Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 36 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 33%
49 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Snehmai Co Op Housing Society Limited Nashik is a Others project by Snehmai Co Op Housing Society Limited Nashik in Nashik, Maharashtra, registered with MahaRERA as P51600049008 on 24 Jan 2023. Possession is promised by 30 Apr 2029. The completion date has moved by 36 months from the original filing. 0 of the 49 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSnehmai Co Op Housing Society Limited Nashik
  • TypeOthers
  • Location
    • Yashodha Nagar
    • In Front of ST Workshop
    • Nashik (M Corp.)
    • Nashik
    • 422003
  • Pincode422003
  • RERA no.P51600049008
  • ReraGenie IDRG-MH-68802

Builder

  • NameSnehmai Co Op Housing Society Limited Nashik
  • Entity typeSociety
  • ChairpersonSunil Ekanath Loharkar
  • SecretorySanjeev Gajanan Rasane

Key dates

this monthRegisteredJan 2023First promiseApr 2026Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 30 Apr 2026)
  • Buildings1 building record
  • Documents filed88 files

Current status

0%0 of 49 units booked
14.6%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Snehmai Co Op Housing Society Limited NashikNA87361349

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 33%.

Snehmai Co Op Housing Society Limited Nashik: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered28
Open Space54

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area913 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTown planning Department Nashik Municipal Corporation
Permissible FSI2944.5
Proposed, not sanctioned2,944 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchL 3 G 3 Suyojit Trade Centre, Opp Rajiv Gandhi Bhavan,Sharanpur Road, Nashik 422002
Estimated costRs 6.95 cr
Cost incurredRs 1.02 cr
Work done14.62%
BuildingWingEstimatedIncurred
Snehmai Co Op Housing Society Limited NashikNARs 6.95 crRs 1.02 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHOK JAMDAR
EngineerNANDKISHOR HAGOTE
Chartered AccountantPRASAD SUNIL YEOLA
Chartered AccountantBHALGAT BOTHRA AND ASSOCIATES
PartnerRole in project
Snehmai Co Op Housing Society Limited Nashik-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24062621504Apr 2026 → Apr 2029

Reason as filed by the promoterMAJOR CONSTRUCTION AND FINISHING WORKS IN THE APARTMENTS ARE STILL PENDING DUE TO THE SHORTAGE AND AVAILABILITY ISSUES OF LABOUR AND CONSTRUCTION MATERIALS. WE ARE COMMITTED TO PROVIDING GOOD QUALITY CONSTRUCTION WORK TO OUR ALLOTTEES AND DO NOT WISH TO COMPROMISE ON THE QUALITY OF LABOUR AND MATERIALS, AND THEREFORE SOME DELAY HAS OCCURRED IN COMPLETING THE REMAINING WORK. NEVERTHELESS, WE ARE FULLY COMMITTED TO COMPLETING THE PROJECT AT THE EARLIEST POSSIBLE TIME AND OBTAINING THE FULL COMPLETION CERTIFICATE FROM THE COMPETENT AUTHORITY.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf24 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Jun 2026
Withdrawal Update Form 1File: FORM 1 MARCH 2026.pdf14 May 2026
Withdrawal Update Form 2File: FORM 2 MARCH 2026.pdf14 May 2026
Withdrawal Update Form 3File: FORM 3 2025-26.pdf14 May 2026
Form 2A (FY 2025-2026)File: FORM 2A 2025-26.pdf14 May 2026
Form 5 (FY 2025-2026)File: FORM 5 MARCH 2025-26.pdf14 May 2026
Withdrawal Update Form 1File: form 1 DEC 2025.pdf13 Feb 2026
Withdrawal Update Form 2File: form 2 DEC 2025.pdf13 Feb 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025.pdf13 Feb 2026
Withdrawal Update Form 1File: FORM 1 JUNE 2025.pdf12 Feb 2026
Withdrawal Update Form 1File: FORM 1 SEPT 2025.pdf12 Feb 2026
Withdrawal Update Form 2File: FORM 2 JUNE 2025.pdf12 Feb 2026
Withdrawal Update Form 2File: form 2 SEPT 2025.pdf12 Feb 2026
Withdrawal Update Form 3File: FORM 3 JUNE 2025.pdf12 Feb 2026
Withdrawal Update Form 3File: FORM 3 SEPT 2025.pdf12 Feb 2026
Form 1File: FORM 1.pdf2 Sep 2025
Form 2File: Form 2_0001.pdf2 Sep 2025
Form 3File: form 3_0001.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: inventoey_0001.pdf2 Sep 2025
Form 1File: FORM 1 DEC 2024.pdf2 Sep 2025
Form 2File: FORM 2 DEC 2024_11zon.pdf2 Sep 2025
Form 3File: FORM 3 DEC 2024_11zon.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: inventoey_0001.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: inventoey_0001.pdf2 Sep 2025
Form 1File: FORM -1 SEPT 2024.pdf2 Sep 2025
Form 2File: FORM 2 SEPT 2024_11zon.pdf2 Sep 2025
Form 3File: FORM 3 SEPT 2024_11zon.pdf2 Sep 2025
Form 1File: FORM -1 JUNE 2024.pdf2 Sep 2025
Form 2File: FORM 2 JUNE 2024_11zon.pdf2 Sep 2025
Form 3File: FORM 3 JUNE 2024_11zon.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: inventoey_0001.pdf2 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf2 Sep 2025
Withdrawal Update Form 2File: Form 2_0001.pdf2 Sep 2025
Withdrawal Update Form 3File: form 3_0001.pdf2 Sep 2025
Form 5 (FY 2024-2025)File: form 5_0001.pdf2 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 2024.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 2024.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 2024.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 2024.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2024.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2024.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 2024.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 2024.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2024.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2023.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH2024.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2022-23.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-24.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 2024.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2023.pdf26 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 2023.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 3 DEC 2023.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 2023.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2023.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2022-23.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dt 18-10-2023.pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dt 18-07-2023.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dt 18-10-2023.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dt 18-07-2023.pdf4 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure.pdf2 Jun 2023
Other - TechnicalFile: 2A.pdf2 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architec Certificate-Snehmai Society.pdf29 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Snehmai 18-04-2023.pdf29 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Snehmai CA Certificate Form no 3_compressed.pdf29 Apr 2023
Copy of the legal title reportFile: ilovepdf_merged.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf11 Jan 2023
Layout approvalFile: Drawing 1_.pdf14 Dec 2022
Building plan approvalFile: Drawing 1_.pdf14 Dec 2022
Details of encumbrances concerned to FinanceFile: EC concerned to Legal.pdf14 Dec 2022
Details of encumbrances concerned to LegalFile: EC concerned to Legal.pdf14 Dec 2022
Copy of Layout Approval (in case of layout)File: Drawing 1_.pdf14 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1_.pdf14 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf14 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Snehmai CA certificate.pdf14 Dec 2022
Proforma of Agreement for saleFile: Agreement of Sale.pdf14 Dec 2022
PAN CardFile: Pan Card.pdf8 Dec 2022
Details of encumbrances concerned to FinanceFile: EC concerned to Finance.pdf8 Dec 2022

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 36 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Snehmai Co Op Housing Society Limited Nashik on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near In Front of ST Workshop4,100+ in Nashik

Builder: Snehmai Co Op Housing Society Limited Nashik

Snehmai Co Op Housing Society Limited Nashik has 1 registration on MahaRERA, including Snehmai Co Op Housing Society Limited Nashik. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Snehmai Co Op Housing Society Limited Nashik is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Snehmai Co Op Housing Society Limited Nashik?

The registered promoter entity is Snehmai Co Op Housing Society Limited Nashik, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Snehmai Co Op Housing Society Limited Nashik?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Snehmai Co Op Housing Society Limited Nashik?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Snehmai Co Op Housing Society Limited Nashik?

The professionals named in the filing: Architect: ASHOK JAMDAR; Engineer: NANDKISHOR HAGOTE; Chartered Accountant: PRASAD SUNIL YEOLA; Chartered Accountant: BHALGAT BOTHRA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Snehmai Co Op Housing Society Limited Nashik?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Snehmai Co Op Housing Society Limited Nashik. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Snehmai Co Op Housing Society Limited Nashik to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.