Sep 2023
CERSAI detailsFile: Undertaking for No Cersai report.pdf13 Sep 2023
Deviation Report with respect to Allotment letterFile: No Changes in Deviation Of Allotment letter.pdf13 Sep 2023
PAN CardFile: Company Pan.pdf9 Sep 2023

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Somnath Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Reliance Smart3,200+ in Palghar

2 kmSomnath AvenueCompleted 6Lapsed / revoked 17Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: SOMNATH BUILDERS & DEVELOPERS

SOMNATH BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including Somnath Avenue. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Somnath Avenue is delayed beyond 31 Dec 2033?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Somnath Avenue?

The registered promoter entity is SOMNATH BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Somnath Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Somnath Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Somnath Avenue?

The professionals named in the filing: Architect: Ajay Wade & Associates; Engineer: Shilplekha Associates; Chartered Accountant: CA. Shailendra Kumar Mishra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Somnath Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Somnath Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Somnath Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.