Home / Browse projects / Pune, Maharashtra / Skyi Star City Phase VIII

Registered No litigation declared Residential / Group Housing project

Skyi Star City Phase VIII

By Skyi Property Ventures LLP

RG-MH-23382 · RERA P52100078694 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 25.00 crore secured on the land, in favour of Nido Home Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
20 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Skyi Star City Phase VIII is a Residential / Group Housing project by Skyi Property Ventures LLP in Pune, Maharashtra, registered with MahaRERA as P52100078694 on 7 Jan 2025. Possession is promised by 31 Dec 2028. 44 of the 64 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSkyi Star City Phase VIII
  • TypeResidential / Group Housing
  • Location
    • Kirkatwadi
    • Haveli
    • Pune
    • KIRKATWADI
    • Haveli
    • 411024
  • Pincode411024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078694
  • ReraGenie IDRG-MH-23382

Builder

  • NameSkyi Property Ventures LLP
  • Entity typePartnership
  • PartnerAmit Anil Jagtap
  • Other registrations5 more →

Key dates

this monthRegisteredJan 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jan 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Current status

69%44 of 64 units booked

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower - ENA8864064

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Tower - E: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes10%
Street LightingYes10%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered36
Open Space108

Land and ownership35

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area772 sq m
Land owned byThe promoter, with other names on the file
Named landowners35
Encumbrance on the landDeclared present
Charge in favour ofNido Home Finance Limited
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on21 Jul 2025
LandownerVillageDistrict
Antara Shekhar HagawaneBhugaonPune
Sangram Sachin HagawaneBhugaonPune
Shrawani Yuvraj HagawaneBhugaonPune
Shlok Umesh HagawaneBhugaonPune
Shreya Umesh HagawaneBhugaonPune
Sarthak Mangesh HagawaneBhugaonPune
Prathamesh Mangesh HagawaneBhugaonPune
Soham Ganesh HagawaneBhugaonPune
Pranav Ganesh HagawaneBhugaonPune
Sagunabai Baburao MurkuteBhugaonPune
Ashabai Shivaji DhawadeBhugaonPune
Nilima Santosh KamatheBhugaonPune
Poonam Shekhar HagawaneBhugaonPune
Shekhar Devidas HagawaneBhugaonPune
Shobha Devidas HagawaneBhugaonPune
Mayuri Dilip SalunkheBhugaonPune
Reshma Shekhar MateBhugaonPune
Komal Amit HagawaneBhugaonPune
Amit Balasaheb HagawaneBhugaonPune
Meena Balasaheb HagawaneBhugaonPune
Balasaheb Bhausaheb HagawaneBhugaonPune
Vaishali Sabhin UbheBhugaonPune
Manasi Sachin HagawaneBhugaonPune
Sachin Raosaheb HagawaneBhugaonPune
Sarika Yuvraj HagawaneBhugaonPune
Yuvraj Raosaheb HagawaneBhugaonPune
Raosaheb Bhausaheb HagawaneBhugaonPune
Rupali Umesh HagawaneBhugaonPune
Umesh Ramchandra HagawaneBhugaonPune
Dipali Mangesh HagawaneBhugaonPune
Mangesh Ramchandra HagawaneBhugaonPune
Shubhangi Ganesh HagawaneBhugaonPune
Ganesh Ramchandra HagawaneBhugaonPune
Shakuntala Ramchandra HagawaneBhugaonPune
Ramchandra alias Chandrakant Bhausaheb HagawaneBhugaonPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI6788.31
Proposed, not sanctioned5,288 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD. DAHANUKAR REGENCY, GROUND FLOOR, DAHANUKAR COLONY, KOTHRUD , PUNE MAHARASHTRA 411029

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHANANJAY S DESHMUKH
EngineerSANDIP RANGDAL
Chartered AccountantAnirudha Shashank Jinturkar
Chartered AccountantSPCM & ASSOCIATES Chartered Accountants
PartnerRole in project
Skyi Property Ventures LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 3.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1- Skyi Star City Phase VIII as on March 2026.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1- Skyi Star City Phase VIII as on March 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2-Engg Certifcate.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 - Skyi Star City Phase VIII as on March 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 - Skyi Star City Phase VIII as on March 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3 - Mar 2025.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3 - Skyi Star City Phase VIII as on March 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3 - Skyi Star City Phase VIII as on March 2026.pdf25 Jun 2026
Details of encumbrances concerned to FinanceFile: Phase VIII.pdf24 Apr 2025
Details of encumbrances concerned to LegalFile: Phase VIII.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Skyi Star City Phase VIII.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SPVLLP-PH VIII-Building E-Form-1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sky Star Phase VIII.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPVLLP-PH-VIII Building E-Form-2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 3.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Arch Certifcate.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engg Certifcate.pdf13 Mar 2025
Building plan approvalFile: 32-26-Bldg E-Section.pdf31 Dec 2024
Building plan approvalFile: 31-36-Bldg E-Elevation.pdf31 Dec 2024
Building plan approvalFile: 30-36-Bldg E-Floor Plan.pdf31 Dec 2024
Building plan approvalFile: 29-36-Bldg E-Floor Plan.pdf31 Dec 2024
Building plan approvalFile: 1-36-Layout-.pdf31 Dec 2024
Layout approvalFile: 1-36-Layout-.pdf31 Dec 2024
Copy of the legal title reportFile: Search and Title Report.pdf31 Dec 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter -Dues.pdf31 Dec 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter - Litigations.pdf31 Dec 2024
Copy of Layout Approval (in case of layout)File: 1-36-Layout-.pdf31 Dec 2024
Proforma of Allotment letterFile: Allotment Letter.pdf31 Dec 2024
Declaration in FORM BFile: Form B - Promoter.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SKYI.pdf31 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter-20-12-2024.pdf31 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Star City-CC Verification.pdf31 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 1-36-Layout-.pdf31 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 29-36-Bldg E-Floor Plan.pdf31 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 30-36-Bldg E-Floor Plan.pdf31 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 31-36-Bldg E-Elevation.pdf31 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 32-26-Bldg E-Section.pdf31 Dec 2024
Other - LegalFile: Fresh Cert of Incorporation on Change of Name.pdf31 Dec 2024
Other - LegalFile: LLP Agreement 1 to 100.pdf31 Dec 2024
Other - LegalFile: LLP Agreement 101 to 166.pdf31 Dec 2024
Declaration about Commencement CertificateFile: Format D - Declaration of Commencement Certificate.pdf31 Dec 2024
CERSAI detailsFile: Declaration of Cersai.pdf31 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Designated Bank Accounts (1).pdf31 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation-Allotment Letter.pdf31 Dec 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Letter -Dues.pdf31 Dec 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Letter - Litigations.pdf31 Dec 2024
Other - FinanceFile: Declaration-Land Owner Allotment.pdf31 Dec 2024
Other - FinanceFile: Declaration for Land Cost- Skyi Star City Phase VIII.pdf31 Dec 2024
Other - FinanceFile: Fresh Cert of Incorporation on Change of Name.pdf31 Dec 2024
Other - TechnicalFile: Annexure A - Order No 50.pdf31 Dec 2024
Other - TechnicalFile: Star City-CC Verification.pdf31 Dec 2024
Other - TechnicalFile: Fresh Cert of Incorporation on Change of Name.pdf31 Dec 2024
Other - TechnicalFile: Plot Area Declaration.pdf31 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation-AFS (1).pdf31 Dec 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf31 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf31 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Revised Format B - Declaration from the bank.pdf31 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured and Unsecured Loan.pdf31 Dec 2024
PAN CardFile: PAN_SPVLLP.pdf26 Dec 2024

How this compares with Pune

69%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Skyi Star City Phase VIII on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmSkyi Star City Phase VIICompleted 23Lapsed / revoked 26Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: Skyi Property Ventures LLP

Skyi Property Ventures LLP has 6 registrations on MahaRERA, including Skyi Star City Phase IV and Skyi Star City Phase V. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Skyi Star City Phase VIII is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Skyi Star City Phase VIII?

The registered promoter entity is Skyi Property Ventures LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Skyi Star City Phase VIII?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Skyi Star City Phase VIII?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Skyi Star City Phase VIII?

The professionals named in the filing: Architect: DHANANJAY S DESHMUKH; Engineer: SANDIP RANGDAL; Chartered Accountant: Anirudha Shashank Jinturkar; Chartered Accountant: SPCM & ASSOCIATES Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Skyi Star City Phase VIII?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skyi Star City Phase VIII. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skyi Star City Phase VIII to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.