Home / Browse projects / Mumbai Suburban, Maharashtra / Smriti
Smriti
RG-MH-05300 · RERA P51800050592 · Last updated on MahaRERA portal: 28 Jan 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Smriti is a Residential / Group Housing project by Mahesh Balkrishna Sambhus in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050592 on 21 Apr 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. 7 of the 11 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSmriti
- TypeResidential / Group Housing
- Location
- ROAD NO 3
- GOREGAON EAST
- Goregaon
- Borivali
- Mumbai Suburban
- 400063
- Pincode400063
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800050592
- ReraGenie IDRG-MH-05300
Builder
- NameMahesh Balkrishna Sambhus
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Apr 2023
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed69 files
Current status
Figures as on 28 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Smriti | NA | 12 | 11 | 11 | 0 | 11 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Smriti: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Yadnesh Balkrishna Sambhus | Goregaon | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Smriti | NA | Rs 7.14 cr | Rs 7.86 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCORD ARCHITECTS & DESIGNERS |
| Architect | RUTU SAMANT |
| Architect | RUTA SAMANT |
| Engineer | Deshmukh & Associates |
| Engineer | JACOB D'SOUZA |
| Engineer | SHIVPRAKASH TIWARI |
| Chartered Accountant | NEHALI & CO |
| Chartered Accountant | JIMIT SHAH |
| Partner | Role in project |
|---|---|
| Mahesh Balkrishna Sambhus | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC Plans.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: form2.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 17 Jan 2026 |
| Occupational CertificateFile: 2455142_OC_signed.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: form1 smriti.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: form2 smriti.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: Signed CA Certificate-Vishwas sept 25.pdf | 28 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A 24-25.PDF | 16 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate-Vishwas march25.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Smriti Form 2.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Smriti Form 2.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 8 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 2023-24.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 2023-24.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 2023-24.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 2023-24.pdf | 7 Oct 2024 |
| Form 5 (FY 2023-2024)File: Signed Form 5_FY 23-24.pdf | 25 Sep 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 9 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 9 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 3 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf | 11 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Vishwas mar 24.pdf | 11 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 3 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 23.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DEC23.pdf | 11 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC23.pdf | 11 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Full FurtherCC.pdf | 27 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Architect Certificate Signed.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Engineer's Certificate_12 10 2023.pdf | 13 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate.pdf | 12 Oct 2023 |
| Proforma of Agreement for saleFile: RERA FINAL AGREEMENT.pdf | 11 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate_June, 2023.pdf | 12 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate_June, 2023.pdf | 12 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Vishwas June 23.pdf | 12 Jul 2023 |
| Building plan approvalFile: 2380049Amendletter_signed.pdf | 7 Jul 2023 |
| Layout approvalFile: Drawing (18)_230707_143432 (1).pdf | 7 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: Drawing (18)_230707_143432 (1).pdf | 7 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2380049Amendletter_signed.pdf | 7 Jul 2023 |
| Proforma of Allotment letterFile: smriti final allotment.pdf | 26 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed CA Certificate-Vishwas.pdf | 13 Apr 2023 |
| Proforma of Agreement for saleFile: 1 Other - Legal.pdf | 6 Apr 2023 |
| Layout approvalFile: Plans.pdf | 24 Mar 2023 |
| Building plan approvalFile: Smriti IOD.pdf | 24 Mar 2023 |
| PAN CardFile: Company pan card.pdf | 24 Mar 2023 |
| Copy of the legal title reportFile: TItle report.pdf | 24 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrance.pdf | 24 Mar 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrance.pdf | 24 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Plans.pdf | 24 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Smriti IOD.pdf | 24 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 24 Mar 2023 |
| Declaration about Commencement CertificateFile: CC declaration.pdf | 24 Mar 2023 |
| Declaration in FORM BFile: Form B mahesh.pdf | 24 Mar 2023 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 24 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 24 Mar 2023 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 24 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details.pdf | 24 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Dev allotment.pdf | 24 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report for agreement for sale.pdf | 24 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
Keep Smriti on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GOREGAON EAST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 446 registered projects within 2 km.
Elysian Tower C, D, E
Oberoi Realty Limited
Elysian Tower B
Oberoi Realty Limited
Elysian Tower A
Oberoi Realty Limited
Sheetal Sangam
DGS Township Pvt Ltd
SEJAL SQUARE
ALCHEMI DEVELOPERS PRIVATE LIMITED
Mehta Marquina 1978
Shreeram Builders
See every Mumbai Suburban project, with the district possession charts
Builder: Mahesh Balkrishna Sambhus
Mahesh Balkrishna Sambhus has 1 registration on MahaRERA, including Smriti. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Smriti is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Smriti?
The registered promoter entity is Mahesh Balkrishna Sambhus, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Smriti?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Smriti?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Smriti?
The professionals named in the filing: Architect: ARCORD ARCHITECTS & DESIGNERS; Architect: RUTU SAMANT; Architect: RUTA SAMANT; Engineer: Deshmukh & Associates; Engineer: JACOB D'SOUZA; Engineer: SHIVPRAKASH TIWARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Smriti?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback