Red flags

  • 472 complaints at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Jul 2025Possession promisedmoved 21 months from the original
472Complaints at RERA Karnatakaon this registration
Jump to the 56 documents Report an error

GM AMBITIOUS ENCLAVE is a Residential/Group Housing project by M/s. Allam Infinite India Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180406/001467 on 6 Apr 2018. Possession is promised by 30 Jul 2025. The completion date has moved by 21 months from the original filing. 472 complaints are on record with the regulator.

At a glance

Project

  • NameGM AMBITIOUS ENCLAVE
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/180406/001467
  • ReraGenie IDRG-KA-90595

Builder

  • NameM/s. Allam Infinite India Private Limited
  • Entity typeCompany
  • CINU70101KA2016PTC095043
  • Authorized SignatorySrinivasa Duggi Venkata Rao
  • Other registrations1 more →

Key dates

this monthRegisteredApr 2018First promiseOct 2023Revised toJul 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Apr 2018
  • Promised completion30 Jul 2025
  • Revised completionRevised to 30 Jul 2025 (originally 31 Oct 2023)
  • Buildings6 building records
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1---5010501
A2---4940494
A3---5000500
B1---2980298
B2---2980298
C---2680268

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area41,889 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 698.93 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Jayaprakash Narayan
EngineerMr.B.E.Pruthviraja

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionOct 2023 → Jul 2024

No reason recorded in the filing

EX/PRM/KA/RERA/1251/308/PR/250325/001467Jul 2024 → Jul 2025

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka472

Case no.ComplainantRespondentFiled
CMP/190211/0002102-M/s. Allam Infinite India Private Limited11/02/2019
CMP/190228/0002314-M/s. Allam Infinite India Private Limited28/02/2019
CMP/190430/0002813-M/s. Allam Infinite India Private Limited30/04/2019
CMP/190607/0003250-M/s. Allam Infinite India Private Limited07/06/2019
CMP/190607/0003253-M/s. Allam Infinite India Private Limited07/06/2019
CMP/190713/0003563-M/s. Allam Infinite India Private Limited13/07/2019
CMP/190721/0003596-M/s. Allam Infinite India Private Limited21/07/2019
CMP/190724/0003710-M/s. Allam Infinite India Private Limited24/07/2019
CMP/190730/0003699-M/s. Allam Infinite India Private Limited30/07/2019
CMP/190824/0003998-M/s. Allam Infinite India Private Limited24/08/2019
CMP/190830/0003983-M/s. Allam Infinite India Private Limited30/08/2019
CMP/191201/0004841-M/s. Allam Infinite India Private Limited01/12/2019
CMP/191219/0005019-M/s. Allam Infinite India Private Limited19/12/2019
CMP/200223/0005336-M/s. Allam Infinite India Private Limited23/02/2020
CMP/200315/0005729-M/s. Allam Infinite India Private Limited15/03/2020
CMP/200315/0005730-M/s. Allam Infinite India Private Limited15/03/2020
CMP/210119/0007471-M/s. Allam Infinite India Private Limited19/01/2021
CMP/210126/0007500-M/s. Allam Infinite India Private Limited26/01/2021
CMP/220113/0008792-M/s. Allam Infinite India Private Limited13/01/2022
CMP/220223/0009052-M/s. Allam Infinite India Private Limited23/02/2022
CMP/220314/0009121-M/s. Allam Infinite India Private Limited14/03/2022
CMP/220720/0009774-M/s. Allam Infinite India Private Limited20/07/2022
00006/2023-M/s. Allam Infinite India Private Limited04/01/2023
00080/2023-M/s. Allam Infinite India Private Limited17/01/2023
00273/2023-M/s. Allam Infinite India Private Limited02/03/2023
00287/2023-M/s. Allam Infinite India Private Limited04/03/2023
00340/2023-M/s. Allam Infinite India Private Limited16/03/2023
00452/2023-M/s. Allam Infinite India Private Limited10/04/2023
00458/2023-M/s. Allam Infinite India Private Limited10/04/2023
00606/2023-M/s. Allam Infinite India Private Limited28/04/2023
00868/2023-M/s. Allam Infinite India Private Limited01/06/2023
00920/2023-M/s. Allam Infinite India Private Limited09/06/2023
01109/2023-M/s. Allam Infinite India Private Limited18/07/2023
01261/2023-M/s. Allam Infinite India Private Limited17/08/2023
01303/2023-M/s. Allam Infinite India Private Limited01/09/2023
01490/2023-M/s. Allam Infinite India Private Limited25/09/2023
01618/2023-M/s. Allam Infinite India Private Limited21/10/2023
01620/2023-M/s. Allam Infinite India Private Limited21/10/2023
01752/2023-M/s. Allam Infinite India Private Limited23/11/2023
01824/2023-M/s. Allam Infinite India Private Limited14/12/2023
00005/2024-M/s. Allam Infinite India Private Limited01/01/2024
00091/2024-M/s. Allam Infinite India Private Limited20/01/2024
00127/2024-M/s. Allam Infinite India Private Limited29/01/2024
00149/2024-M/s. Allam Infinite India Private Limited31/01/2024
00158/2024-M/s. Allam Infinite India Private Limited01/02/2024
00168/2024-M/s. Allam Infinite India Private Limited05/02/2024
00169/2024-M/s. Allam Infinite India Private Limited05/02/2024
00186/2024-M/s. Allam Infinite India Private Limited13/02/2024
00195/2024-M/s. Allam Infinite India Private Limited16/02/2024
00207/2024-M/s. Allam Infinite India Private Limited20/02/2024
00293/2024-M/s. Allam Infinite India Private Limited19/03/2024
00301/2024-M/s. Allam Infinite India Private Limited21/03/2024
00399/2024-M/s. Allam Infinite India Private Limited18/04/2024
00470/2024-M/s. Allam Infinite India Private Limited24/05/2024
00536/2024-M/s. Allam Infinite India Private Limited04/06/2024
00551/2024-M/s. Allam Infinite India Private Limited06/06/2024
00559/2024-M/s. Allam Infinite India Private Limited07/06/2024
00565/2024-M/s. Allam Infinite India Private Limited11/06/2024
00617/2024-M/s. Allam Infinite India Private Limited20/06/2024
00660/2024-M/s. Allam Infinite India Private Limited03/07/2024

Documents filed56

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180406/001467 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Incorporation Certificate Allam.PDF-
Architect Certificate for Work Completion Schedule till DateFile: Arc Certificate - Work Completed Ambitious Enclave -06-01-2025 -.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Eng Certi work as on date (1).pdf-
CA Certificate for Funds UtilizationFile: Allam Form - Ex3 Chartered Accountant Certificate-SIGNED.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc Certificate - Work Pending Tower B -06-01-2025.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Eng Certi pening work.pdf-
CA Certificate for Funds required for Project CompletionFile: Allam Form - Ex4 Chartered Accountant Certificate-SIGNED.pdf-
AffidavitFile: Form 7 Ambitious.pdf-
Latest Encumbrance CertificateFile: Ambitious Enclave EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (3) (2).xlsx-
Commencement Certificate-
building & floor plan ambitious-
siteplan ambitious-
Proforma of Sale Deed-
Proforma of Sale & Construction Agreement-
Sale deed & RTC-
sction plan combined ambitious-
DP-
Proforma of Allotment Letter-
Brochure-
Project Specification-
EC-
Katha Application-
Contract Agreement for construction -Ambitious-
Sale deed & RTC-
conversion order-
NOC- Fire DGP-
Airport NOC-
Water acknowledgment of Nursery-
KSPCB-
SEIAA Ack-
BSNL NOC-
siteplan ambitious-
sction plan combined ambitious-
CLU-
Balance Sheet 2016 - 2017File: balance sheet.pdf-
Balance Sheet 2015 - 2016File: balance sheet.pdf-
Balance Sheet 2014 - 2015File: balance sheet.pdf-
Audited Profit and Loss Statement 2016 - 2017File: profit & loss.pdf-
Audited Profit and Loss Statement 2015 - 2016File: profit & loss.pdf-
Audited Profit and Loss Statement 2014 - 2015File: profit & loss.pdf-
Director's Report 2016 - 2017File: Director report.pdf-
Director's Report 2015 - 2016File: Director report.pdf-
Director's Report 2014 - 2015File: Director report.pdf-
Cash Flow Statement 2016 - 2017File: cash flow.pdf-
Cash Flow Statement 2015 - 2016File: cash flow.pdf-
Auditor's Report 2016 - 2017File: auditor report.pdf-
Auditor's Report 2015 - 2016File: auditor report.pdf-
Auditor's Report 2014 - 2015File: auditor report.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: IT Retuns 2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT Retuns 2017.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT Retuns 2017.pdf-
Affidavit-
Prospectus/BrochureFile: Ambitious Brochure .pdf-
Advertisement Copy 1File: Ambitious Enclave ad.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_180406_001467.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep GM AMBITIOUS ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: M/s. Allam Infinite India Private Limited

M/s. Allam Infinite India Private Limited has 2 registrations on RERA Karnataka, including GM AMBITIOUS ENCLAVE and GM NORTH ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if GM AMBITIOUS ENCLAVE is delayed beyond 30 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GM AMBITIOUS ENCLAVE?

The registered promoter entity is M/s. Allam Infinite India Private Limited, a company as per the filing. Its CIN U70101KA2016PTC095043 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GM AMBITIOUS ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GM AMBITIOUS ENCLAVE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at GM AMBITIOUS ENCLAVE?

The professionals named in the filing: Architect: Mr.Jayaprakash Narayan; Engineer: Mr.B.E.Pruthviraja. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GM AMBITIOUS ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GM AMBITIOUS ENCLAVE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GM AMBITIOUS ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.