Red flags
- 5 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Skyi Manas Lake Phase II is a Residential / Group Housing project by Enerrgia Skyi Ventures LLP in Pune, Maharashtra, registered with MahaRERA as P52100000513 on 18 Jul 2017. The registration is recorded completed; possession was promised by 28 Feb 2021. 5 complaints are on record with the regulator.
At a glance
Project
- NameSkyi Manas Lake Phase II
- TypeResidential / Group Housing
- Location
- Paud Road
- Bhukum
- Mulshi
- Pune
- 412115
- Pincode412115
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100000513
- ReraGenie IDRG-MH-08818
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Jul 2017
- Promised completion28 Feb 2021
- Revised completionNone
- Buildings2 building records
- Documents filed40 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 4 | NA | 17 | 0 | 0 | 0 | 0 |
| Building No 5 | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
Building No 4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 5100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 20 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 65% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 70% |
| Community Buildings | Yes | 5% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 70% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Raw Water Supply Scheme | Yes | 100% |
Parking filed346
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Building No 4 | 124 | 50 | 174 |
| Building No 5 | 123 | 49 | 172 |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sandeep Shridhar Walimbe | Karve Nagar | Pune |
| Milind Laxman Kulkarni | Karve Nagar | Pune |
| Enerrgia Skyi Ventures | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Salil Ranadive Architects |
| Engineer | Delcon Consultant India Pvt Ltd |
| Partner | Role in project |
|---|---|
| Enerrgia Skyi Ventures LLP | - |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022815 | Vivek Mhaske | M/s Enerrgia Skyi Ventures LLP | 21/03/2019 |
| CC005000000023220 | Mr. Sushil Vishnu More | M/s. Enerrgia Skyi Ventures LLP | 08/07/2019 |
| CC005000000085628 | Shweta Dhoke | M/s. Enerrgia Skyi Ventures LLP | 03/06/2021 |
| CC005000000177906 | Sumedh Dhoke | M/s. Enerrgia Skyi Ventures LLP | 12/12/2022 |
| CC005000000208232 | Jitendra Purushottam Patil | M/s Enerrgia Skyi Ventures LLP | 05/03/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Feb 2023
Documents filed40
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: encumbrances.pdf | 20 Feb 2025 |
| Details of encumbrances concerned to LegalFile: encumbrances.pdf | 20 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate-Phase 2-3.pdf | 16 Feb 2023 |
| Details of encumbrancesFile: ML INDEX II.pdf | 13 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 5-ESVLLP-PHASE II P52100000513_31-03-21.pdf | 31 Mar 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCEITY REGISTRATION CERTIFICATE.PDF | 24 Jun 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: ML PHASE II FORM 4.pdf | 28 May 2021 |
| Certificates of CA (Form 5)File: MANAS LAKE PHASE II 2019.PDF | 2 Feb 2021 |
| Certificates of CA (Form 5)File: MANASLAKE PHASE II 2020.PDF | 2 Feb 2021 |
| OtherFile: MANAS LAKE LETTER.PDF | 23 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Lettere.PDF | 22 Nov 2018 |
| Certificates of CA (Form 5)File: Form 5 Manas Lake Phase 2.pdf | 22 Nov 2018 |
| Details of encumbrancesFile: MORTGAGE 1.pdf | 16 Jul 2017 |
| Declaration in FORM BFile: PROMOTER DECELERATION ESVLLP 2.PDF | 16 Jul 2017 |
| Certificates of CA (Form 3)File: CA_MANAS PHASE II.PDF | 16 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE PHASE 2.PDF | 15 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MANAS LAKE ENGINEERS CERTIFICETE PHASE 2.PDF | 14 Jul 2017 |
| Copy of the legal title reportFile: TITLE CERTIFICATE ESVLLP.PDF | 10 Jul 2017 |
| Layout approvalFile: LAYOUT.PDF | 9 Jul 2017 |
| Building plan approvalFile: 4_FLOOR PLAN 1 3 5 9 11 13.PDF | 9 Jul 2017 |
| Building plan approvalFile: 4_FLOOR PLAN 2 4 6 8 10.PDF | 9 Jul 2017 |
| Building plan approvalFile: 4_FLOOR PLAN 7.PDF | 9 Jul 2017 |
| Building plan approvalFile: 4_FLOOR PLAN 12.PDF | 9 Jul 2017 |
| Building plan approvalFile: 4_FLOOR PLAN_SHOP.PDF | 9 Jul 2017 |
| Building plan approvalFile: 5_FLOOR PLAN 1 3 5 9 11 13.PDF | 9 Jul 2017 |
| Building plan approvalFile: 5_FLOOR PLAN 2 4 6 8 10 14.PDF | 9 Jul 2017 |
| Building plan approvalFile: 5_FLOOR PLAN 7.PDF | 9 Jul 2017 |
| Building plan approvalFile: 5_FLOOR PLAN 12.PDF | 9 Jul 2017 |
| PAN CardFile: PAN ESV LLP.pdf | 9 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.PDF | 9 Jul 2017 |
| Building Plan Approval (IOD)File: 4_FLOOR PLAN 1 3 5 9 11 13.PDF | 9 Jul 2017 |
| Building Plan Approval (IOD)File: 4_FLOOR PLAN 2 4 6 8 10.PDF | 9 Jul 2017 |
| Building Plan Approval (IOD)File: 4_FLOOR PLAN 7.PDF | 9 Jul 2017 |
| Building Plan Approval (IOD)File: 4_FLOOR PLAN 12.PDF | 9 Jul 2017 |
| Building Plan Approval (IOD)File: 4_FLOOR PLAN_SHOP.PDF | 9 Jul 2017 |
| Building Plan Approval (IOD)File: 5_FLOOR PLAN 1 3 5 9 11 13.PDF | 9 Jul 2017 |
| Building Plan Approval (IOD)File: 5_FLOOR PLAN 2 4 6 8 10 14.PDF | 9 Jul 2017 |
| Building Plan Approval (IOD)File: 5_FLOOR PLAN 7.PDF | 9 Jul 2017 |
| Building Plan Approval (IOD)File: 5_FLOOR PLAN 12.PDF | 9 Jul 2017 |
| Proforma of Allotment letterFile: Manas Lake_Agreement for Sale.pdf | 9 Jul 2017 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Skyi Manas Lake Phase III | Gat No 215 P and others Village Bhukum Mulshi Pune | 119 | Completed | Feb 2021 | Oct 2020 |
| Skyi Manas Lake Phase II | Gat No 215 P and others Village Bhukum Mulshi Pune | 220 | Completed | Feb 2021 | Oct 2020 |
| Skyi Manas Lake Phase I | Gat No 215 and others Bhukum Mulshi Pune | 249 | Completed | Jun 2017 | Late, Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 40 filed documents as one ZIP, foldered, with a manifest
Keep Skyi Manas Lake Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhukum13,700+ in Pune
Filed coordinates, straight-line distance. 13 registered projects within 2 km.
Avian Valley - Solaire
KAKADE ESTATE DEVELOPERS PVT. LTD.
Park Pebbles Phase I
M/s Rainbow Purple Construction LLP
Mahindra Rivenza Phase 2
Mahindra Lifespace Developers limited
Mahindra Rivenza Phase 1
Mahindra Lifespace Developers limited
FOREST TRAILS ATHASHRI B3
LAVIM DEVELOPERS PVT LTD
KOHINOOR WOODSHIRE
INTOFINITY PROMOTERS PRIVATE LIMITED
Builder: Enerrgia Skyi Ventures LLP
Enerrgia Skyi Ventures LLP has 9 registrations on MahaRERA, including Skyi Manas Lake Phase I and Skyi Manas Lake Phase II. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Skyi Manas Lake Phase II is delayed beyond 28 Feb 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Skyi Manas Lake Phase II?
The registered promoter entity is Enerrgia Skyi Ventures LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Skyi Manas Lake Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Skyi Manas Lake Phase II?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Skyi Manas Lake Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Skyi Manas Lake Phase II?
The professionals named in the filing: Architect: Salil Ranadive Architects; Engineer: Delcon Consultant India Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Skyi Manas Lake Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback