SHARADA MYRIA B AND C BUILDING
By SHARADA ERECTORS PRIVATE LIMITED
RG-MH-40837 · RERA P52100018973 · Last updated on MahaRERA portal: 24 Jul 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHARADA MYRIA B AND C BUILDING is a Others project by SHARADA ERECTORS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100018973 on 18 Dec 2018. The registration is recorded completed; possession was promised by 29 Jun 2025. The completion date has moved by 18 months from the original filing. 135 of the 174 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.
At a glance
Project
- NameSHARADA MYRIA B AND C BUILDING
- TypeOthers
- Location
- DSK VISHWA ROAD
- DHAYARI ( KIRKATWADI)
- KIRKATWADI
- Haveli
- Pune
- 411024
- Pincode411024
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100018973
- ReraGenie IDRG-MH-40837
Builder
- NameSHARADA ERECTORS PRIVATE LIMITED
- Entity typeCompany
- CINU45209PN1989PTC052171
- GSTIN27AACCS6028D1ZK
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- ChairpersonVISHWAS PURUSHOTTAM BODAS
- Managing DirectorRAJEEV PURUSHOTTAM BODAS
- Other registrations2 more →
- Completed2 of 3
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Dec 2018
- Promised completion29 Jun 2025
- Revised completionRevised to 29 Jun 2025 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed80 files
Current status
Figures as on 24 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B BUILDING | NA | 14 | 12 | 140 | 34 | 174 |
| C BUILDING | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 24 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.
B BUILDING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
C BUILDING1%
| Activity | Progress |
|---|---|
| Excavation | 10% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities17
As on 24 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 75% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 75% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| GYMNASIUM | Yes | 50% |
| CLUB HOUSE | Yes | 0% |
Parking filed140
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAJEEV PURUSHOTTAM BODAS | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR DILIP G KALE AND ASSOCIATES |
| Architect | Srujan Research and planning foundation |
| Engineer | JAYANT V INAMDAR STRUDCOM CONSULTANTS PVT LTD |
| Chartered Accountant | Shreerang Jogalekar |
| Partner | Role in project |
|---|---|
| SHARADA ERECTORS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Covid -19 Pandemic the work is not yet started, after completion of A wing the work of B & C wing will be started.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Jul 2025
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: organized (37).pdf | 24 Jul 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate (1).pdf | 17 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 25.pdf | 10 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Sharada Myria.pdf | 10 Jul 2025 |
| CERSAI detailsFile: CERSAI_Search_Report_200353377559_For_Debtor_Based_Search_09_05_2025_16_48_39_879.pdf | 12 May 2025 |
| Details of encumbrances concerned to FinanceFile: 5 1b details of encumbarences concerned to legal.pdf | 8 May 2025 |
| Details of encumbrances concerned to LegalFile: 5 1b details of encumbarences concerned to legal.pdf | 8 May 2025 |
| Proforma of Agreement for saleFile: 66 1 Proforma of agreement for sell.pdf | 8 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 52 Disclosure of interest in other real estate organisation.pdf | 8 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 40_Quanlity assurance certificate 2022-2023.pdf | 8 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 41_Quality assurance certificate 2023-2024.pdf | 8 May 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 45 1 Disclosure of secured unsecured finance availed for the project.pdf | 8 May 2025 |
| Building plan approvalFile: Sheet No1Oct16 2023.pdf | 27 Oct 2023 |
| Building plan approvalFile: Sheet No1Oct16 2023.pdf | 27 Oct 2023 |
| Building plan approvalFile: Sheet No1Oct16 2023.pdf | 27 Oct 2023 |
| Building plan approvalFile: Sheet No1Oct16 2023.pdf | 27 Oct 2023 |
| Building Plan Approval (IOD)File: Sheet No1Oct16 2023.pdf | 27 Oct 2023 |
| Building Plan Approval (IOD)File: Sheet No1Oct16 2023.pdf | 27 Oct 2023 |
| Building Plan Approval (IOD)File: Sheet No1Oct16 2023.pdf | 27 Oct 2023 |
| Building Plan Approval (IOD)File: Sheet No1Oct16 2023.pdf | 27 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2023-10-16_SMK_COMMENCEMENT CERTIFICATE.pdf | 27 Oct 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 14 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2019-2020.pdf | 14 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2020-2021.pdf | 14 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 01-04-2021 to 21-12-2021.pdf | 14 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 22-12-2021 to 31-03-2022.pdf | 14 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 01-04-2022 to 31-12-2022.pdf | 14 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Certificate of Engineers (Form 2) Mandatory for ongoing project for the year 2019-2020.p | 14 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Certificate of Engineers (Form 2) Mandatory for ongoing project for the year 2020-2021.p | 14 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Certificate of Engineers (Form 2) Mandatory for ongoing project for the year 01-04-2021 | 14 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Certificate of Engineers (Form 2) Mandatory for ongoing project for the year 22-12-2021 | 14 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Certificate of Engineers (Form 2) Mandatory for ongoing project for the year 01-04-2022 | 14 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: SEPL MYRIA INVENTORY UPTO 31-12-22.pdf | 14 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3 FY 19-20.pdf | 14 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3 FY 20-21.pdf | 14 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3 01-04-21 TO 21-12-21.pdf | 14 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3 22-12-21 TO 31-03-22.pdf | 14 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3 01-04-22 TO 31-12-22.pdf | 14 Feb 2023 |
| Certificates of CA (Form 5)File: FORM 5 FY 19-20.pdf | 14 Feb 2023 |
| Certificates of CA (Form 5)File: FORM 5 FY 20-21.pdf | 14 Feb 2023 |
| Certificates of CA (Form 5)File: FORM 5 01-04-21 TO 21-12-21.pdf | 14 Feb 2023 |
| Certificates of CA (Form 5)File: FORM 5 22-12-21 TO 31-03-22.pdf | 14 Feb 2023 |
| Certificates of CA (Form 5)File: FORM 5 01-04-22 TO 31-12-22.pdf | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 FY 19-20.pdf | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 FY 20-21.pdf | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 01-04-21 TO 21-12-21.pdf | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 22-12-21 TO 31-03-22.pdf | 14 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 1 ENgineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf | 13 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Engineers Certificate on Quanlity Assurance (Form 2A FY 2021-22).pdf | 13 Feb 2023 |
| Building plan approvalFile: Sheet 22072022.pdf | 25 Aug 2022 |
| Copy of the legal title reportFile: Search and Title Report28012022.pdf | 25 Aug 2022 |
| Building Plan Approval (IOD)File: Sheet 22072022.pdf | 25 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 30 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2022-01-05_Revised Commencement Certificate_Sharada Myria_Kirkatwadi.pdf | 28 Feb 2022 |
| Layout approvalFile: Revised Layout.pdf | 25 Feb 2022 |
| Building plan approvalFile: Revised Layout.pdf | 25 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Revised Layout.pdf | 25 Feb 2022 |
| Building Plan Approval (IOD)File: Revised Layout.pdf | 25 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B_ Building Architect certificate.pdf | 28 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C_ Building Architect certificate.pdf | 28 Feb 2020 |
| Form 2AFile: Quality Assuarance Certificate Form 2A for B and C Building.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate for B and C Building as on 30062019.pdf | 30 Jul 2019 |
| Certificates of CA (Form 5)File: Building B and C Form 5 sign and stamp.pdf | 13 Apr 2019 |
| Certificates of CA (Form 5)File: Form 5 B and C Building SIgned by CA as on 31032019.pdf | 10 Apr 2019 |
| Form 2AFile: Form 2A Quality Assuarance Certificate for Building B and C.pdf | 13 Mar 2019 |
| Proforma of Allotment letterFile: Draft Agreement for B and C building.pdf | 13 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No 2 Strudcom Engineer's Certificate For Builidng B And C.pdf | 4 Dec 2018 |
| Certificates of CA (Form 3)File: Certificate Form 3 as On 30 Sep B C.pdf | 4 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate for Building B AND C.pdf | 29 Nov 2018 |
| Declaration in FORM BFile: Sharada Myria_Affidavit cum Declaration_SEPL_2018.pdf | 28 Nov 2018 |
| Proforma of Allotment letterFile: Sharada Myria_Agreement to Sell_Draft_Building B-C_2018.pdf | 28 Nov 2018 |
| PAN CardFile: SEPL_PAN.pdf | 27 Nov 2018 |
| Copy of the legal title reportFile: Tittle Search_Sharada Myria .pdf | 27 Nov 2018 |
| Details of encumbrancesFile: Self Declaration Regarding Encumbrances For Building B and C.pdf | 27 Nov 2018 |
| Layout approvalFile: Sheet 1of11_Layout compressed.pdf | 21 Nov 2018 |
| Building plan approvalFile: Sheet 1of11_Layout compressed.pdf | 21 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: Sheet 1of11_Layout compressed.pdf | 21 Nov 2018 |
| Building Plan Approval (IOD)File: Sheet 1of11_Layout compressed.pdf | 21 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commwncement certificate.pdf | 21 Nov 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHARADA CHAMBERS | SANKARSHET ROAD GULTEKDI HAVELI PUNE | 15 | Completed | May 2016 | May 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
Keep SHARADA MYRIA B AND C BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHAYARI ( KIRKATWADI)13,700+ in Pune
Filed coordinates, straight-line distance. 132 registered projects within 2 km.
Skyi City Centre
Skyi Property Ventures LLP
CHAITRANGAN PHASE II
DEDGE HOUSING DEVELOPMENT LLP
Mauli Park
MAITRI BUILDCON
Skyi Star City Phase VII
Skyi Property Ventures LLP
Skyi Star City Phase V
Skyi Property Ventures LLP
Skyi Star City Phase VI
Skyi Property Ventures LLP
Builder: SHARADA ERECTORS PRIVATE LIMITED
SHARADA ERECTORS PRIVATE LIMITED has 3 registrations on MahaRERA, including SHARADA MYRIA and SHARADA MYRIA B AND C BUILDING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHARADA MYRIA B AND C BUILDING is delayed beyond 29 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHARADA MYRIA B AND C BUILDING?
The registered promoter entity is SHARADA ERECTORS PRIVATE LIMITED, a company as per the filing. Its CIN U45209PN1989PTC052171 and GSTIN 27AACCS6028D1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHARADA MYRIA B AND C BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHARADA MYRIA B AND C BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHARADA MYRIA B AND C BUILDING?
The professionals named in the filing: Architect: AR DILIP G KALE AND ASSOCIATES; Architect: Srujan Research and planning foundation; Engineer: JAYANT V INAMDAR STRUDCOM CONSULTANTS PVT LTD; Chartered Accountant: Shreerang Jogalekar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHARADA MYRIA B AND C BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback