Home / Browse projects / Pune, Maharashtra / Skyi Star Town Phase II

Completed No litigation declared Residential / Group Housing project

Skyi Star Town Phase II

By Pate Life Melange Developers Pvt Ltd

RG-MH-26693 · RERA P52100014662 · Last updated on MahaRERA portal: 25 May 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2022Possession promisedregistration recorded completed
19 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

Skyi Star Town Phase II is a Residential / Group Housing project by Pate Life Melange Developers Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100014662 on 20 Dec 2017. The registration is recorded completed; possession was promised by 28 Aug 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSkyi Star Town Phase II
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Bhukum
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014662
  • ReraGenie IDRG-MH-26693

Builder

  • NamePate Life Melange Developers Pvt Ltd
  • Entity typeCompany
  • Managing DirectorAmit Anil Jagtap
  • Other registrations3 more →
  • Completed4 of 4

Key dates

this monthRegisteredDec 2017PromisedAug 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Dec 2017
  • Promised completion28 Aug 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 3NA150000
Building No 4NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building No 382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes98%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed384

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots384
Closed/Covered366
Open Space18
BuildingClosed/CoveredOpen SpaceTotal
Building No 31839192
Building No 41839192

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,751 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Dilip Ganpat MazireKothrudPune

Approvals and building plan

Permissible FSI21707.58
Proposed, not sanctioned18,061 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandarkar Road Pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEarthsong
EngineerDelcons Consultant India Pvt Ltd
PartnerRole in project
Pate Life Melange Developers Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012483Aug 2022 → Aug 2023

Reason as filed by the promoterThe Project “Skyi Star Town Phase II” is located outside from the City of Pune in the Village Bhukum, Taluka Mulshi, Dist Pune. The Village Bhukum falls under a substantial rainfall area. In the year 2021, we have experienced unprecedented rainfall leading to severe flood situation, which derailed construction activities almost for five months. After Covid situation there was shortage of quality & quantity of materials and labours as a only result only one wing i.e. 3 in the project got completed. However another wing of the project i.e. Wing No.4 is delayed. The Construction status of Wing 4

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000167453Skyi Pate Ventures Pvt LtdSikandar Kumar Sah17/08/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Apr 2023

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: PHASE-II.pdf25 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf10 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Disclosure.pdf10 Apr 2023
CERSAI detailsFile: RECONVENCE DEED-INDEX II-ADITYA BIRLA.pdf10 Apr 2023
Proforma of Agreement for saleFile: Agreement Draft.pdf10 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf10 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4-Bldg 3.pdf10 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4-Bldg 4.pdf10 Apr 2023
Other - TechnicalFile: Certificate of Incorporation after change of name.pdf10 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: STAR TOWN BLD NO-3_SOCIETY REGISTRATION CERTIFICATE.pdf20 Mar 2023
OtherFile: Form 4.pdf15 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SPVPL-PH-II FORM 5-Star Town Building-310322.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH PH II.pdf12 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG-PH-II-.pdf12 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: STAR TOWN CA-FORM 5-PH-2.pdf12 Nov 2022
Details of encumbrancesFile: Phase II.pdf13 Sep 2022
Proforma of Allotment letterFile: Agreement Draft.pdf12 Sep 2022
Details of encumbrancesFile: Morgage Deed-Index.pdf20 Aug 2022
Details of encumbrances concerned to LegalFile: LEGAL DECLARATION.pdf20 Aug 2022
Declaration about Commencement CertificateFile: CC DECLARATION.pdf20 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY-19-20.pdf20 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY-20-21.pdf20 Aug 2022
CERSAI detailsFile: FINANCE DECLARATION.pdf20 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FINANCE DECLARATION.pdf20 Aug 2022
Details of encumbrancesFile: STAR TOWN RECONVENCE DEED.pdf16 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ARCHITECT CERTIFICATE-10-12-2021.pdf16 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ARCHITECT CERTIFICATE-31-03-2020.pdf16 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGG CERTIFICATE-31-03-2020.pdf16 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGG CERTIFICATE-15-04-2021.pdf16 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGINEER CERTIFICATE-10-12-2021.pdf16 Aug 2022
Certificates of CA (Form 5)File: FORM 5-CA-31-03-20.pdf16 Aug 2022
Certificates of CA (Form 5)File: FORM 5-CA-31-03-21.pdf16 Aug 2022
Deviation Report with respect to Allotment letterFile: RERA-Allotment Letter Format.pdf16 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Agreement Draft.pdf16 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BLD NO-3.pdf25 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECH CERTIFICATE-3.pdf22 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 5-SPVLLP-PHASE II P52100002233_31-03-21.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 5-SPVPL-STAR TOWN PHASE II P52100014662_31-03-21.pdf31 Mar 2022
Layout approvalFile: Layout.pdf21 Jun 2021
Building plan approvalFile: Building 3 Floor Plan.pdf21 Jun 2021
Building plan approvalFile: Building 4 Floor Plan.pdf21 Jun 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf21 Jun 2021
Building Plan Approval (IOD)File: Building 3 Floor Plan.pdf21 Jun 2021
Building Plan Approval (IOD)File: Building 4 Floor Plan.pdf21 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT LETTER.PDF21 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: STAR TOWN PHASE II 2019.PDF2 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: STAR TOWN PHASE II 2020.PDF2 Feb 2021
Layout approvalFile: Layout.pdf25 Jul 2020
Copy of Layout Approval (in case of layout)File: Layout.pdf25 Jul 2020
Building plan approvalFile: 3-FLOOR PLAN.pdf15 May 2019
Building plan approvalFile: 3-FLOOR PLAN-1.pdf15 May 2019
Building plan approvalFile: 4-FLOOR PLAN.pdf15 May 2019
Building plan approvalFile: 4-FLOOR PLAN-1.pdf15 May 2019
Building Plan Approval (IOD)File: 3-FLOOR PLAN.pdf15 May 2019
Building Plan Approval (IOD)File: 3-FLOOR PLAN-1.pdf15 May 2019
Building Plan Approval (IOD)File: 4-FLOOR PLAN.pdf15 May 2019
Building Plan Approval (IOD)File: 4-FLOOR PLAN-1.pdf15 May 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT LETTER.pdf15 May 2019
Layout approvalFile: LAYOUT.pdf11 Oct 2018
Building plan approvalFile: BLDG_NO_3.pdf11 Oct 2018
Building plan approvalFile: BLDG_NO_3__8_FLOOR.pdf11 Oct 2018
Building plan approvalFile: BLDG_NO_4.pdf11 Oct 2018
Building plan approvalFile: BLDG_NO_4__8_FLOOR.pdf11 Oct 2018
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf11 Oct 2018
Building Plan Approval (IOD)File: BLDG_NO_3.pdf11 Oct 2018
Building Plan Approval (IOD)File: BLDG_NO_3__8_FLOOR.pdf11 Oct 2018
Building Plan Approval (IOD)File: BLDG_NO_4.pdf11 Oct 2018
Building Plan Approval (IOD)File: BLDG_NO_4__8_FLOOR.pdf11 Oct 2018
Certificates of CA (Form 5)File: Form 5 Skyi Star Town Phase 2.pdf30 Sep 2018
OtherFile: Real Estate Agents.pdf10 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: STAR_TOWN_COMMENCEMENT_LETTER.pdf8 Mar 2018
Building plan approvalFile: FLOOR PLAN 1-10.PDF2 Dec 2017
Building plan approvalFile: FLOOR PLAN 8TH.PDF2 Dec 2017
Layout approvalFile: LAYOUT.PDF2 Dec 2017
PAN CardFile: PAN PATE LIFE MELANGE DEVELOPERS PRIVATE LIMITED.pdf2 Dec 2017
Copy of the legal title reportFile: 21_BHUKUM_TITLE CERTIFICATE_09-08-2017.PDF2 Dec 2017
Details of encumbrancesFile: MORTGAGE DEED.pdf2 Dec 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.PDF2 Dec 2017
Building Plan Approval (IOD)File: FLOOR PLAN 1-10.PDF2 Dec 2017
Building Plan Approval (IOD)File: FLOOR PLAN 8TH.PDF2 Dec 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Skyi Star Town Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhukum13,700+ in Pune

2 kmSkyi Star Town Phase IICompleted 11Lapsed / revoked 5Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: Pate Life Melange Developers Pvt Ltd

Pate Life Melange Developers Pvt Ltd has 4 registrations on MahaRERA, including Skyi Star Town Phase I and Skyi Star Town Commercial. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Skyi Star Town Phase II is delayed beyond 28 Aug 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Skyi Star Town Phase II?

The registered promoter entity is Pate Life Melange Developers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Skyi Star Town Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Skyi Star Town Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Skyi Star Town Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Skyi Star Town Phase II?

The professionals named in the filing: Architect: Earthsong; Engineer: Delcons Consultant India Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Skyi Star Town Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skyi Star Town Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skyi Star Town Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.