Registration lapsed No litigation declared Residential / Group Housing project

SODAH SADAN

By UNISPACE LANDMARK PRIVATE LIMITED

RG-MH-11652 · RERA P51900006024 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • 3 complaints at MahaRERA
  • Completion date moved by 54 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2023Possession promised40 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
3Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

SODAH SADAN is a Residential / Group Housing project by UNISPACE LANDMARK PRIVATE LIMITED in 400019, registered with MahaRERA as P51900006024 on 14 Aug 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 54 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSODAH SADAN
  • TypeResidential / Group Housing
  • Location
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900006024
  • ReraGenie IDRG-MH-11652

Builder

  • NameUNISPACE LANDMARK PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsHEMANT NAGINDAS ARYA, RUPAL HEMANT ARYA
  • Declared earlier projects1 →

Key dates

40 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed43 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SODAH SADANNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

SODAH SADAN: 99% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered1
Open Space4

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area489 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1980.98
Proposed, not sanctioned1,981 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJ NIKETAN, 356, BANDARKAR ROAD, MATUNGA

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHAVI J KAWA FOR J G KAWA & ASSOCIATES
PartnerRole in project
UNISPACE LANDMARK PRIVATE LIMITED-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900005175Dec 2018 → Dec 2020

Reason as filed by the promoterPlease be informed that, our Project is MCGM Estate plot under 33(7) DCR- Re-development scheme whereby to reach to Commencement Certificate., major period lapses from the date of Development Agreement. Total process of obtaining various MCGM / MHADA Estate N.O.C.s. prior to commencement Certificate was a night-mare. We have C.C. dated 31/03/2016 and present status of the project having 90% completion up to 31/03/2019, yet facing many financial challenges to complete construction for obtaining Occupation Certificate (O.C.) Hence, need minimum one year extention i.e. up to 31st December 2020. F

EXT51900001208Dec 2018 → Dec 2020

Reason as filed by the promoterSir / Madam, Please be informed that, our Project is MCGM Estate plot under 33(7) DCR- Re-development scheme whereby to reach to Commencement Certificate., major period lapses from the date of Development Agreement. Total process of obtaining various MCGM / MHADA Estate N.O.C.s. prior to commencement Certificate is a night-mare. We have C.C. dated 31/03/2016 and present status of the project having various difficulties for completion need minimum one year extention i.e. up to 31st December 2019.

EXT51900012612Dec 2018 → Jun 2023

Reason as filed by the promoterThe Construction industry is one of the main sectors that provide important contribution for the development of an economy. However, many projects experienced extensive delays due to major Govt. Policies implementation like i) Demonetisation, ii) GST, iii) RERA & iv) Covid - 19 and lastly Omicron Variant in 2022, Ukrain War etc. consequences of such series of unforeseen events from November 2016 to till date, construction industry were bleeding and thereby it has costed time, efforts, higher cost on end product and likely negative impact on financial projections. Change of government policies

EXT51900010039Dec 2018 → Mar 2022

Reason as filed by the promoterOur Project is MCGM Estate Plot under DCR 33(7) re-development scheme. It is not a freehold land. Therefore we need to obtain No. of N.O.C.s from M.C.G.M. Estate / MHADA Department prior to commencement of the project as well as on completion of project. Change of government policies on and often leads to difficulty in obtaining permission. Further Permissions / all N.O.C.s to be obtain from various places which is not under one roof as many independent body as follows : (i) MCGM Estate - Independent Department, (ii) MCGM Building Proposal - Independent Department, (iii) C.F.O. Department - In

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000196408Dharmesh SodahUnispace Landmark Pvt. Ltd.28/07/2022
CC006000000209871Vivek Manohar NayakM/s Unispace Landmark Pvt Ltd02/02/2022
CC006000000354475ATUL HIRALAL SHAHMS UNISPACE LANDMARK PVT LTD23/02/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect.pdf23 Apr 2025
Certificates of CA (Form 3)File: Form 3 - CA.pdf3 Apr 2025
CERSAI detailsFile: Undertaking - Cersai.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Declaration -RERA Designated Bank Account.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - Booked Inventory.pdf7 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration -RERA Designated Bank Account.pdf7 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CA - March 2022.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Eng Certificate - March 2022.pdf3 Dec 2024
Proforma of Agreement for saleFile: Proforma Agreement for Sale.pdf3 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A - Disclosure Other Organisation.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eng Certificate - March 2023.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA - March 2023.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Eng Certificate - March 2024.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA - March 2024.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Booked Inventory - 02-11-22.pdf2 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure Sold Booked Inventory.pdf12 Oct 2022
Declaration about Commencement CertificateFile: Declaration for CC.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate - Jun-2019.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate - Sep-2019.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate - Dec-2019.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Certificate - Mar-2020.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate - June 2020.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate - September 2020.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate - December 2020.pdf26 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Certificate - Mar-2021.pdf26 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA Certificate - Fy 2018-2019.pdf26 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certificate FY 2019 -2020.pdf26 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Letter for FY 2020-2021.pdf26 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf25 Jun 2021
Certificates of CA (Form 5)File: FORM 5.pdf23 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: Sodah Sadan CC.pdf12 Oct 2018
Proforma of Allotment letterFile: Draft LOA AND Agreement for Sale.pdf29 Jul 2017
Details of encumbrancesFile: Non Emcumbrance Certificate084.pdf27 Jul 2017
Declaration in FORM BFile: Affidavit cum Declaration.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf27 Jul 2017
Layout approvalFile: Sheet_01.pdf26 Jul 2017
Building plan approvalFile: Sodah Sadan Merge.pdf26 Jul 2017
PAN CardFile: PAN.pdf26 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Sheet_01.pdf26 Jul 2017
Building Plan Approval (IOD)File: Sodah Sadan Merge.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rera 077.pdf26 Jul 2017
Certificates of CA (Form 3)File: Ashok Parekh CA Certificate - 1.pdf26 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
Annapurna BhuvanPlot No. 456, Mahilashram Road, Matunga East, Mumbai - 19CompletedApr 2017Apr 2017

Keep SODAH SADAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmSODAH SADANCompleted 43Lapsed / revoked 17Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: UNISPACE LANDMARK PRIVATE LIMITED

UNISPACE LANDMARK PRIVATE LIMITED has 1 registration on MahaRERA, including SODAH SADAN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record.

Frequently asked questions

What does it mean that SODAH SADAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SODAH SADAN is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SODAH SADAN?

The registered promoter entity is UNISPACE LANDMARK PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SODAH SADAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SODAH SADAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SODAH SADAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SODAH SADAN?

The professionals named in the filing: Architect: BHAVI J KAWA FOR J G KAWA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SODAH SADAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SODAH SADAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SODAH SADAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.