SOMMET Tower No. 7, Row-Houses and Commercial Building
RG-MH-93637 · RERA P52100049928 · Last updated on MahaRERA portal: 18 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SOMMET Tower No. 7, Row-Houses and Commercial Building is a Others project by SANKLA BUILDCOON in Pune, Maharashtra, registered with MahaRERA as P52100049928 on 6 Mar 2023. Possession is promised by 31 Dec 2029. The completion date has moved by 48 months from the original filing. 96 of the 128 units on this registration are recorded sold or booked, and 7 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameSOMMET Tower No. 7, Row-Houses and Commercial Building
- TypeOthers
- Location
- Paud Road
- Bhugaon
- Mulshi
- Pune
- 412115
- Pincode412115
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049928
- ReraGenie IDRG-MH-93637
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Mar 2023
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2025)
- Buildings3 building records
- Documents filed85 files
Current status
Figures as on 18 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower No 7 | NA | 15 | 13 | 102 | 0 | 102 |
| Row-Houses | NA | 3 | 3 | 11 | 0 | 11 |
| Commercial/Amenity Building | NA | 3 | 3 | 0 | 15 | 15 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 95%.
Tower No 798%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Row-Houses31%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 30% |
| Stilt Floor | 30% |
| Slabs of Super Structure | 30% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Commercial/Amenity Building0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 70% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | Yes | 80% |
| Open Parking | No | Not applicable |
Parking filed568
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Tower No 7 | 91 | 204 | 295 |
| Row-Houses | 33 | 0 | 33 |
| Commercial/Amenity Building | 0 | 240 | 240 |
Land and ownership10
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mrs Shikha Ajit Sancheti | Kothrud | Pune |
| Aakash Ajit sancheti | Kothrud | Pune |
| Ankita Rishabh Gandhi Nee Ankita Ajit Sancheti | Kothrud | Pune |
| Mr Ajit C Sancheti | Kothrud | Pune |
| Mrs Rashmi Sachin Lodha | Pune (M Corp.) | Pune |
| Miss Jiya Sachin Lodha | Pune (M Corp.) | Pune |
| Mr Sachin S Lodha | Pune (M Corp.) | Pune |
| Mr Rahul Dattatray Shedge | Bhugaon | Pune |
| Mr Raju Ganpat Satpute | Bhugaon | Pune |
| Mr Balu Lahu Shedge | Bhugaon | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower No 7 | NA | Rs 42.00 cr | Rs 42.00 cr |
| Row-Houses | NA | Rs 7.34 cr | Rs 5.37 cr |
| - | NA | Rs 2.00 cr | Rs 1.85 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A design Studio |
| Architect | Crystal Landmark LLP |
| Engineer | Mr Shekhar Dharmadhikari |
| Engineer | Chandrashekhar Dharmadhikari |
| Chartered Accountant | Mr Kalpesh K Nagar |
| Chartered Accountant | Kiran Suryawanshi & Associates |
| Partner | Role in project |
|---|---|
| SANKLA BUILDCOON | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTower 7 & 3 Row Houses are completed, awaiting completion certificate; remaining Row Houses and Commercial work still to be started and not sold. So need extension till 31/12/2029
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504677 | RASHMI DEEPAK ARDALKAR | SANKLA BUILDCOON | 29/12/2025 |
| CC12601094 | SWANAND BHALWANKAR AND OTHERS | SANKLA BUILDCOON | 28/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Mar26.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2 Mar26.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Form 3 Mar26.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: Sommet T7 June 25 - Form 1.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: SB FORM 1 - Sommet Ph3 SEPT 2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Dec.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Sommet T7 June 25 - Form 2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: SB Form 2 - Sommet Ph3 - Sep 2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: SB Form 2 - Sommet Ph3 - Dec 2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Sommet T7 June 25 - Form 3.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Sommet Ph3 Form 3 - Sept 2025.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Sommet Ph3 Form 3 - Dec 2025.pdf | 24 Apr 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1_MARCH 2025.pdf | 25 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -March 2025 Phase 3.pdf | 25 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_MARCH 2025.pdf | 25 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SB Ph3 FORM 1.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Phase 3 SB.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SB Ph3 FORM 2.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T7 Form 1.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SB Form 3 - T7 - July 24 To Sept 24_compressed.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 18 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Somet Tower No 7 CA.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Tower No 7 Jan to Marc 24.pdf | 15 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Tower 7 Jan to Mar 24.pdf | 15 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Tower 7 Jan to Mar 24.pdf | 15 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Quarter Oct to Dec 2023 Architects Certificate Tower No 7 Sommet.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Quarter Oct to Dec 2023 Engineers Certificate Tower No 7 Sommet.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for Tower No 7 Bhugaon pune for Quarter Oct to Dec 2023 comp.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 30062023 Tower No 7.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 30092023 Tower No 7.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 30062023 Tower No 7.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 30092023 Tower No 7.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 30062023 Tower No 7.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 30092023 Tower No 7.pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 SOMMET Tower No 7 Row Houses and Commercial Building Bhugaon Pune.pdf | 21 Nov 2023 |
