Registration lapsed No litigation declared Others project

SODHI PRESIDENCY

By SODHI BUILDERS

RG-MH-25381 · RERA P99000004245 · Last updated on MahaRERA portal: 16 Feb 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • 16 complaints at MahaRERA
  • Completion date moved by 54 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
17 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
16Complaints at MahaRERAon this registration
Jump to the 28 documents Report an error

SODHI PRESIDENCY is a Others project by SODHI BUILDERS in Palghar, Maharashtra, registered with MahaRERA as P99000004245 on 9 Aug 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 54 months from the original filing. 16 complaints are on record with the regulator.

At a glance

Project

  • NameSODHI PRESIDENCY
  • TypeOthers
  • Location
    • pam
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000004245
  • ReraGenie IDRG-MH-25381

Builder

  • NameSODHI BUILDERS
  • Entity typePartnership
  • PartnersKARTAR SINGH SODHI, KAMALJEET SINGH SODHI, JASBIR KAUR SODHI

Key dates

40 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 31 Dec 2018)
  • Buildings3 building records
  • Documents filed28 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 10NA60000
BUILDING NO 11NA60000
BUILDING NO 12NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

BUILDING 1063%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 1179%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
BUILDING NO 1276%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered75
BuildingClosed/CoveredTotal
BUILDING 102525
BUILDING NO 112525
BUILDING NO 122525

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,472 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAVI RATANRAJ BHANDARIMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Permissible FSI13104.09
Proposed, not sanctioned13,104 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMALAD MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNISHANT PATIL VASTU SHILP ASSOCIATES
EngineerYOGESH VAZA DARSH CONSULT
Chartered AccountantJaywant Kanase
PartnerRole in project
SODHI BUILDERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000008674Dec 2018 → Dec 2022

Reason as filed by the promoterWe have unsold premises in this project and due to current market scenario, we need some time

EXT99000001268Dec 2018 → Dec 2019

Reason as filed by the promoterOurs is a Residential cum Commercial Construction project located in rural area of Village Pam- Tembhi near Boisar in Palghar District. We registered our project as an Ongoing Project within time i.e before 31.07.2017. At the time of Registration the Proposed date of Completion was 31/07/2018 and we estimated our Revised Date of Completion as 31/12/2018. However, due to general recession in Real Estate Sector, funds dried up from the Financial Institutions in case of Housing Loans sanctioned to our customers and Introduction of GST changed Customers’ perception to book flats/shops only after t

Complaints filed with MahaRERA16

Case no.ComplainantRespondentFiled
CC006000000161354Rakesh Ramesh JaiswalSodhi Builders25/10/2019
CC006000000055297Sudip PandeySodhi Builders07/07/2018
CC006000000303570sudip pandeySodhi builders08/12/2022
CC006000000078393Salvador PintoSodhi Builders08/03/2019
CC006000000078399Cynthia Harriet PintoSodhi Builders08/03/2019
CC006000000078400Keegan PintoSodhi Builders08/03/2019
CC006000000182074Possession of PropertyKamaljeet Singh Sodhi01/11/2020
CC006000000220768Rakesh Ramesh JaiswalSodhi Developer11/04/2022
CC006000000292760GEETA PEREIRAM S SODHI BUILDERS05/10/2022
CC006000000344274Kawaljit Singh BangaSodhi Builders09/02/2023
CC006000000344275Kawaljit Singh BangaSodhi Builders09/02/2023
CC006000000354323Amrit Kaur AroraSodhi Builders13/02/2023
CC006000000429087Sodhi BuilderAmrit kaur Arora08/02/2024
CC006000000429088Sodhi BuilderKawaljeet Singh Banga08/02/2024
CC006000000580838Sodhi BuilderMr. Manjunath Kulkarni05/07/2024
CC12501508Rajendraprasad Tilakram AgarwalSODHI BUILDERS06/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Feb 2023

Documents filed28

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Building No 12_11zon.pdf16 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 Building No 12.pdf15 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certiicate_compressed.pdf27 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certiicate.pdf26 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf26 Jan 2020
Certificates of CA (Form 5)File: sodhi form 5_compressed.pdf22 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: sodhi form 5_compressed.pdf22 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-upload.pdf2 Jan 2019
Certificates of CA (Form 3)File: CA Certificate.pdf2 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf31 Dec 2018
Certificates of CA (Form 5)File: Form No 5.pdf31 Dec 2018
Building plan approvalFile: building plan B2 B3.pdf28 Jul 2017
Building plan approvalFile: building plan B B1.pdf28 Jul 2017
Layout approvalFile: layout.pdf28 Jul 2017
PAN CardFile: PAN.pdf28 Jul 2017
Copy of the legal title reportFile: TITAL CERTIFICATE.pdf28 Jul 2017
Details of encumbrancesFile: No encumbrances certificate.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: layout.pdf28 Jul 2017
Building Plan Approval (IOD)File: building plan B B1.pdf28 Jul 2017
Building Plan Approval (IOD)File: building plan B2 B3.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC1.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC2.pdf28 Jul 2017
Declaration in FORM BFile: Declaration Agreement.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA certificate.pdf28 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf28 Jul 2017
Proforma of Allotment letterFile: AGREEMENT.pdf28 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 54 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SODHI PRESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near pam3,200+ in Palghar

2 kmSODHI PRESIDENCYCompleted 2Lapsed / revoked 5Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: SODHI BUILDERS

SODHI BUILDERS has 1 registration on MahaRERA, including SODHI PRESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that SODHI PRESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SODHI PRESIDENCY is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SODHI PRESIDENCY?

The registered promoter entity is SODHI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SODHI PRESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SODHI PRESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SODHI PRESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SODHI PRESIDENCY?

The professionals named in the filing: Architect: NISHANT PATIL VASTU SHILP ASSOCIATES; Engineer: YOGESH VAZA DARSH CONSULT; Chartered Accountant: Jaywant Kanase. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SODHI PRESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SODHI PRESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SODHI PRESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.