Home / Browse projects / Pune, Maharashtra / Skyi Songbirds Phase D

Completed No litigation declared Residential / Group Housing project

Skyi Songbirds Phase D

By Enerrgia Skyi Developers

RG-MH-09295 · RERA P52100000764 · Last updated on MahaRERA portal: 11 Apr 2023

Source: official MahaRERA filing

Red flags

  • 7 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2022Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 0%
7Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Skyi Songbirds Phase D is a Residential / Group Housing project by Enerrgia Skyi Developers in Pune, Maharashtra, registered with MahaRERA as P52100000764 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 May 2022. The completion date has moved by 18 months from the original filing. 7 complaints are on record with the regulator.

At a glance

Project

  • NameSkyi Songbirds Phase D
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000764
  • ReraGenie IDRG-MH-09295

Builder

  • NameEnerrgia Skyi Developers
  • Entity typePartnership
  • PartnerSushant Mohan Jadhav
  • Other registrations11 more →
  • Completed5 of 12
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredJul 2017First promiseNov 2020Revised toMay 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jul 2017
  • Promised completion30 May 2022
  • Revised completionRevised to 30 May 2022 (originally 30 Nov 2020)
  • Buildings3 building records
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 3NA140000
Building No 4NA140000
Building No 4ANA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 11 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.

Building No 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 4A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 11 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes97%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Raw Water Supply SchemeYes100%

Parking filed202

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots202
Closed/Covered138
Open Space64
BuildingClosed/CoveredOpen SpaceTotal
Building No 3502373
Building No 4452166
Building No 4A432063

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,928 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
Laxman Sopan PolBhugaonPune
Santosh Nivrutti PolBhugaonPune
Balkrushna Vasant SurveBhugaonPune
Nrayan Maruti FalakeBhugaonPune
Bapu Narayan FalakeBhugaonPune
Balasaheb Narayan FalakeBhugaonPune
Samruddha PropertiesPashanPune
Shrikant Shravan MahalePune (M Corp.)Pune
Kamalabai Venkatnarsaiyya GannuWakadPune

Approvals and building plan

Permissible FSI17902.16
Proposed, not sanctioned17,444 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandarkar Road

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSalil Ranadive Architects
EngineerDelcons Consultant India Pvt Ltd
PartnerRole in project
Enerrgia Skyi Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100008534Nov 2020 → Nov 2021

Reason as filed by the promoterThe Project “Skyi Songbirds Phase D” is located outside from the City of Pune in the Village Bhugaon, Taluka Mulshi, Dist Pune. The Village Bhugaon falls under a substantial rainfall area. In the year 2019 & 2020, we have experienced unprecedented rainfall leading to severe flood situation, which derailed construction activities almost for five months. Due to heavy rainfall and flooding in Village Bhugaon, the project execution is delayed for the reasons beyond our control. Also, nationwide lockdown in India due to COVID-19 Pandemic situation in the month of March, April, May, June, July & Aug

Litigation declared3

CaseCourtStatus
312/2017Civil Judge Junior DivisionThe case is disposed off as settled
1208/2016Civil Judge Senior Divisionframing of issues
852/2015Civil Judge Junior Divisionsteps

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC005000000023269SHRUTI ABHIJIT BHAVSAR AND ABHIJIT MUKESH BHAVSARM/S. ENERRGIA SKYi DEVELOPERS01/08/2019
CC005000000085280Sachin Ramdas ThoratM/s Enerrgia Skyi Developers27/02/2021
CC005000000085319Ganesh Jagannath KaleEnerrgia Skyi Developers17/03/2021
CC005000000085407Mr Raju GawareEnerrgia Skyi Developers05/04/2021
CC12502289Enerrgia Skyi DevelopersANKIT VIJAY KANCHAL07/07/2025
CC12502290Enerrgia Skyi DevelopersVijay Narian Kanchhal HUF through its Karta Ankit Vijay Kanchhal07/07/2025
CC12504429Enerrgia Skyi DevelopersTejendra Tripathi12/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 May 2022

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: LAYOUT.pdf11 Apr 2023
Building plan approvalFile: BLDG 3 4 4A (2).pdf11 Apr 2023
Building plan approvalFile: BLDG 3 4 4A (3).pdf11 Apr 2023
Building plan approvalFile: BLDG 3 4 4A (4).pdf11 Apr 2023
Building plan approvalFile: BLDG 3 4 4A (5).pdf11 Apr 2023
Building plan approvalFile: BLDG 3 4 4A (6).pdf11 Apr 2023
Building plan approvalFile: BLDG 3 4 4A (7).pdf11 Apr 2023
Details of encumbrancesFile: RECONVENCE DEED.pdf11 Apr 2023
Details of encumbrances concerned to FinanceFile: Mortgage deed.pdf11 Apr 2023
Details of encumbrances concerned to LegalFile: Mortgage deed.pdf11 Apr 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf11 Apr 2023
Building Plan Approval (IOD)File: BLDG 3 4 4A (2).pdf11 Apr 2023
Building Plan Approval (IOD)File: BLDG 3 4 4A (3).pdf11 Apr 2023
Building Plan Approval (IOD)File: BLDG 3 4 4A (4).pdf11 Apr 2023
Building Plan Approval (IOD)File: BLDG 3 4 4A (5).pdf11 Apr 2023
Building Plan Approval (IOD)File: BLDG 3 4 4A (6).pdf11 Apr 2023
Building Plan Approval (IOD)File: BLDG 3 4 4A (7).pdf11 Apr 2023
Declaration about Commencement CertificateFile: SONGBIRDS COMMENCEMENT LETTER.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf11 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Disclosure.pdf11 Apr 2023
CERSAI detailsFile: Mortgage deed.pdf11 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Certificates of CA (Form 5).pdf11 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 3 Certificates of CA (Form 5).pdf11 Apr 2023
Proforma of Agreement for saleFile: Agreement Draft.pdf11 Apr 2023
Deviation Report with respect to Allotment letterFile: Allotment Letter.pdf11 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Agreement Draft.pdf11 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: BLD NO-4A SOCIETY REGISTRATION CERTIFICATE.pdf16 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4-3 4 4A.pdf2 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf31 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 5-ESD SONGBIRD PHASE D P52100000764_31-03-21.pdf31 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4-SONGBIRDS BLDG NO-18A.pdf5 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC-18A.pdf5 Feb 2022
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4-SONGBIRDS BLDG NO-18A.pdf5 Feb 2022
Details of encumbrancesFile: ENCUMBRANCE DECLERATION- PHASE D.pdf16 Aug 2021
Declaration about Commencement CertificateFile: DECLERATION ABOUT CC-PHASE D.pdf16 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE CERTIFICATE PHASE D.pdf16 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE CERTIFICATE PHASE D.pdf16 Aug 2021
Certificates of CA (Form 5)File: SONGBIRDS PHASE D 2019.PDF2 Feb 2021
Certificates of CA (Form 5)File: SONGBIRDS PHASE D 2020.PDF2 Feb 2021
Certificates of CA (Form 5)File: Form 5 Skyi Songbirds Phase D.pdf30 Sep 2018
OtherFile: Real Estate Agents.pdf10 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: SONGBIRDS_COMMENCEMET_LETTER.pdf8 Mar 2018
Building plan approvalFile: 3 4 4A_FLOOR PLAN 1 2 3 4 5 7 8.pdf19 Jul 2017
Building plan approvalFile: 3 4 4A_FLOOR PLAN 6.pdf19 Jul 2017
Building plan approvalFile: 3 4 4A_FLOOR PLAN 9.pdf19 Jul 2017
Building plan approvalFile: 3 4 4A_FLOOR PLAN 10.pdf19 Jul 2017
Layout approvalFile: LAYOUT.pdf19 Jul 2017
PAN CardFile: ESD_PAN.pdf19 Jul 2017
Copy of the legal title reportFile: Title Certificate_10-02-2014_ARK low version.pdf19 Jul 2017
Details of encumbrancesFile: SONGBIRD MORTGAGE INDEXII.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf19 Jul 2017
Building Plan Approval (IOD)File: 3 4 4A_FLOOR PLAN 1 2 3 4 5 7 8.pdf19 Jul 2017
Building Plan Approval (IOD)File: 3 4 4A_FLOOR PLAN 6.pdf19 Jul 2017
Building Plan Approval (IOD)File: 3 4 4A_FLOOR PLAN 9.pdf19 Jul 2017
Building Plan Approval (IOD)File: 3 4 4A_FLOOR PLAN 10.pdf19 Jul 2017
Declaration in FORM BFile: PROMOTER PHASE D.PDF19 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE PHASE D.PDF19 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ESD_ENEGINEER CERTIFICATE PHASE D.PDF19 Jul 2017
Certificates of CA (Form 3)File: Rera Certificate Phace D.pdf19 Jul 2017
Proforma of Allotment letterFile: Agreement for Sale.pdf19 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Skyi Songbirds Phase IISr No 274 and others Village Bhugaon Tal Mulshi Dist Pune357CompletedOct 2016Late, Mar 2017
Skyi Songbirds Phase ISr No 274 and others Village Bhugaon Tal Mulshi Dist Pune388CompletedSep 2015Late, Jan 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Skyi Songbirds Phase D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

Builder: Enerrgia Skyi Developers

Enerrgia Skyi Developers has 12 registrations on MahaRERA, including Skyi Songbirds Phase A and Skyi Songbirds Phase B. Its filings disclose 7 earlier MahaRERA projects: declares 5 of 7 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Skyi Songbirds Phase D is delayed beyond 30 May 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Skyi Songbirds Phase D?

The registered promoter entity is Enerrgia Skyi Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Skyi Songbirds Phase D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Skyi Songbirds Phase D?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Skyi Songbirds Phase D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Skyi Songbirds Phase D?

The professionals named in the filing: Architect: Salil Ranadive Architects; Engineer: Delcons Consultant India Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Skyi Songbirds Phase D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skyi Songbirds Phase D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skyi Songbirds Phase D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.