Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2023Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 125 documents Report an error

SOMAYAJI ENCLAVE is a Residential/Group Housing project by SOMAYAJI ESTATES PRIVATE LIMITED in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/220630/005023 on 30 Jun 2022. Possession is promised by 31 Dec 2023.

At a glance

Project

  • NameSOMAYAJI ENCLAVE
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/220630/005023
  • ReraGenie IDRG-KA-78038

Builder

  • NameSOMAYAJI ESTATES PRIVATE LIMITED
  • Entity typeCompany
  • Authorized SignatoryB RAGHUNATH SOMAYAJI
  • DirectorsARUNDATHI SOMAYAJI, B RAGHUNATH SOMAYAJI
  • Other registrations2 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredJun 2022PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Jun 2022
  • Promised completion31 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed125 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SOMAYAJI ENCLAVE---50050

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 May 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 21 May 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,754 sq m
Named landowners2
LandownerVillageDistrict
ARVIND MANOHAR--
SWATHI KUMBLE--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSuresh Kumar
EngineerStruct Bombay Consultants - Shantilal H Jain

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed125

As listed on the registration, under the names the promoter filed them with; the newest 80 of 125 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/220630/005023 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
AOSFile: Agreement of Sale Proforma Enclave FINAL.pdf21 May 2022
Proforma of proforma of Agreement of for saleFile: Agreement of Sale Proforma Enclave.pdf21 Mar 2022
SOMAYAJI ELITE COMPLETION CERTIFICATEFile: Occupancy Certificate.pdf14 Mar 2022
NOC issued by concerned water supply authority.File: Kottara - Water NOC.pdf21 Feb 2022
NOC issued by MESCOM(Power supply).File: MESCOM NOC - ENCLAVE.pdf21 Feb 2022
break up Development Details with type of site, size and numbersFile: Kottara - Area Breakup.xlsx1 Jan 2022
Section 3(1) Notarized Affidavit.File: Affidavit NEW.pdf1 Jan 2022
Latitude and Longitude detailsFile: LATITUDE AND LONGITUDE.pdf1 Jan 2022
NOC issued by KSPCBFile: KSPCB.pdf1 Jan 2022
APPROVED BUILDING PLANFile: MYSCAN_0601 (1).PDF1 Jan 2022
APPROVED BUILDING PLANFile: MYSCAN_0602 (1).PDF1 Jan 2022
APPROVED BUILDING PLANFile: MYSCAN_0603 (1).PDF1 Jan 2022
APPROVED BUILDING PLANFile: MYSCAN_0604.PDF1 Jan 2022
APPROVED BUILDING PLANFile: MYSCAN_0605.PDF1 Jan 2022
APPROVED BUILDING PLANFile: MYSCAN_0606.PDF1 Jan 2022
MESCOM(power supplyFile: Kottara Mescom NOC PAYMENT RECIEPT.pdf1 Jan 2022
Water supply authorityFile: Water Connection - NOC.pdf1 Jan 2022
STP in the project is to be clarified by the promoter along with drawings and documents to be uploadFile: KSPCB.pdf1 Jan 2022
STP in the project is to be clarified by the promoter along with drawings aFile: SOMAYAJI ENCLAVE_1 STP LOCATION-Model.pdf1 Jan 2022
SPEIFICATIONFile: Specifications (1).pdf1 Jan 2022
BROCHUREFile: Somayaj Enclave Brochure.pdf1 Jan 2022
ARCHITECT AND STRUCTURAL ENGINEERSFile: Architect and Structural Engineer Details.xlsx1 Jan 2022
AREA BREAK UPFile: dod kottara-converted.xlsx21 Dec 2021
Development Details with type of site, size and numbers/qty properly(Split up details)File: Kottara - Area Breakup.xlsx21 Dec 2021
WATER NOCFile: Water Connection - NOC.pdf21 Dec 2021
MESCOM RECIEPTFile: Kottara Mescom NOC PAYMENT RECIEPT.pdf21 Dec 2021
VALID SALE DEED EXECUTED Veeda Kshanthi D'Souza TO Aravind Manohar,File: Sale Deed - Aravind Manohar.pdf25 Nov 2021
RECTIFICATION DEEDFile: Rectification Deed.pdf25 Nov 2021
SALE DEEDFile: Sale Deed (Muli Right).pdf25 Nov 2021
BREAK UP AND APARTMENT DETAILSFile: Kottara - Area Breakup.xlsx25 Nov 2021
WATER SUPPLYFile: Water Connection - NOC.pdf25 Nov 2021
LEASE DEED Smt. Veeda Kshanthi D'SouzaFile: Lease Deed - Kottara.pdf15 Nov 2021
AREA BREAK UPFile: Kottara - Area Breakup.xlsx15 Nov 2021
Section 3(1) Notarized AffidavitFile: Affidavit.pdf15 Nov 2021
1) Need RTC and MR at the time of conversion.File: RTC.pdf26 Oct 2021
Need sale deed in the name of land owner .File: Sale Deed.pdf26 Oct 2021
aRCHITECT DETAILS AND STRUCTURAL ENGINEER DETAILS ALREADY UPLOADEDFile: Architect and Structural Engineer Details.xlsx26 Oct 2021
Please upload the break up Development Details with type of site, size and numbers in the project deFile: dod kottara-converted.xlsx26 Oct 2021
LATITUDE AND LONGITUDE DETAILSFile: lATITUDE LONGITUDE.pdf26 Oct 2021
noc ISSUED BY kspcbFile: KSPCB.pdf26 Oct 2021
NOC from water departmentFile: Water Connection - NOC.pdf26 Oct 2021
STP drawingsFile: SOMAYAJI ENCLAVE_1 STP LOCATION-Model.pdf26 Oct 2021
Project SpecificationsFile: Specifications (1).pdf26 Oct 2021
Approved drawingsFile: all floor plan merged4mb.pdf26 Oct 2021
Financials statementFile: BSPL 2018-19.pdf26 Oct 2021
financial statementsFile: BSPL 2019-20.pdf26 Oct 2021
Registered Power of AttorneyFile: GPA.pdf26 Oct 2021
ECFile: EC- Kottara Property.pdf26 Oct 2021
Single Site ApprovalFile: Single Layout.pdf26 Oct 2021
All floor plansFile: all floor plan merged4mb.pdf26 Oct 2021
elevationFile: elevation.jpg26 Oct 2021
MR/KhataFile: Khatha.pdf26 Oct 2021
CertificateFile: CERTIFICATE OF INCORPORATION.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate Work Completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Eng Certificate Work completed.pdf-
CA Certificate for Funds UtilizationFile: Form Ex3 RERA.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate Work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Eng Certificate Work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: Form Ex4 RERA.pdf-
AffidavitFile: Affidavit extn.pdf-
Latest Encumbrance CertificateFile: MESCOM NOC - ENCLAVE.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold unsold.xlsx-
Document 1File: Affidavit.pdf-
Licence order_compressed-
Licence Plans_compressed-
Licence Plans_compressed-
DEED OF SALE OF APARTMENT no-
Rera agreement Somayaji Enclave-
JDA_compressed-
Licence Plans_compressed-
Single Site-
Rera agreement Somayaji Enclave-
area statement-
area statement-
EC- 15 years-
Joint cum Declaration-
Joint cum Declaration-
Khatha-
JDA_compressed-
Conversion Order-

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
SOMAYAJI ORCHID-OngoingMar 2022Not delivered
SOMAYAJI KALPAVRUKSHA-OngoingMar 2022Not delivered
SOMAYAJI ELITE-OngoingOct 2021Not delivered

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep SOMAYAJI ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmSOMAYAJI ENCLAVEOther 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: SOMAYAJI ESTATES PRIVATE LIMITED

Somayaji Estates Private Limited has 3 registrations on RERA Karnataka, including Somayaji Kalpavruksha and SOMAYAJI ENCLAVE. Its filings declare 3 earlier projects, none of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if SOMAYAJI ENCLAVE is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SOMAYAJI ENCLAVE?

The registered promoter entity is SOMAYAJI ESTATES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SOMAYAJI ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SOMAYAJI ENCLAVE?

The professionals named in the filing: Architect: Suresh Kumar; Engineer: Struct Bombay Consultants - Shantilal H Jain. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOMAYAJI ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOMAYAJI ENCLAVE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOMAYAJI ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.