Home / Browse projects / Pune, Maharashtra / Skyi Aria Heights Phase I

Registration lapsed No litigation declared Residential / Group Housing project

Skyi Aria Heights Phase I

By Enerrgia Skyi Developers

RG-MH-17207 · RERA P52100028121 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
2 of 110Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 145 documents Report an error

Skyi Aria Heights Phase I is a Residential / Group Housing project by Enerrgia Skyi Developers in Pune, Maharashtra, registered with MahaRERA as P52100028121 on 4 Feb 2021. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 108 of the 110 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameSkyi Aria Heights Phase I
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Bhugaon
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100028121
  • ReraGenie IDRG-MH-17207

Builder

  • NameEnerrgia Skyi Developers
  • Entity typePartnership
  • PartnerSushant Mohan Jadhav
  • Other registrations11 more →
  • Completed5 of 12
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

16 months past promisethis monthRegisteredFeb 2021PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Feb 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed145 files

Current status

98%108 of 110 units booked

Figures as on 23 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA16141100110

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Tower A: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Closed/Covered79

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,508 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Umesh Kisan KandharePune (M Corp.)Pune
Ravindra Rajaram KandharePune (M Corp.)Pune
Subhash Raghunath JadhavWadagaon (CT)Pune
Hemlata Dnyaneshwar ShindePune (M Corp.)Pune
Mahesh Sadanand ShettyKamshetPune
Vijay Jagnnath VaruleVarulwadiPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI5761.65
Proposed, not sanctioned3,762 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandarkar Road Pune

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectABS Architect and Associates
ArchitectAr Dhananjay S Deshmukh
EngineerSandeep Rangdal and Associates
Chartered AccountantR V Porwal and Associates
Chartered AccountantSPCM & Associates
Chartered AccountantA.S. Jinturkar & Co.
PartnerRole in project
Enerrgia Skyi Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed145

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Skyi Aria Heights Phase I.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A.pdf19 Apr 2025
Layout approvalFile: 1-12-Layout.pdf14 Apr 2025
Building plan approvalFile: 2-12-Parking.pdf14 Apr 2025
Building plan approvalFile: 3-12-A.pdf14 Apr 2025
Building plan approvalFile: 4-12-A.pdf14 Apr 2025
Building plan approvalFile: 5-12-A.pdf14 Apr 2025
Copy of Layout Approval (in case of layout)File: 1-12-Layout.pdf14 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-12-Parking.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3-12-A.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-12-A.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5-12-A.pdf14 Apr 2025
Proforma of Agreement for saleFile: Agreement Draft-SB Heights A-C.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Details-Skyi Aria Heights Phase I.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Aria Heights.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A-30-09-24.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A-30-09-24.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A-30-09-24.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5-ESD-Aria Heights-Phase I.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Aria Heights.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A.pdf22 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A.pdf22 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A.pdf22 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aria Heights-Form 2A FY 2021-22.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aria Heights-Form 2A FY 2022-23.pdf22 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ESD_SB_Form 3_Aria Heights Phase I-Bldg A_23-04-24.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aria Heights-Form 2A.pdf21 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter-28-03-2024.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A-31-03-24.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A-31-03-24.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Skyi Aria Heights Phase 1.pdf22 Apr 2024
Declaration about Commencement CertificateFile: CC DECLARATION.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD DETAILS.pdf20 Apr 2024
Proforma of Agreement for saleFile: Agreement Draft.pdf20 Apr 2024
Layout approvalFile: Layout.pdf18 Apr 2024
Building plan approvalFile: Typical Floor Plan.pdf18 Apr 2024
Building plan approvalFile: 7th-12th Floor Plan.pdf18 Apr 2024
Building plan approvalFile: Section-Elevation.pdf18 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Typical Floor Plan.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 7th-12th Floor Plan.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Section-Elevation.pdf18 Apr 2024
Declaration about Commencement CertificateFile: Commencement Letter-28-03-2024.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Sula Heights Phase II-Bldg C.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3-Aria Heights Phase I-Bldg A.pdf12 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ARIA-PHASE I-Seprate bank.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: Aria Heights.pdf19 Jan 2024
Deviation Report with respect to model copy of AgreementFile: ATS-SB Heights.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A-31-12-23.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A-31-12-23.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A-31-12-23.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Aria Heights Phase I-Bldg A-13-12-23.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1-Sula Heights Phase II-Bldg C.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aria Heights Phase I-Bldg A-13-12-23.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Aria Heights Phase I-Bldg A-13-12-23.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ESD_SB_Form 1_Aria Heights Phase I-Bldg A_03-08-23.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ESD_SB_Form 1_Aria Heights Phase I-Bldg A_03-09-23.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ESD_SB_Form 1_Aria Heights Phase I-Bldg A_30-09-23.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ESD_SB_Form 2_Aria Heights Phase I-Bldg A_03-08-23.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ESD_SB_Form 2_Aria Heights Phase I-Bldg A_03-09-23.pdf18 Oct 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Skyi Songbirds Phase IISr No 274 and others Village Bhugaon Tal Mulshi Dist Pune357CompletedOct 2016Late, Mar 2017
Skyi Songbirds Phase ISr No 274 and others Village Bhugaon Tal Mulshi Dist Pune388CompletedSep 2015Late, Jan 2016

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Skyi Aria Heights Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhugaon13,700+ in Pune

2 kmSkyi Aria Heights Phase Completed 33Lapsed / revoked 24Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 95 registered projects within 2 km.

Builder: Enerrgia Skyi Developers

Enerrgia Skyi Developers has 12 registrations on MahaRERA, including Skyi Songbirds Phase A and Skyi Songbirds Phase B. Its filings disclose 7 earlier MahaRERA projects: declares 5 of 7 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Skyi Aria Heights Phase I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Skyi Aria Heights Phase I is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Skyi Aria Heights Phase I?

The registered promoter entity is Enerrgia Skyi Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Skyi Aria Heights Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Skyi Aria Heights Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Skyi Aria Heights Phase I?

The professionals named in the filing: Architect: ABS Architect and Associates; Architect: Ar Dhananjay S Deshmukh; Engineer: Sandeep Rangdal and Associates; Chartered Accountant: R V Porwal and Associates; Chartered Accountant: SPCM & Associates; Chartered Accountant: A.S. Jinturkar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Skyi Aria Heights Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skyi Aria Heights Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skyi Aria Heights Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.