| Other - TechnicalFile: Self-declaration for date change.pdf | 14 Mar 2023 |
| Declaration about Commencement CertificateFile: GetUserDocumentFileContent_rotated (1).pdf | 28 Feb 2023 |
| Other - TechnicalFile: Format A - Title Report.pdf | 28 Feb 2023 |
| Other - TechnicalFile: Title Report Bhugaon Pune.pdf | 28 Feb 2023 |
| Other - TechnicalFile: Model form of allotment letter- 23-02-2023.pdf | 28 Feb 2023 |
| Other - TechnicalFile: encumbarance.pdf | 28 Feb 2023 |
| Other - TechnicalFile: Deviation report Allotment letter- 23-02-2023.pdf | 28 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: encumbarance.pdf | 24 Feb 2023 |
| Details of encumbrances concerned to LegalFile: encumbarance.pdf | 24 Feb 2023 |
| Foreclosure of the ProjectFile: CA Certificate Tower 7 17-02-2023.pdf | 18 Feb 2023 |
| Other - LegalFile: amenity included letter.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf | 14 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Partners Sahil Sankla Sir.pdf | 8 Feb 2023 |
| Proforma of Allotment letterFile: Model form of allotment letter.pdf | 7 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation Report Allotment letter Tower No 7.pdf | 7 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report Agreement for sale 09022023.pdf | 7 Feb 2023 |
| Other - FinanceFile: CERSAI_Search_Report_200259773057_For_Asset_Based_Search_07_02_2023_19_09_22_462.pdf | 7 Feb 2023 |
| Other - TechnicalFile: Architect Certificate tower no 7.pdf | 7 Feb 2023 |
| Building plan approvalFile: Plan Page 15 compressed.pdf | 31 Jan 2023 |
| Building plan approvalFile: Plan -Page- 11 compressed.pdf | 31 Jan 2023 |
| Building plan approvalFile: Plan-Page-14 compressed.pdf | 31 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 15 compressed.pdf | 31 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan -Page- 11 compressed.pdf | 31 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan-Page-14 compressed.pdf | 31 Jan 2023 |
| Layout approvalFile: Plan Page 1 (1).pdf | 23 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Plan Page 1 (1).pdf | 23 Jan 2023 |
| Building plan approvalFile: Plan Page 10 (1).pdf | 20 Jan 2023 |
| Building plan approvalFile: Plan Page 11.pdf | 20 Jan 2023 |
| Building plan approvalFile: Plan Page 12.pdf | 20 Jan 2023 |
| Building plan approvalFile: Plan Page 13.pdf | 20 Jan 2023 |
| Building plan approvalFile: Plan Page 14.pdf | 20 Jan 2023 |
| Building plan approvalFile: Plan Page 16.pdf | 20 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 10 (1).pdf | 20 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 11.pdf | 20 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 12.pdf | 20 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 13.pdf | 20 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 14.pdf | 20 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 16.pdf | 20 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Annexure A.pdf | 5 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance.pdf | 27 Dec 2022 |
| Details of encumbrances concerned to LegalFile: No Encumbrance.pdf | 27 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf | 9 Dec 2022 |
| Copy of the legal title reportFile: format A (1) (1)-corrected (1).pdf | 5 Dec 2022 |
| Copy of the legal title reportFile: search title compressed.pdf | 5 Dec 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| AVANI II | S No 2 Plot No. A1 Mohammadwadi Pune | 132 | Completed | May 2023 | May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SOMMET Tower No. 7, Row-Houses and Commercia on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhugaon13,700+ in Pune
Filed coordinates, straight-line distance. 57 registered projects within 2 km.
Avian Valley - Solaire
KAKADE ESTATE DEVELOPERS PVT. LTD.
Park Pebbles Phase I
M/s Rainbow Purple Construction LLP
Mahindra Rivenza Phase 2
Mahindra Lifespace Developers limited
Mahindra Rivenza Phase 1
Mahindra Lifespace Developers limited
FOREST TRAILS ATHASHRI B3
LAVIM DEVELOPERS PVT LTD
KOHINOOR WOODSHIRE
INTOFINITY PROMOTERS PRIVATE LIMITED
Builder: SANKLA BUILDCOON
SANKLA BUILDCOON has 3 registrations on MahaRERA, including SOMMET and SOMMET Tower Nos. 3 and 4. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SOMMET Tower No. 7, Row-Houses and Commercial Building is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SOMMET Tower No. 7, Row-Houses and Commercial Building?
The registered promoter entity is SANKLA BUILDCOON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SOMMET Tower No. 7, Row-Houses and Commercial Building?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SOMMET Tower No. 7, Row-Houses and Commercial Building?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SOMMET Tower No. 7, Row-Houses and Commercial Building?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SOMMET Tower No. 7, Row-Houses and Commercial Building?
The professionals named in the filing: Architect: A design Studio; Architect: Crystal Landmark LLP; Engineer: Mr Shekhar Dharmadhikari; Engineer: Chandrashekhar Dharmadhikari; Chartered Accountant: Mr Kalpesh K Nagar; Chartered Accountant: Kiran Suryawanshi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SOMMET Tower No. 7, Row-Houses and Commercial Building?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback