Registration lapsed No litigation declared Residential / Group Housing project

Sneha Avenue

By Nandu Antaram Rajput

RG-MH-86008 · RERA P52100049963 · Last updated on MahaRERA portal: 18 Oct 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 90%
7 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Sneha Avenue is a Residential / Group Housing project by Nandu Antaram Rajput in Pune, Maharashtra, registered with MahaRERA as P52100049963 on 6 Mar 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 21 of the 28 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSneha Avenue
  • TypeResidential / Group Housing
  • Location
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049963
  • ReraGenie IDRG-MH-86008

Builder

  • NameNandu Antaram Rajput
  • Entity typeIndividual
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredMar 2023First promiseDec 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Mar 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed92 files

Current status

75%21 of 28 units booked
28.4%Work done, per cost certificate

Figures as on 18 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA5428028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Building A: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 18 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes70%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Closed/Covered35
Open Space2

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025
LandownerVillageDistrict
Late Samina Nandu RajputWarjePune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY
Permissible FSI3048.38
Proposed, not sanctioned3,048 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWarje Pune 411058
Estimated costRs 3.43 cr
Cost incurredRs 97.46 lakh
Work done28.42%
BuildingWingEstimatedIncurred
Building ANARs 3.18 crRs 97.46 lakh
-NARs 25.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCS Architects Shivanand S Swami
EngineerGautam Waghmmare
Chartered AccountantCA Devendra Dugad and associates
PartnerRole in project
Nandu Antaram Rajput-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19122518775Dec 2025 → Jun 2026

Reason as filed by the promoterThe project has been duly completed, and the application for the Occupancy/Completion Certificate has been submitted to the competent authority and is currently under process. The issuance of the certificate is expected to take additional time. We hereby seek extension for six months.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_SnehAvenue_Sep 25.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2_Sneha Avenue_Sep 25.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3_Sneh Aveue_Sep 25.pdf18 Oct 2025
Withdrawal Update Form 1File: Architect certificate new.pdf29 Jul 2025
Withdrawal Update Form 2File: Eng certificate New.pdf29 Jul 2025
Withdrawal Update Form 3File: CA certificate new.pdf29 Jul 2025
Form 1File: Mar-2023.pdf28 Jul 2025
Form 2File: Eng certi March 2023.pdf28 Jul 2025
Form 3File: Mar-2023.....pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: March 2023.pdf28 Jul 2025
Form 1File: Form 1_jun-2023.pdf28 Jul 2025
Form 2File: Form 2_Eng certi june 2023.pdf28 Jul 2025
Form 3File: Form 3_Jun-2023.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: june 23.pdf28 Jul 2025
Form 1File: Form 1_Sep-2023.pdf28 Jul 2025
Form 2File: Form 2_Eng Certi Sept 2023.pdf28 Jul 2025
Form 3File: Form 3_sep-2023.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sep 23.pdf28 Jul 2025
Form 1File: Form 1_Dec-2023.pdf28 Jul 2025
Form 2File: Form 2_Eng certi Dec 2023.pdf28 Jul 2025
Form 3File: Form 3_Dec-2023.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Dec 23.pdf28 Jul 2025
Form 1File: Form 1_Mar-2024.pdf28 Jul 2025
Form 2File: Form 2_Eng certi Mar 2024.pdf28 Jul 2025
Form 3File: Form 3_MAr-2024.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Mar 24.pdf28 Jul 2025
Form 1File: Form 1_Architect june 2024.pdf28 Jul 2025
Form 2File: Form 2_Eng certi june 2024.pdf28 Jul 2025
Form 3File: Form 3_June 2024.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: june 24.pdf28 Jul 2025
Form 1File: Form 1_Arch Certi September 2024.pdf28 Jul 2025
Form 2File: Form 2_Eng Certi Sept 2024.pdf28 Jul 2025
Form 3File: Form 3_Sep-2024.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sep 24.pdf28 Jul 2025
Form 1File: Form 1_Architect December 2024.pdf28 Jul 2025
Form 2File: Form 2_Eng certi Dec 2024.pdf28 Jul 2025
Form 3File: Form 3_DEC 2024.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Dec 24.pdf28 Jul 2025
Form 1File: Form 1_Architect March 2025.pdf28 Jul 2025
Form 2File: Form 2_Eng Certi March 2025.pdf28 Jul 2025
Form 3File: Form 3_MARCH 2025.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Mar 25.pdf28 Jul 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Acknowledgemt of RERA.pdf18 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declarartion about separate Bank Acc.pdf18 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Acknowledgemt of RERA.pdf18 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declarartion about separate Bank Acc.pdf18 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Acknowledgemt of RERA.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SEP2024.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: CA CERTIFICATE JUNE 2024.pdf2 Dec 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter 001.pdf9 May 2024
Proforma of Agreement for saleFile: Bhugaon RERA Submitted FInal Draft.pdf9 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Bank.pdf9 May 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate-2.pdf8 May 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate-1.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 06-Feb-2024.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 06-Feb-2024 (1).pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 06-Feb-2024 (2).pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 20-Mar-2024 (4).pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate March 2024.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate March 2023.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate june.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate sept.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate December .pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate March 2024.pdf8 May 2024
Layout approvalFile: PLAN VISIBLE Doc11compressed HIGHLIGHTED.pdf26 Feb 2023
PAN CardFile: PAN CARD 1NARAJPUT1.pdf26 Feb 2023
Copy of the legal title reportFile: Sqm Legal search with Marathi flow.pdf26 Feb 2023
Details of encumbrances concerned to FinanceFile: LH Encumbrances letter FINANCE.pdf26 Feb 2023
Details of encumbrances concerned to LegalFile: LH Encumbrances letter FINANCE.pdf26 Feb 2023
Copy of Layout Approval (in case of layout)File: PLAN VISIBLE Doc11compressed HIGHLIGHTED.pdf26 Feb 2023
Declaration about Commencement CertificateFile: Letterhead Declaration about CC new.pdf26 Feb 2023
Other - TechnicalFile: plinth completion certificate.pdf26 Feb 2023
Building plan approvalFile: 2 HPSC1016compressed.pdf31 Jan 2023
Building plan approvalFile: 3 HPSC1015compressed.pdf31 Jan 2023
Building plan approvalFile: 4 HPSC1014compressed.pdf31 Jan 2023
Building plan approvalFile: 5 HPSC1013compressed.pdf31 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 HPSC1016compressed.pdf31 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 3 HPSC1015compressed.pdf31 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 4 HPSC1014compressed.pdf31 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 HPSC1013compressed.pdf31 Jan 2023

How this compares with Pune

75%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sneha Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

2 kmSneha AvenueCompleted 42Lapsed / revoked 28Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: Nandu Antaram Rajput

Nandu Antaram Rajput has 3 registrations on MahaRERA, including Sneha Homes and SNEHA PARADISE E. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Sneha Avenue shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sneha Avenue is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sneha Avenue?

The registered promoter entity is Nandu Antaram Rajput, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sneha Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sneha Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sneha Avenue?

The professionals named in the filing: Architect: CS Architects Shivanand S Swami; Engineer: Gautam Waghmmare; Chartered Accountant: CA Devendra Dugad and associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sneha Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sneha Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sneha Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.