Sindhudurg Housing

By Omkar Housing

RG-MH-26780 · RERA P52900008573 · Last updated on MahaRERA portal: 17 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 75 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Sindhudurg Housing is a Others project by Omkar Housing in Sindhudurg, Maharashtra, registered with MahaRERA as P52900008573 on 19 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 75 months from the original filing.

At a glance

Project

  • NameSindhudurg Housing
  • TypeOthers
  • Location
    • Kudal (CT)
    • Kudal
    • Sindhudurg
    • 416520
  • Pincode416520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900008573
  • ReraGenie IDRG-MH-26780

Builder

  • NameOmkar Housing
  • Entity typePartnership
  • PartnersBhushan Chandrakant Bandekar, Rajeshvar Vishnu Kharat, Ramesh Vishnu Kharat, Prakash Rajaram Jaitapkar

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseSep 2019Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Sep 2019)
  • Buildings6 building records
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing GNA60000
Wing CNA90000
Wing DNA90000
Wing ENA50000
Wing FNA60000
Wing BNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 17 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 80%.

Wing G31%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C1%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D1%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing E31%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing F31%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure7%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes40%
Open ParkingYes0%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Open Space70
BuildingOpen SpaceTotal
Wing G1010
Wing C1010
Wing D1010
Wing E2020
Wing F1010
Wing B1010

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,520 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKudal Nagar Panchayat
Permissible FSI9543.81
Proposed, not sanctioned9,544 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSaraswat Bank, Shree Sharvani Complex, Kudal-Vengurla Road, Taluka-Kudal, District- Sindhudurg, PIN-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeepak Babaji Kubal
ArchitectNAVIN LAD
EngineerManoj Joshi
EngineerSiddhesh Bhikaji Dulbe
Chartered AccountantSagar G Teli
Chartered AccountantAmol Gajanan Khanolkar
PartnerRole in project
Omkar Housing-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900011295Sep 2019 → Dec 2025

Reason as filed by the promoterThe Project has B C D E F and G buildings i.e total Six buildings . The work in on completion stage. The possession is already given to allotees of B C D E F and G. Hence the allotees have no objection for extension of project. Considering the Covid Period for two and half years. The project need extension upto Dec 21, 2025 for completion and for which allottees have given consent. Kindly grant extension. Your kind co-operation in this regards is expected.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: Form 5 2023-24 Sindhudurg Housing (1).pdf17 Jan 2026
Form 5 (FY 2024-2025)File: Form-5 2024-25 Sindhudurg Housing (1).pdf17 Jan 2026
Form 1File: Form-1 31-3-2025.pdf31 Dec 2025
Form 2File: Eng Certificate Form-2 Jan 2025 to March 2025.pdf31 Dec 2025
Form 3File: Form-3 31-3-2025.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventory 31-03-2025.pdf31 Dec 2025
Form 1File: Form-1 30-6-2025.pdf31 Dec 2025
Form 2File: Eng Certificate Form-2 April 2025 to Jun 2025.pdf31 Dec 2025
Form 3File: Form-3 30-06-2025.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventory 30-06-2025.pdf31 Dec 2025
Form 1File: Form-1 30-9-2025.pdf31 Dec 2025
Form 2File: Eng Certificate Form-2 July 2025 to Sep 2025.pdf31 Dec 2025
Form 3File: Form-3 30-09-2025.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventory 30-09-2025.pdf31 Dec 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 31-12-2024.pdf6 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Form-2 Oct 2024 to Dec 2024.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold_Unsold Inventory 31-12-2024.pdf6 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 30-9-2024.pdf26 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Form-2 July 2024 to Sep 2024.pdf26 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 30-6-2023.pdf14 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Form-2 July 2023 to march 2024.pdf14 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Form-2 April 2024 to June 2024.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf14 Oct 2024
Other - LegalFile: Supplimentary Deed of Partnership_compressed.pdf21 Dec 2023
Copy of the legal title reportFile: New Legal Title Report Sindhudurg Housing.pdf8 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: cc verification mail from authority.pdf6 Dec 2023
Building plan approvalFile: SINDHUDURGH HOUSING KUDAL SANCTIONED PLAN PDF.pdf4 Dec 2023
Building Plan Approval (IOD)File: SINDHUDURGH HOUSING KUDAL SANCTIONED PLAN PDF.pdf4 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: SINDHUDURGH HOUSING KUDAL COMMENCEMENT CERTIFICATE.pdf4 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (July To Oct 2023)_compressed.pdf4 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate Sindhudurg Housing -.pdf4 Dec 2023
Declaration in FORM BFile: FORM B_compressed.pdf13 Sep 2023
Certificates of CA (Form 3)File: Certificate of CA (Form 3)_compressed.pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: CA Form 5 For the year ending 31-3-2018.pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA Form 5 for the year ending 31-3-2019.pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Form 5 For the year ending 31-3-2020.pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Form 5 For the year ending 31-03-2021 .pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5 for the year ending 31-3-2022.pdf6 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form 5 For the year ending 31-3-2023.pdf6 Sep 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2017-18.pdf10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2018-19.pdf10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf10 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory.pdf10 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf11 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng cerTIFICATE.pdf11 Jul 2023
Certificates of CA (Form 3)File: Rera Form 3.pdf11 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: form5 17-18.pdf11 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form5 18-19.pdf11 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form5 19-20.pdf11 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form5 20-21.pdf11 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form5 21-22.pdf11 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form5 22-23.pdf11 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 21.pdf10 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Dec 21.pdf10 Jan 2022
Layout approvalFile: Layout_Plan.PDF30 Jul 2017
Building plan approvalFile: IOD-compressed.pdf30 Jul 2017
PAN CardFile: PAN_New.PDF30 Jul 2017
Copy of the legal title reportFile: Title_Search_Report-compressed.pdf30 Jul 2017
Details of encumbrancesFile: No_Encumbrances_Certificate.PDF30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout_Plan.PDF30 Jul 2017
Building Plan Approval (IOD)File: IOD-compressed.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement_Certificate.pdf30 Jul 2017
Declaration in FORM BFile: Form_B_Affidavit_Bhushan_Bandekar compressed.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_Architect_Certificate-compressed.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2_Engineer_Certificate-compressed.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA_Certificate.PDF30 Jul 2017
Proforma of Allotment letterFile: Proforma_Deed-compressed.pdf30 Jul 2017

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one moved by 75 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is among them

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Sindhudurg Housing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kudal (CT)530+ in Sindhudurg

2 kmSindhudurg HousingCompleted 17Lapsed / revoked 10Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: Omkar Housing

Omkar Housing has 1 registration on MahaRERA, including Sindhudurg Housing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What does it mean that Sindhudurg Housing shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sindhudurg Housing is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sindhudurg Housing?

The registered promoter entity is Omkar Housing, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sindhudurg Housing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sindhudurg Housing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sindhudurg Housing?

The professionals named in the filing: Architect: Deepak Babaji Kubal; Architect: NAVIN LAD; Engineer: Manoj Joshi; Engineer: Siddhesh Bhikaji Dulbe; Chartered Accountant: Sagar G Teli; Chartered Accountant: Amol Gajanan Khanolkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sindhudurg Housing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sindhudurg Housing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sindhudurg Housing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.