Registration approved No litigation declared Residential/Group Housing project

SLV MIRAE

By SLV ESTATES

RG-KA-49068 · RERA PRM/KA/RERA/1251/446/PR/111126/009092 · Last updated on RERA Karnataka portal: 6 Nov 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared

Nothing adverse is on this record. The buyer report still lays out every unit and the land chain as filed and places this filing against the promoter's other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Mar 2030Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 144 documents Report an error

SLV MIRAE is a Residential/Group Housing project by SLV ESTATES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/111126/009092 on 11 Nov 2026. Possession is promised by 31 Mar 2030.

At a glance

Project

  • NameSLV MIRAE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560113
  • Pincode560113
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/111126/009092
  • ReraGenie IDRG-KA-49068

Builder

  • NameSLV ESTATES
  • Entity typePartnership Firm
  • GSTIN29ADZFS4025M1Z5
  • Authorized SignatoryRAMESH V
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2026PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Nov 2026
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed144 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SLV MIRAE---3340334

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 6 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership8

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,374 sq m
Named landowners8
LandownerVillageDistrict
A TEJASWINI--
N RAJU--
SHANKARAMMA--
A TEJASWINI--
SLV ESTATES--
A TEJASWINI--
N RAJU--
N RAJU--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 295.27 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 295.27 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDELLI BABU A
EngineerT Raghavendra
Chartered AccountantVenkatramana P

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed144

As listed on the registration, under the names the promoter filed them with; the newest 80 of 144 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/111126/009092 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
TITLE DEED 12_5File: TITLE GIFT DEED 12_5.pdf6 Nov 2026
MR 12_1 TO 12_2File: MR 12_1 TO 12_2.pdf6 Nov 2026
MR 12_2 TO 12_5File: MR 12_2 TO 12_5.pdf6 Nov 2026
TITLE DEED 16_1B 16_2BFile: TITLE GIFT DEED 16_1B 2B.pdf6 Nov 2026
TITLE 12_3File: TITLE 12_3.pdf30 Oct 2026
TITLE 12_4File: TITLE 12_4.pdf30 Oct 2026
TITLE 12_5File: TITLE 12_5.pdf30 Oct 2026
TITLE 16_1B 16_2BFile: TITLE 16_1a and 16_1b.pdf30 Oct 2026
EC 12_2File: 1 EC 12_2 MERGED.pdf30 Oct 2026
EC 12_3File: 2 EC 12_3 MERGED.pdf30 Oct 2026
EC 12_4File: 3 EC 12_4 MERGED.pdf30 Oct 2026
EC 12_5File: 4 EC 12_5 MERGED.pdf30 Oct 2026
EC 12_6File: 5 EC 12_6 MERGED.pdf30 Oct 2026
EC 13_1AFile: 6 EC 13_1A MERGED.pdf30 Oct 2026
EC 16_1BFile: 7 EC 16_1B MERGED.pdf30 Oct 2026
EC 16_2BFile: 8 EC 16_2B MERGED.pdf30 Oct 2026
JDA 12_4 ITEM NO 8File: JDA AGREEMENT 12_4.pdf30 Oct 2026
DP PLAN ORDERFile: DP PLAN ORDER.pdf30 Oct 2026
DP PLANFile: DP approved PLAN.pdf30 Oct 2026
KSPCB NOC CLARIFICATIONFile: KSPCB CLARIFICATION.pdf30 Oct 2026
AIRPORT NOCFile: AIRPORT NOC.PDF30 Oct 2026
STP DRAWINGFile: STP DRAWINGS.pdf30 Oct 2026
RTC, survey 12/2-
Mutation, survey 12/2-
Encumbrance Certificate, survey 12/2-
Conversion/Alienation Order, survey 12/2-
Sale/Title/Gift Deed, survey 12/2-
JDA, survey 12/2-
Khatha, survey 12/2-
RTC, survey 12/3-
Mutation, survey 12/3-
Encumbrance Certificate, survey 12/3-
Conversion/Alienation Order, survey 12/3-
Sale/Title/Gift Deed, survey 12/3-
JDA, survey 12/3-
Khatha, survey 12/3-
RTC, survey 12/4-
Mutation, survey 12/4-
Encumbrance Certificate, survey 12/4-
Conversion/Alienation Order, survey 12/4-
Sale/Title/Gift Deed, survey 12/4-
JDA, survey 12/4-
Khatha, survey 12/4-
RTC, survey 12/5-
Mutation, survey 12/5-
Encumbrance Certificate, survey 12/5-
Conversion/Alienation Order, survey 12/5-
Sale/Title/Gift Deed, survey 12/5-
JDA, survey 12/5-
Khatha, survey 12/5-
RTC, survey 12/6-
Mutation, survey 12/6-
Encumbrance Certificate, survey 12/6-
Conversion/Alienation Order, survey 12/6-
Sale/Title/Gift Deed, survey 12/6-
Khatha, survey 12/6-
RTC, survey 13/1A-
Mutation, survey 13/1A-
Encumbrance Certificate, survey 13/1A-
Conversion/Alienation Order, survey 13/1A-
Sale/Title/Gift Deed, survey 13/1A-
JDA, survey 13/1A-
Khatha, survey 13/1A-
RTC, survey 16/1B-
Mutation, survey 16/1B-
Encumbrance Certificate, survey 16/1B-
Conversion/Alienation Order, survey 16/1B-
Sale/Title/Gift Deed, survey 16/1B-
JDA, survey 16/1B-
Khatha, survey 16/1B-
RTC, survey 16/2B-
Mutation, survey 16/2B-
Encumbrance Certificate, survey 16/2B-
Conversion/Alienation Order, survey 16/2B-
Sale/Title/Gift Deed, survey 16/2B-
JDA, survey 16/2B-
Khatha, survey 16/2B-
Registration CertificateFile: FirmRegistration.pdf-
GST CertificateFile: SLV ESTATES GST REGISTRATION CERTIFICATE.pdf-
Partnership DeedFile: Partnership Deed.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SLV FEDORASLV Fedora located at Yelahanka Bangalore which consists of 2/3 BHK Apartments with good amenities. With CC&OC, BDA approvedCompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Free monthly report: Bengaluru on RERA Karnataka, month by month. What registered each month, the flat types and carpet areas being built, the taluks and the completion pipeline, from these same filings.

Keep SLV MIRAE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSLV MIRAEOther 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: SLV ESTATES

SLV ESTATES has 2 registrations on RERA Karnataka, including SLV MIRAE and SLV FEDORA. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SLV MIRAE is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SLV MIRAE?

The registered promoter entity is SLV ESTATES, a partnership firm as per the filing. Its GSTIN 29ADZFS4025M1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SLV MIRAE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SLV MIRAE?

The professionals named in the filing: Architect: DELLI BABU A; Engineer: T Raghavendra; Chartered Accountant: Venkatramana P. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SLV MIRAE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SLV MIRAE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SLV MIRAE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.