Home / Browse projects / Pune, Maharashtra / Skyi City Centre

Registered Litigation declared Commercial project

Skyi City Centre

By Skyi Property Ventures LLP

RG-MH-75373 · RERA P52100053402 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Installation of Lifts, 94%
56 of 139Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

Skyi City Centre is a Commercial project by Skyi Property Ventures LLP in Pune, Maharashtra, registered with MahaRERA as P52100053402 on 31 Oct 2023. Possession is promised by 30 Jun 2027. 83 of the 139 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSkyi City Centre
  • TypeCommercial
  • Location
    • Nandoshi Road
    • Near DSK Vishwa
    • KIRKATWADI
    • Haveli
    • Pune
    • 411024
  • Pincode411024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053402
  • ReraGenie IDRG-MH-75373

Builder

  • NameSkyi Property Ventures LLP
  • Entity typePartnership
  • PartnerAmit Anil Jagtap
  • Other registrations5 more →

Key dates

this monthRegisteredOct 2023PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2023
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed106 files

Current status

60%83 of 139 units booked
59.5%Work done, per cost certificate

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Amenity Commercial BuildingNA330139139

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 94%.

Amenity Commercial Building: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes70%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership26

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,378 sq m
Land owned byThe promoter, with other names on the file
Named landowners26
LandownerVillageDistrict
Ramchandra alias Chandrakant Bhausaheb HagawaneKIRKATWADIPune
Shakuntala Ramchandra HagawaneKIRKATWADIPune
Ganesh Ramchandra HagawaneKIRKATWADIPune
Shubhangi Ganesh HagawaneKIRKATWADIPune
Mangesh Ramchandra HagawaneKIRKATWADIPune
Dipali Mangesh HagawaneKIRKATWADIPune
Umesh Ramchandra HagawaneKIRKATWADIPune
Rupali Umesh HagawaneKIRKATWADIPune
Raosaheb Bhausaheb HagawaneKIRKATWADIPune
Yuvraj Raosaheb HagawaneKIRKATWADIPune
Sarika Yuvraj HagawaneKIRKATWADIPune
Sachin Raosaheb HagawaneKIRKATWADIPune
Manasi Sachin HagawaneKIRKATWADIPune
Vaishali Sunil UbheKIRKATWADIPune
Balasaheb Bhausaheb bHagawaneKIRKATWADIPune
Meena Balasaheb HagawaneKIRKATWADIPune
Amit Balasaheb HagawaneKIRKATWADIPune
Komal Amit HagawaneKIRKATWADIPune
Reshma Shekhar MateKIRKATWADIPune
Mayuri Dipak SalunkheKIRKATWADIPune
Shobha Devidas HagawaneKIRKATWADIPune
Shekhar Devidas HagawaneKIRKATWADIPune
Poonam Shekhar HagawaneKIRKATWADIPune
Nilima Santosh KamatheKIRKATWADIPune
Ashabai Shivaji DhawadeKIRKATWADIPune
Sagunabai Baburao MurkuteKIRKATWADIPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI9589.9
Proposed, not sanctioned4,090 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhusari Colony Pune
Estimated costRs 14.02 cr
Cost incurredRs 8.34 cr
Work done59.47%
BuildingWingEstimatedIncurred
Amenity Commercial BuildingNARs 11.28 crRs 5.63 cr
-NARs 2.74 crRs 2.71 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK a Architecture
ArchitectDHANANJAY S DESHMUKH
EngineerSandeep Rangdal & Asso
EngineerSANDIP RANGDAL
Chartered AccountantR V Porwal & Associates
Chartered AccountantAnirudha Shashank Jinturkar
Chartered AccountantSPCM & ASSOCIATES Chartered Accountants
PartnerRole in project
Skyi Property Ventures LLP-

Litigation declared1

CaseCourtStatus
1752/2014/2014Pune Civil Judge Sr Div Courtframing of issues

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600188Ram GawaliSkyi Property Ventures LLP23/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Skyi City Center 2026.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1 Skyi City Center March 2026.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1 Skyi City Center March 2026.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1 Skyi City Center March 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 Skyi City Center.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 Skyi City Center March 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 Skyi City Center March 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: Form 2 Skyi City Center March 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3-Skyi City Centre.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3-Skyi City Centre March 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3-Skyi City Centre March 2026.pdf25 Jun 2026
Withdrawal Update Form 3File: Form 3-Skyi City Centre March 2026.pdf25 Jun 2026
Withdrawal Update Form 1File: Form 1 - Mar 2025.pdf21 Aug 2025
Withdrawal Update Form 2File: Form 2 - Mar 2025.pdf21 Aug 2025
Withdrawal Update Form 3File: Form 3 - March 2025.pdf21 Aug 2025
Form 1File: Form 1 Skyi City Center.pdf31 Jul 2025
Form 2File: Form 2-Skyi City Center.pdf31 Jul 2025
Form 3File: Form 3 Skyi City Centre.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Skyi City Centre.pdf31 Jul 2025
Details of encumbrances concerned to FinanceFile: Reconveyance.pdf24 Apr 2025
Details of encumbrances concerned to FinanceFile: Amenity Bldg.pdf24 Apr 2025
Details of encumbrances concerned to LegalFile: Reconveyance.pdf24 Apr 2025
Details of encumbrances concerned to LegalFile: Amenity Bldg.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Skyi City Center.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SPVLLP-Skyi City Center-Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sky City Centre.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SPVLLP-Skyi City Center-Form 2.pdf19 Apr 2025
Proforma of Agreement for saleFile: Agreement Draft-STAR CITY-COMM.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Sky City Center.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Skyi City Centre.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Skyi City Center.pdf6 Mar 2025
Declaration about Commencement CertificateFile: Stac City Commercial.pdf23 Jan 2025
Layout approvalFile: 1-36-Layout.pdf21 Jan 2025
Building plan approvalFile: 33-36-Amenity Bldg.pdf21 Jan 2025
Building plan approvalFile: 34-36-Amenuty Bldg.pdf21 Jan 2025
Building plan approvalFile: 35-36-Amenity Bldg.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: 1-36-Layout.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Skyi City Centre-Form1-Building Comm.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Skyi Star City Centre.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Skyi City Centre-Form 2-Building Comm.pdf21 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 33-36-Amenity Bldg.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 34-36-Amenuty Bldg.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 35-36-Amenity Bldg.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Star City Center.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Star City Comm.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg Commercial.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Skyi City Centre.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Skyi City Centre.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architects Certificate.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Skyi City Center.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Enginerrs Certificate.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5-_SPVLLP-Star City Centre.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: Star City-Comm.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Arch Certificate-Skyi Cety Centre.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engg Certiifcate-Skyi City Centre.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Skyi City Centre.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Comm.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Skyi City Centre Form 1 Arch Certiifcate.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Star City Skyi City Centre Form 2.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Skyi City Center.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Skyi City Centre.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: Star City-Commercial.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKYI CITY CENTRE FORM 1 Arch Certifcate 311223.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7_SPVLLP-SKYI CITY CENTRE FORM 2 Engg Certificate.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKYI CITY CENTRE-FORM 1 COMMERCIAL BUILDING.pdf11 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKYI CITY CENTRE-FORM 2 COMMERCIAL BUILDING.pdf11 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-Skyi City Centre.pdf11 Dec 2023
Proforma of Agreement for saleFile: Star City commercial.pdf8 Dec 2023
Building plan approvalFile: Declaration (3).pdf16 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Declaration (3).pdf16 Oct 2023
Other - FinanceFile: Supp Agreement-Master - Copy.pdf31 Aug 2023
Other - FinanceFile: Pages from Supp Agreement-Master - Copy.pdf31 Aug 2023
Other - FinanceFile: 1.pdf31 Aug 2023
Other - FinanceFile: 2.pdf31 Aug 2023
Other - FinanceFile: 3.pdf31 Aug 2023
Other - FinanceFile: Supp Agreement1-Master.pdf31 Aug 2023
Other - FinanceFile: Letter1.pdf10 Aug 2023
CERSAI detailsFile: CERSAI.pdf26 Jul 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Declaration.pdf7 Jul 2023

How this compares with Pune

60%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Skyi City Centre on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near DSK Vishwa13,700+ in Pune

2 kmSkyi City CentreCompleted 23Lapsed / revoked 26Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: Skyi Property Ventures LLP

Skyi Property Ventures LLP has 6 registrations on MahaRERA, including Skyi Star City Phase IV and Skyi Star City Phase V. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Skyi City Centre is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Skyi City Centre?

The registered promoter entity is Skyi Property Ventures LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Skyi City Centre?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Skyi City Centre?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Skyi City Centre?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Skyi City Centre?

The professionals named in the filing: Architect: VK a Architecture; Architect: DHANANJAY S DESHMUKH; Engineer: Sandeep Rangdal & Asso; Engineer: SANDIP RANGDAL; Chartered Accountant: R V Porwal & Associates; Chartered Accountant: Anirudha Shashank Jinturkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Skyi City Centre?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skyi City Centre. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skyi City Centre to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.