Home / Browse projects / Thane, Maharashtra / SEA GREEN AURUS

Registered No litigation declared Others project

SEA GREEN AURUS

By Sea Green Homes

RG-MH-06384 · RERA P51700052512 · Last updated on MahaRERA portal: 14 Mar 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Feb 2027Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Stilt Floor, 90%
123 of 142Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

SEA GREEN AURUS is a Others project by Sea Green Homes in Thane, Maharashtra, registered with MahaRERA as P51700052512 on 8 Sep 2023. Possession is promised by 28 Feb 2027. The completion date has moved by 12 months from the original filing. 19 of the 142 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSEA GREEN AURUS
  • TypeOthers
  • Location
    • Near Deepak Darbar
    • Ward No. 53
    • Ulhasnagar
    • Ulhasnagar (M Corp.)
    • Ulhasnagar
    • Thane
    • 421004
  • Pincode421004
  • RERA no.P51700052512
  • ReraGenie IDRG-MH-06384

Builder

  • NameSea Green Homes
  • Entity typePartnership
  • GSTIN27ADVFS8101L1ZE
  • PartnersBalram Gurdino Harisinghani, Haresh Gurdinomal Harisinghani, Jawahar Kishanchand Dodeja

Key dates

this monthRegisteredSep 2023First promiseFeb 2026Revised toFeb 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Sep 2023
  • Promised completion28 Feb 2027
  • Revised completionRevised to 28 Feb 2027 (originally 28 Feb 2026)
  • Buildings1 building record
  • Documents filed141 files

Current status

13%19 of 142 units booked
57.4%Work done, per cost certificate

Figures as on 14 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sea Green HomesNA30291420142

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

Sea Green Homes: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor90%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 14 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes45%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes15%
Landscaping & Tree PlantingYes0%
Street LightingYes15%
Community BuildingsYes40%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes15%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes30%

Parking filed542

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots542
Closed/Covered128
Open Space414

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,502 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2024
LandownerVillageDistrict
Kishore Girdharilal KhubchandaniUlhasnagar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityULHASNAGAR MUNCIPAL CORPORATION
Permissible FSI19553.63
Proposed, not sanctioned19,554 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPanvelkar Plaza, Shop No 16,17,18,19 And 20, Station Road, Sai Section, Dist-Thane Ambernath Maharas
Estimated costRs 38.50 cr
Cost incurredRs 22.11 cr
Work done57.42%
BuildingWingEstimatedIncurred
Sea Green HomesNARs 36.50 crRs 20.99 cr
-NARs 2.00 crRs 1.12 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhushan Rupani
EngineerAVS Consultants
EngineerPrime Consultants
Chartered AccountantCA VIKAS KAMRA
Chartered AccountantUMESH ASWANI
Chartered AccountantMANISHA GERELLA
PartnerRole in project
Sea Green Homes-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03032620073Feb 2026 → Feb 2027

Reason as filed by the promoterDue to delays in slower-than-anticipated market conditions affecting sales and project cash flow, the construction timeline has been impacted; hence, we respectfully request a further extension of one year for completion of the project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2027

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: 1 Form 2A fy 2023-24 signed.pdf14 Mar 2026
Form 2A (FY 2024-2025)File: 2 Form 2A fy 2024-25 signed.pdf14 Mar 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 signed.pdf23 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 signed.pdf23 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 signed.pdf23 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 signed.pdf23 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 signed.pdf23 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 signed.pdf23 Feb 2026
Withdrawal Update Form 3File: FORM 3 30092025 FINAL.pdf23 Feb 2026
Withdrawal Update Form 3File: FORM 3 30092025 FINAL.pdf23 Feb 2026
Withdrawal Update Form 3File: FORM 3 31122025 FINAL.pdf23 Feb 2026
Form 5 (FY 2023-2024)File: 1 Form 5 Sea green fy 23 24 final signed.pdf23 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 SIGNED.pdf23 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 signed to upload.pdf12 Aug 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 signed to upload.pdf12 Aug 2025
Withdrawal Update Form 3File: 3 form 3 300624.pdf12 Aug 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 signed to upload.pdf29 Jul 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 signed to upload.pdf29 Jul 2025
Withdrawal Update Form 3File: 3 form 3 300624.pdf29 Jul 2025
Building plan approvalFile: aurus final plan_11zon.pdf25 Jul 2025
Commencement certificateFile: CC aurus 19-8-24.pdf25 Jul 2025
Form 1File: form 1 seagreen homes 300923.pdf25 Jul 2025
Form 2File: form 2 seagreen homes 300923.pdf25 Jul 2025
Form 3File: form 3 seagreen homes 300923.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 300923.pdf25 Jul 2025
Form 1File: form 1 seagreen.pdf25 Jul 2025
Form 2File: form 2 seagreen.pdf25 Jul 2025
Form 3File: form 3 seagreen.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf25 Jul 2025
Form 1File: 5 Form 1 31032024.pdf25 Jul 2025
Form 2File: 6 form 2 310324.pdf25 Jul 2025
Form 3File: 7 form 3 310324.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: 8 sold unsold 310324.pdf25 Jul 2025
Form 1File: 1 form 1 300624.pdf25 Jul 2025
Form 2File: 2 form 2 30062024.pdf25 Jul 2025
Form 3File: 3 form 3 300624.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: 4 sold unsold 300624.pdf25 Jul 2025
Form 1File: form 1 30092024 aurus.pdf25 Jul 2025
Form 2File: form 2 30092024 aurus.pdf25 Jul 2025
Form 3File: form 3 30092024 aurus.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 30092024 aurus.pdf25 Jul 2025
Form 1File: form 1 31122024 aurus.pdf25 Jul 2025
Form 2File: form 2 31122024 aurus.pdf25 Jul 2025
Form 3File: form 3 31122024 aurus final.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 31122024 aurus.pdf25 Jul 2025
Form 1File: 4 Architects Cert 31032025 form 1.pdf25 Jul 2025
Form 2File: 2 Form 2 AURUS 31032025.pdf25 Jul 2025
Form 3File: form 3 31032025 final.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 31032025.pdf25 Jul 2025
Building plan approvalFile: aurus final plan_11zon.pdf18 Jul 2025
Building plan approvalFile: CC aurus 19-8-24.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architects Cert 31032025 form 1.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 31032025 final.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 AURUS 31032025.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold 31032025.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Form 2A - QAC fy 23-24 FINAL.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Form 2A - QAC fy 24-25 FINAL.pdf22 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Sea green fy 23 24 final signed.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 form 1 300624.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30092024 aurus.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31122024 aurus.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 31032024.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 form 3 310324.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 form 3 300624.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30092024 aurus.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 31122024 aurus final.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 form 2 310324.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31122024 aurus.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30092024 aurus.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 form 2 30062024.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: 8 sold unsold 310324.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: 4 sold unsold 300624.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: sold unsold 30092024 aurus.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: sold unsold 30092024 aurus.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: sold unsold 31122024 aurus.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 seagreen.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 seagreen.pdf1 Mar 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 seagreen.pdf1 Mar 2024
Details of encumbrances concerned to FinanceFile: encumburances sea green.pdf29 Nov 2023

How this compares with Thane

13%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SEA GREEN AURUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ward No. 53, Ulhasnagar7,600+ in Thane

Builder: Sea Green Homes

Sea Green Homes has 1 registration on MahaRERA, including SEA GREEN AURUS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SEA GREEN AURUS is delayed beyond 28 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SEA GREEN AURUS?

The registered promoter entity is Sea Green Homes, a partnership as per the filing. Its GSTIN 27ADVFS8101L1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SEA GREEN AURUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SEA GREEN AURUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SEA GREEN AURUS?

The professionals named in the filing: Architect: Bhushan Rupani; Engineer: AVS Consultants; Engineer: Prime Consultants; Chartered Accountant: CA VIKAS KAMRA; Chartered Accountant: UMESH ASWANI; Chartered Accountant: MANISHA GERELLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SEA GREEN AURUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SEA GREEN AURUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SEA GREEN AURUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.