Home / Browse projects / Pune, Maharashtra / Skyi Manas Lake Phase VII

Registration lapsed No litigation declared Residential / Group Housing project

Skyi Manas Lake Phase VII

By Enerrgia Skyi Ventures LLP

RG-MH-22149 · RERA P52100030584 · Last updated on MahaRERA portal: 6 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
0 of 166Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Skyi Manas Lake Phase VII is a Residential / Group Housing project by Enerrgia Skyi Ventures LLP in Pune, Maharashtra, registered with MahaRERA as P52100030584 on 1 Sep 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 166 of the 166 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSkyi Manas Lake Phase VII
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Near Manas Lake
    • Bhukum
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030584
  • ReraGenie IDRG-MH-22149

Builder

  • NameEnerrgia Skyi Ventures LLP
  • Entity typePartnership
  • PartnersSushant Mohan Jadhav, Amit Anil Jagtap
  • Other registrations8 more →
  • Completed5 of 9
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

10 months past promisethis monthRegisteredSep 2021PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Current status

100%166 of 166 units booked
100.0%Work done, per cost certificate

Figures as on 6 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 9NA15141660166

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Building No 9: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered166

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,082 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jul 2025
LandownerVillageDistrict
Milind Laxman KulkarniPune (M Corp.)Pune
Sandeep Shridhar WalimbePune (M Corp.)Pune
Enerrgia Skyi VenturesPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI10821.33
Proposed, not sanctioned8,821 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPaud Road Pune
Estimated costRs 40.94 cr
Cost incurredRs 40.94 cr
Work done100.0%
BuildingWingEstimatedIncurred
Building No 9NARs 32.08 crRs 32.08 cr
-NARs 8.86 crRs 8.86 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDhananjay Deshmukh
EngineerSandip Rangdal & Asso. Structural Consultant
Chartered AccountantSPCM & Associates
Chartered AccountantA S Jinturkar & Co.
PartnerRole in project
Enerrgia Skyi Ventures LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000259257Enerrgia Skyi Ventures LLPMandar Satish Pathak07/08/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1-Manas Lake Phase VII-Bldg 9.pdf6 Dec 2025
Withdrawal Update Form 2File: Form 2-Manas Lake Phase VII-Bldg 9.pdf6 Dec 2025
Withdrawal Update Form 3File: Form 3-Manas Lake Phase VII-Bldg 9.pdf6 Dec 2025
Disclosure of sold/ booked inventoryFile: Skyi Manas Lake Phase VII.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1-Manas Lake Phase VII-Bldg 9.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Manas Lake Phase VII-Bldg 9.pdf21 Apr 2025
Proforma of Agreement for saleFile: Agreement Draft-ML-9.pdf22 Mar 2025
Layout approvalFile: 1-17-Layout-compressed.pdf18 Jan 2025
Building plan approvalFile: 5-17-Bldg 9-Elevation.pdf18 Jan 2025
Building plan approvalFile: 4-17-Bldg 9-Floor Plan.pdf18 Jan 2025
Building plan approvalFile: 3-17-Bldg No 9-Floor Plan.pdf18 Jan 2025
Building plan approvalFile: 2-17-Bldg 9-Floor Plan.pdf18 Jan 2025
Copy of Layout Approval (in case of layout)File: 1-17-Layout-compressed.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Manas Lake Phase VII-Bldg 9.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Manas Lake Phase VII-Bldg 9.pdf18 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Manas Lake-Commencement Letter.pdf18 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Manas Lake-Commencement Letter.pdf18 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 5-17-Bldg 9-Elevation.pdf18 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-17-Bldg 9-Floor Plan.pdf18 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-17-Bldg No 9-Floor Plan.pdf18 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-17-Bldg 9-Floor Plan.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Details-Skyi Manas Lake Phase VII.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9-30-09-24_11zon.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Sold Inventory-Phase VII.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Certificate-Phase VII.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Manas Lake Phase VII-Bldg 9.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Manas Lake Phase VII-Bldg 9.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5-ESVLLP-Manas Lake Phase VII.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: ML-PHASE VII.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Manas Lake Phase VII-Bldg 9.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Manas Lake Phase VII-Bldg 9.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD DETAILS-9.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Manas Lake Phase VII-Bldg 9.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Manas Lake Phase VII-Bldg 9.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Manas Lake Phase VII-Bldg 9.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Manas Lake Phase VII-Bldg 9.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Manas Lake Phase VII-Bldg 9.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Manas Lake Phase VII-Bldg 9.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Manas Lake Phase VII-Bldg 9.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Manas Lake Phase VII-Bldg 9.pdf9 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9.pdf9 Feb 2024
Layout approvalFile: 1-7-Layout.pdf7 Feb 2024
Building plan approvalFile: 2-7-Floor Plan.pdf7 Feb 2024
Building plan approvalFile: 3-7-Floor Plan.pdf7 Feb 2024
Building plan approvalFile: 4-7-Floor Plan.pdf7 Feb 2024
Building plan approvalFile: 5-7-Floor Plan.pdf7 Feb 2024
Copy of Layout Approval (in case of layout)File: 1-7-Layout.pdf7 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-7-Floor Plan.pdf7 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-7-Floor Plan.pdf7 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-7-Floor Plan.pdf7 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-7-Floor Plan.pdf7 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Manas Lake Commencement Letter VI-11-04-2023.pdf7 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Manas Lake Commencement Letter VII.pdf7 Feb 2024
Declaration about Commencement CertificateFile: ML-PHASE VII-CC DECLARATION.pdf7 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ML-PHASE VII-Quality-21-22.pdf23 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ML-PHASE VII-Quality-22-23.pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ML-PHASE VII-Seprate bank.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: Manas Lake-VII-9.pdf19 Jan 2024
Deviation Report with respect to Allotment letterFile: Allotment Letter.pdf19 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Manas-ATS Draft.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Manas Lake Phase VII-Bldg 9.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ML-Form 1-Manas Lake Phase VII-Bldg 9-31-12-23.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Manas Lake Phase VII-Bldg 9.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ML-Form 2-Manas Lake Phase VII-Bldg 9-31-12-23.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Manas Lake Phase VII-Bldg 9.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ML-Form 3-Manas Lake Phase VII-Bldg 9-31-12-23.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ESVLLP-Form 1-Bldg 9.pdf11 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ESVLLP-Form 2-Bldg 9.pdf11 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ESVLLP-Form 3-Bldg 9.pdf11 Dec 2023
Proforma of Agreement for saleFile: ATS DRAFT.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ESVLLP_ML_Form 1_Manas Lake Phase VII-Bldg 9_15-09-23.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ESVLLP_ML_Form 1_Manas Lake Phase VII-Bldg 9_30-09-23.pdf18 Oct 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Skyi Manas Lake Phase IIIGat No 215 P and others Village Bhukum Mulshi Pune119CompletedFeb 2021Oct 2020
Skyi Manas Lake Phase IIGat No 215 P and others Village Bhukum Mulshi Pune220CompletedFeb 2021Oct 2020
Skyi Manas Lake Phase IGat No 215 and others Bhukum Mulshi Pune249CompletedJun 2017Late, Mar 2018

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Skyi Manas Lake Phase VII on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Manas Lake13,700+ in Pune

2 kmSkyi Manas Lake Phase VICompleted 6Lapsed / revoked 4Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: Enerrgia Skyi Ventures LLP

Enerrgia Skyi Ventures LLP has 9 registrations on MahaRERA, including Skyi Manas Lake Phase I and Skyi Manas Lake Phase II. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Skyi Manas Lake Phase VII shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Skyi Manas Lake Phase VII is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Skyi Manas Lake Phase VII?

The registered promoter entity is Enerrgia Skyi Ventures LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Skyi Manas Lake Phase VII?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Skyi Manas Lake Phase VII?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Skyi Manas Lake Phase VII?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Skyi Manas Lake Phase VII?

The professionals named in the filing: Architect: Dhananjay Deshmukh; Engineer: Sandip Rangdal & Asso. Structural Consultant; Chartered Accountant: SPCM & Associates; Chartered Accountant: A S Jinturkar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Skyi Manas Lake Phase VII?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skyi Manas Lake Phase VII. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skyi Manas Lake Phase VII to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.