Home / Browse projects / Pune, Maharashtra / SKYSPARSH REGENCY

Registration lapsed No litigation declared Residential / Group Housing project

SKYSPARSH REGENCY

By SKYSPARSH DEVELOPERS

RG-MH-20936 · RERA P52100013012 · Last updated on MahaRERA portal: 22 Aug 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 51 months past the filed date
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2022Possession promised51 months past this date
12 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 15%
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

SKYSPARSH REGENCY is a Residential / Group Housing project by SKYSPARSH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100013012 on 11 Sep 2017. Possession was promised by 31 Jul 2022 and is now 51 months past that date. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameSKYSPARSH REGENCY
  • TypeResidential / Group Housing
  • Location
    • PUNE
    • Bhukum
    • Mulshi
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100013012
  • ReraGenie IDRG-MH-20936

Builder

  • NameSKYSPARSH DEVELOPERS
  • Entity typePartnership
  • PartnersARUN MARATHE, VIKAS GAIKWAD, RAHUL RAYKAR

Key dates

51 months past promisethis monthRegisteredSep 2017First promiseJan 2021Revised toJul 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Sep 2017
  • Promised completion31 Jul 2022
  • Revised completionRevised to 31 Jul 2022 (originally 31 Jan 2021)
  • Buildings2 building records
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA110000
WING B AND AMENITY BUILDINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 15%.

A WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B AND AMENITY BUILDING29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes25%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PAWAR BUILDERS AND DEVELOPERSPune (CB)Pune

Approvals and building plan

Permissible FSI3400.0
Proposed, not sanctioned3,400 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDSK ROHIT BUILDING GROU ND FLOOR J M ROAD PUNE PUNE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAVI GAWARE
PartnerRole in project
SKYSPARSH DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009126Jan 2021 → Jan 2022

Reason as filed by the promoterPROJECT IS COMPLETED BUT AUTHORITY REQUIRING MORE TIME TO ISSUE COMPLETION CERTIFICATE.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Aug 2023

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SKYSPARSH part complition 47 48.pdf22 Aug 2023
Certificates of CA (Form 3)File: Skysparsh Regency.pdf28 Aug 2021
Declaration about Commencement CertificateFile: Commencement declaration.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (3).pdf15 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 (1).pdf15 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate (1).pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - SKYSPARSH.pdf15 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold unsold inventory SKY.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2019-2020.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-21.pdf15 Aug 2021
OtherFile: Affidavit cum Declaration Skysparsh_compressed.pdf15 Feb 2021
Certificates of CA (Form 3)File: Form 3.pdf12 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engi Cert.pdf9 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf9 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ArchITECT.pdf6 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ArchITECT.pdf6 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINER.pdf6 Mar 2020
Certificates of CA (Form 3)File: FORMNO3.pdf6 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf26 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINER CERTIFICATE.pdf26 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 17-18.pdf22 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19.pdf22 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engi Cert.pdf20 Feb 2020
Building plan approvalFile: MYSCAN_20191015_0002.PDF7 Nov 2019
Building plan approvalFile: MYSCAN_20191015_0003.PDF7 Nov 2019
Building plan approvalFile: MYSCAN_20191015_0004.PDF7 Nov 2019
Building plan approvalFile: MYSCAN_20191015_0005.PDF7 Nov 2019
Building plan approvalFile: MYSCAN_20191015_0006.PDF7 Nov 2019
Building plan approvalFile: MYSCAN_20191015_0007.PDF7 Nov 2019
Building plan approvalFile: MYSCAN_20191015_0008.PDF7 Nov 2019
Building plan approvalFile: MYSCAN_20191015_0009.PDF7 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191015_0002.PDF7 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191015_0003.PDF7 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191015_0004.PDF7 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191015_0005.PDF7 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191015_0006.PDF7 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191015_0007.PDF7 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191015_0008.PDF7 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191015_0009.PDF7 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: 1.pdf7 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: 2.pdf7 Nov 2019
Building plan approvalFile: Temp00015.PDF13 Dec 2018
Building plan approvalFile: Temp00016.PDF13 Dec 2018
Building Plan Approval (IOD)File: Temp00015.PDF13 Dec 2018
Building Plan Approval (IOD)File: Temp00016.PDF13 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate.pdf29 Nov 2018
Building plan approvalFile: MYSCAN_20181127_0002.PDF28 Nov 2018
Building plan approvalFile: MYSCAN_20181127_0003.PDF28 Nov 2018
Building plan approvalFile: MYSCAN_20181127_0004.PDF28 Nov 2018
Building plan approvalFile: MYSCAN_20181127_0005.PDF28 Nov 2018
Building plan approvalFile: MYSCAN_20181127_0006.PDF28 Nov 2018
Building plan approvalFile: MYSCAN_20181127_0007.PDF28 Nov 2018
Building plan approvalFile: MYSCAN_20181127_0008.PDF28 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20181127_0002.PDF28 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20181127_0003.PDF28 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20181127_0004.PDF28 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20181127_0005.PDF28 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20181127_0006.PDF28 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20181127_0007.PDF28 Nov 2018
Building Plan Approval (IOD)File: MYSCAN_20181127_0008.PDF28 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: avishkar scan.pdf28 Nov 2018
Building plan approvalFile: 1SYK SPARSH RERA AREA-WingA.pdf8 Jun 2018
Building plan approvalFile: 1SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building plan approvalFile: 2SYK SPARSH RERA AREA-WingA.pdf8 Jun 2018
Building plan approvalFile: 2SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building plan approvalFile: 3SYK SPARSH RERA AREA-WingA.pdf8 Jun 2018
Building plan approvalFile: 3SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building plan approvalFile: 4SYK SPARSH RERA AREA-WingA.pdf8 Jun 2018
Building plan approvalFile: 4SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building plan approvalFile: 5SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building plan approvalFile: 6SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building Plan Approval (IOD)File: 1SYK SPARSH RERA AREA-WingA.pdf8 Jun 2018
Building Plan Approval (IOD)File: 1SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building Plan Approval (IOD)File: 2SYK SPARSH RERA AREA-WingA.pdf8 Jun 2018
Building Plan Approval (IOD)File: 2SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building Plan Approval (IOD)File: 3SYK SPARSH RERA AREA-WingA.pdf8 Jun 2018
Building Plan Approval (IOD)File: 3SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building Plan Approval (IOD)File: 4SYK SPARSH RERA AREA-WingA.pdf8 Jun 2018
Building Plan Approval (IOD)File: 4SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018
Building Plan Approval (IOD)File: 5SYK SPARSH RERA AREA-WingB.pdf8 Jun 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SKYSPARSH REGENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmSKYSPARSH REGENCYCompleted 6Lapsed / revoked 9Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: SKYSPARSH DEVELOPERS

SKYSPARSH DEVELOPERS has 1 registration on MahaRERA, including SKYSPARSH REGENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SKYSPARSH REGENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SKYSPARSH REGENCY is delayed beyond 31 Jul 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SKYSPARSH REGENCY?

The registered promoter entity is SKYSPARSH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SKYSPARSH REGENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SKYSPARSH REGENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SKYSPARSH REGENCY?

The professionals named in the filing: Architect: RAVI GAWARE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKYSPARSH REGENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKYSPARSH REGENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKYSPARSH REGENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.