Home / Browse projects / Thane, Maharashtra / SKY APARTMENT
SKY APARTMENT
RG-MH-06362 · RERA P51700055007 · Last updated on MahaRERA portal: 17 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SKY APARTMENT is a Residential / Group Housing project by SKY DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700055007 on 26 Feb 2024. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 11 of the 21 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSKY APARTMENT
- TypeResidential / Group Housing
- Location
- STATION ROAD
- ULHASNAGAR-4
- Ulhasnagar (M Corp.)
- Ulhasnagar
- Thane
- 421004
- Pincode421004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700055007
- ReraGenie IDRG-MH-06362
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Feb 2024
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 17 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SKY APARTMENT | NA | 9 | 7 | 21 | 0 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.
SKY APARTMENT: 60% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 85% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 85% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NANDU PANDURANG PATANKAR | Ulhasnagar (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | suyog associates |
| Engineer | Suyog Associates |
| Chartered Accountant | Jeetu A Ramrakhiyani |
| Chartered Accountant | Daksha Jeetu Ramrakhiyani |
| Partner | Role in project |
|---|---|
| SKY DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Letter to Rera.pdf | 17 Mar 2026 |
| Form 2File: Letter to Rera.pdf | 17 Mar 2026 |
| Form 3File: Letter to Rera.pdf | 17 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Letter to Rera.pdf | 17 Mar 2026 |
| Form 1File: Architect Certificate SKD Sept 25.pdf | 22 Dec 2025 |
| Form 2File: Engi Certificate SKD Sept 25.pdf | 22 Dec 2025 |
| Form 3File: Form 3 SD Sept 25.pdf | 22 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure.pdf | 22 Dec 2025 |
| Form 5 (FY 2024-2025)File: Signed Form 5_SD.pdf | 30 Sep 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 Sky Developers FY 23-24.pdf | 30 Sep 2025 |
| Form 1File: Architect Certificate SKD June 25.pdf | 23 Jul 2025 |
| Form 2File: Engi Certificate SKD June 25.pdf | 23 Jul 2025 |
| Form 3File: Form 3 Sky Developers.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Sky Developers June 25signed.pdf | 23 Jul 2025 |
| Form 1File: Architect Certificate SKD FY 23-24.pdf | 15 Jul 2025 |
| Form 2File: Engineering Certificate SKD FY 23-24.pdf | 15 Jul 2025 |
| Form 3File: Form 3 SD March FY 23-24.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Sky Developers March 24.pdf | 15 Jul 2025 |
| Form 1File: Architect Certificate SKD FY 24-25 June.pdf | 15 Jul 2025 |
| Form 2File: Engineering Certificate SKD FY 24-25 June.pdf | 15 Jul 2025 |
| Form 3File: Form 3 SD FY 24-25 June.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Sky Developers June 24.pdf | 15 Jul 2025 |
| Form 1File: Architect Certificate SKD FY 24-25 Sept.pdf | 15 Jul 2025 |
| Form 2File: Engineering Certificate SKD FY 24-25 Sept.pdf | 15 Jul 2025 |
| Form 3File: Form 3 SD FY 24-25 Sept.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Sky Developers Sept 24.pdf | 15 Jul 2025 |
| Form 1File: Architect Certificate SKD FY 2425 Dec.pdf | 15 Jul 2025 |
| Form 2File: Eng Certificate SKD FY 2425 Dec.pdf | 15 Jul 2025 |
| Form 3File: Form 3 SK FY 2425 Dec.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Sky Developers Dec 24.pdf | 15 Jul 2025 |
| Form 1File: Arc Certi 2425 March.pdf | 15 Jul 2025 |
| Form 2File: Eng Certi 2425 March.pdf | 15 Jul 2025 |
| Form 3File: Form 3 of Sky Developers.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Sky Developers March 25.pdf | 15 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Certi 2425 March.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certi 2425 March.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SKD FY 2425 Dec.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SK FY 2425 Dec.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate SKD FY 2425 Dec.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SKD FY 23-24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate SKD FY 23-24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SKD FY 24-25 Sept.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD March FY 23-24.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD FY 24-25 June.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD FY 24-25 Sept.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate SKD FY 23-24.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate SKD FY 24-25 June.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate SKD FY 24-25 Sept.pdf | 21 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Sky Developers FY 23-24.pdf | 21 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Sale Deed_Sky.pdf | 9 Feb 2024 |
| Other - TechnicalFile: Annexure A_Sky.pdf | 9 Feb 2024 |
| Other - TechnicalFile: Declaration on about Ownership-Sky.pdf | 9 Feb 2024 |
| Other - TechnicalFile: Letter of CC on Confirmation Mail-Sky.pdf | 9 Feb 2024 |
| Other - LegalFile: 01 (2).pdf | 1 Feb 2024 |
| Other - LegalFile: 02 (2).pdf | 1 Feb 2024 |
| Other - LegalFile: 03 (2).pdf | 1 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 001 (24).pdf | 26 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: No Emcumbrance Sky Developers.pdf | 19 Jan 2024 |
| Details of encumbrances concerned to LegalFile: No Emcumbrance Sky Developers.pdf | 19 Jan 2024 |
| CERSAI detailsFile: CERSAI CERTIFICATE_Sky Developers.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sky.pdf | 19 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organasation_Nitin1.pdf | 19 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organasation_Ankush.pdf | 19 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organasation_Hemant1.pdf | 19 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment Letter-Sky.pdf | 19 Jan 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement sKY.pdf | 19 Jan 2024 |
| Proforma of Agreement for saleFile: sky apartment_11zon.pdf | 17 Jan 2024 |
| Declaration in FORM BFile: 01.pdf | 14 Dec 2023 |
| Layout approvalFile: 123_compressed.pdf | 10 Dec 2023 |
| Copy of the legal title reportFile: 001 (19).pdf | 10 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 123_compressed.pdf | 10 Dec 2023 |
| Declaration about Commencement CertificateFile: 012 (1).pdf | 10 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 025.pdf | 10 Dec 2023 |
| Proforma of Allotment letterFile: 014.pdf | 10 Dec 2023 |
| Building plan approvalFile: 002 bha (8).pdf | 21 Jul 2023 |
| PAN CardFile: 001 (17).pdf | 21 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 002 bha (8).pdf | 21 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 002 bha (8).pdf | 21 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SKY APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ULHASNAGAR-47,600+ in Thane
Filed coordinates, straight-line distance. 119 registered projects within 2 km.
VISHWAJEET HEIGHTS
VISHWAJEET INFRASTRUCTURE
EMERALD TOWER
BABA & SEAGREEN DEVELOPERS LLP
Kohinoor Anaya
KGI REALTY PRIVATE LIMITED
SEA GREEN AURUS
Sea Green Homes
SEA GREEN PALACIA
SEAGREEN LIFESPACES LLP
A N EMPIRE
A N BUILDER AND DEVELOPERS
See every Thane project, with the district possession charts
Builder: SKY DEVELOPERS
Sky Developers has 10 registrations on MahaRERA, including Hayaat Palace and Hayaat Tower. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SKY APARTMENT shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SKY APARTMENT is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SKY APARTMENT?
The registered promoter entity is SKY DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SKY APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SKY APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SKY APARTMENT?
The professionals named in the filing: Architect: suyog associates; Engineer: Suyog Associates; Chartered Accountant: Jeetu A Ramrakhiyani; Chartered Accountant: Daksha Jeetu Ramrakhiyani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SKY APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback