Soham Heights

By SAGAROM DB INFRA LLP

RG-MH-17663 · RERA P51800056062 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 56%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Soham Heights is a Residential / Group Housing project by SAGAROM DB INFRA LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056062 on 10 May 2024. Possession is promised by 13 Dec 2027.

At a glance

Project

  • NameSoham Heights
  • TypeResidential / Group Housing
  • Location
    • Plot No. 807
    • Charkop Gajanan CHSL
    • Bearing CTS no. 3A(pt)
    • at village Kandivali
    • RSC-04
    • Sector -08
    • Charkop
    • Kandivali West
    • Charkop
    • Borivali
    • Mumbai...
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056062
  • ReraGenie IDRG-MH-17663

Builder

  • NameSAGAROM DB INFRA LLP
  • Entity typePartnership
  • PartnersHanumant Prabhakar Narkar, Dinesh Nagindas Shah, Bipin Durlabhbhai Mahyavanshi, Dipchand Dattaram Kadam, Chetan Sureshkumar Shah

Key dates

this monthRegisteredMay 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2024
  • Promised completion13 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed76 files

Current status

52.0%Work done, per cost certificate

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Soham Heights - A WingNA130000
Soham Heights - B WingNA150000
Soham Heights - C WingNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 56%.

Soham Heights - A Wing51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure56%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks56%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Soham Heights - B Wing51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure56%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks56%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Soham Heights - C Wing51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure56%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks56%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed136

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots136
Closed/Covered136
BuildingClosed/CoveredTotal
Soham Heights - A Wing4646
Soham Heights - B Wing4545
Soham Heights - C Wing4545

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,310 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2025
LandownerVillageDistrict
Charkop Gajanan CHSLKandivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMhada
Permissible FSI13851.42
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBORIVALI WEST
Estimated costRs 160.50 cr
Cost incurredRs 83.46 cr
Work done52.0%
BuildingWingEstimatedIncurred
Soham Heights - A WingNARs 53.50 crRs 27.82 cr
Soham Heights - B WingNARs 53.50 crRs 27.82 cr
Soham Heights - C WingNARs 53.50 crRs 27.82 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. Charudatta V. Samant Of M/s CNS Consultants V Samant
EngineerMr. Priyank R Jain Of M/s. D.B.Infratech
EngineerVIRAJ P VARTAK
EngineerMr. Rupesh ChowdharyOf M/s. Unisteps Consulting Pvt. Ltd
EngineerMr. Reet D Shah Of M/s.D.B.Infratech
Chartered AccountantCA Kamlesh Gohil
Chartered AccountantAIMV & Associates
Chartered AccountantAkshay Kirtikumar & Associates LLP
Chartered AccountantDHEERAJ RAJESH YADAV
PartnerRole in project
SAGAROM DB INFRA LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 13 Dec 2027

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 revised.pdf5 May 2026
Withdrawal Update Form 2File: Form 2.pdf5 May 2026
Withdrawal Update Form 3File: FORM 3 Sagarom Q4 FY25-26.pdf5 May 2026
Withdrawal Update Form 1File: Form 1 19-01.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 - 19-01-2026 rev.pdf9 Feb 2026
Withdrawal Update Form 3File: SAGAROM DB INFRA LLP- FROM3_Q3 (1).pdf9 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 sagar.pdf14 Nov 2025
Withdrawal Update Form 1File: FORM -1.pdf16 Oct 2025
Withdrawal Update Form 2File: Form 2 - 05-10-2025.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3_Q2 FY 25-26_Sagarom (1).pdf16 Oct 2025
Withdrawal Update Form 1File: form 1 5-07-2025.pdf20 Jul 2025
Withdrawal Update Form 1File: form 1 5-07-2025.pdf20 Jul 2025
Withdrawal Update Form 1File: form 1 5-07-2025.pdf20 Jul 2025
Withdrawal Update Form 1File: form 1 5-07-2025.pdf20 Jul 2025
Withdrawal Update Form 2File: Engineer's Certificate.pdf20 Jul 2025
Withdrawal Update Form 2File: Engineer's Certificate.pdf20 Jul 2025
Withdrawal Update Form 2File: Engineer's Certificate.pdf20 Jul 2025
Withdrawal Update Form 2File: Engineer's Certificate.pdf20 Jul 2025
Withdrawal Update Form 3File: form 3 Q1 FY 25-26.pdf20 Jul 2025
Withdrawal Update Form 3File: form 3 Q1 FY 25-26.pdf20 Jul 2025
Withdrawal Update Form 3File: form 3 Q1 FY 25-26.pdf20 Jul 2025
Withdrawal Update Form 3File: form 3 Q1 FY 25-26.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -14-04-2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 14-04-2025.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QUALITY CERTIFICATE - 14-04-2025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 9 Jan 2025 (1).pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-24.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf3 Feb 2025
Declaration about Commencement CertificateFile: 11898_CCRevalidation_signed.pdf14 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 11314_furthercc_signed.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Oct 2024
Layout approvalFile: IOD GAJANAN_compressed-1.pdf22 Oct 2024
Layout approvalFile: IOD GAJANAN_compressed-2.pdf22 Oct 2024
Building plan approvalFile: iod.pdf22 Oct 2024
Copy of Layout Approval (in case of layout)File: IOD GAJANAN_compressed-1.pdf22 Oct 2024
Copy of Layout Approval (in case of layout)File: IOD GAJANAN_compressed-2.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: iod.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 2024.pdf8 Jul 2024
Deviation Report with respect to Allotment letterFile: allotment deviation 0705.pdf7 May 2024
Deviation Report with respect to model copy of AgreementFile: agreement deviation 0705.pdf7 May 2024
Proforma of Allotment letterFile: allotment 03-05.pdf3 May 2024
Proforma of Agreement for saleFile: AFS new 03-05 5pm.pdf3 May 2024
Other - LegalFile: Format D 15-04.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sagarom db infra_compressed.pdf28 Mar 2024
Copy of the legal title reportFile: Title Scan New.pdf27 Mar 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf27 Mar 2024
CERSAI detailsFile: Cersai Declaration.pdf27 Mar 2024
Other - LegalFile: Sagarom Annexure A.pdf23 Feb 2024
Building plan approvalFile: IOD sagarom db_compressed (1).pdf22 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD sagarom db_compressed (1).pdf22 Feb 2024
Other - LegalFile: Lease Deed Scanned_compressed (1)-compressed (1).pdf22 Feb 2024
Other - LegalFile: Sagarom partnership deed_compressed-compressed.pdf22 Feb 2024
Other - LegalFile: Sagarom Supplementary Partnership Deed.pdf22 Feb 2024
Other - LegalFile: Mhada mail Charkop Gajanan CHSL.pdf22 Feb 2024
Layout approvalFile: approved plan.pdf21 Feb 2024
Copy of Layout Approval (in case of layout)File: approved plan.pdf21 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Aneexure A Kadam sir.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Chetan Sir.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Dinesh Sir.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Hanumant Sir.pdf13 Feb 2024
Other - LegalFile: Offer Letter dated 14-09-23_compressed.pdf12 Feb 2024
Other - LegalFile: letter dated 24-08.pdf12 Feb 2024
PAN CardFile: Sagarom Pan Card.pdf3 Feb 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances.pdf3 Feb 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances.pdf3 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC charkop.pdf3 Feb 2024
Declaration in FORM BFile: form b.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 17-01-2024.pdf3 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Bipin Sir.pdf3 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf3 Feb 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Soham Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Charkop, Kandivali West6,700+ in Mumbai Suburban

2 kmSoham HeightsCompleted 15Lapsed / revoked 11Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: SAGAROM DB INFRA LLP

SAGAROM DB INFRA LLP has 1 registration on MahaRERA, including Soham Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Soham Heights is delayed beyond 13 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Soham Heights?

The registered promoter entity is SAGAROM DB INFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Soham Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Soham Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Soham Heights?

The professionals named in the filing: Architect: Mr. Charudatta V. Samant Of M/s CNS Consultants V Samant; Engineer: Mr. Priyank R Jain Of M/s. D.B.Infratech; Engineer: VIRAJ P VARTAK; Engineer: Mr. Rupesh ChowdharyOf M/s. Unisteps Consulting Pvt. Ltd; Engineer: Mr. Reet D Shah Of M/s.D.B.Infratech; Chartered Accountant: CA Kamlesh Gohil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Soham Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Soham Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Soham Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.