Simna Heights / Shantichndra Heights

By ASHRAF VALI MOHAMMAD QURESH

RG-MH-95209 · RERA P51900017724 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 96 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2027Possession promisedmoved 96 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 156 documents Report an error

Simna Heights / Shantichndra Heights is a Residential / Group Housing project by ASHRAF VALI MOHAMMAD QURESH in Dongri, 400009, registered with MahaRERA as P51900017724 on 6 Sep 2018. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSimna Heights / Shantichndra Heights
  • TypeResidential / Group Housing
  • Location
    • Samant Bhai Nanji Marg
    • Dongri
    • 400009
  • Pincode400009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900017724
  • ReraGenie IDRG-MH-95209

Builder

  • NameASHRAF VALI MOHAMMAD QURESH
  • Entity typeIndividual

Key dates

this monthRegisteredSep 2018First promiseDec 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Sep 2018
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed156 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Simna Heights / Shantichandra HeightsNA2915000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Simna Heights / Shantichandra Heights: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered21

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area390 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI1848.54
Proposed, not sanctioned1,849 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 6 to 9 poddar building no 1 Dr Maheshwari Road Dongri Sandhurst Road Mumbai 400 009

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs Kazi & Associates
EngineerBOPARI M FAROOQUE N
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantGaurav S Rajpal & Co
Chartered AccountantN B Sayed & Associates
PartnerRole in project
ASHRAF VALI MOHAMMAD QURESH-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900006231Dec 2019 → Dec 2022

Reason as filed by the promoterRespected Sirs, The project is about 87% complete. The delay is due to changes in the current development regulations & policies, by the local authorities we were granted extra FSI to construct premises for Tenant Rehabilitation. Hence the total proposed constructed area increased. We were to apply for extension earlier, but due to the COVID-19 Lockdown, it was difficult for us to get our compliances in place. We've already taken NOC from the existing allottees/purchasers. We have the required funds, permissions & clearances to complete the project and get the OC, however the slow down due to

EXT51900016928Dec 2019 → Jun 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 68% allottees for purpose of extension of RERA registration period of the said project.

EXT51900028402Dec 2019 → Dec 2027

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000303557Shravan GandhiM/s As-Simna Construction Builder Developers02/12/2022
CC12500080Ashraf Vali Mohammad QureshiDimple Shravan Gandhi08/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed156

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 156 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Simna Heights Shantichandra Heights as on Sep 2025.pdf29 May 2026
Form 2File: Form 2 - Simna Heights and Shantichandra Heights as on sep 2025.pdf29 May 2026
Form 3File: Form 3- Simna Heights and Shantichandra Heights -as on sep 2025.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Simna Heights Shantichandra Heights as on Sep 2025.pdf29 May 2026
Form 1File: Form 1 - Simna Heights and Shantichandra Heights as on Dec 2025.pdf29 May 2026
Form 2File: Form 2 - Simna Heights and Shantichandra Heights as on Dec 2025.pdf29 May 2026
Form 3File: Form 3 - Simna Heights and Shantichandra Heights as on Dec 2025.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Simna Heights Shantichndra Heights as on december 2025.pdf29 May 2026
Form 1File: Form 1 - Simna Heights and Shantichandra Heights as on March 2026.pdf29 May 2026
Form 2File: Form 2 - Simna Heights and Shantichandra Heights as on March 2026.pdf29 May 2026
Form 3File: Form 3- Simna Heights and Shantichandra Heights as on March 2026.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Simna Heights and shantichandra Heights as on march 2026.pdf29 May 2026
Form 5 (FY 2023-2024)File: Form 5 of Simna Heights Shanti Chandraheights As on FY 2023-24.pdf1 Oct 2025
Form 1File: Form 1 - Simna Heights Shantichandra Heights - March 2025.pdf9 Sep 2025
Form 2File: Form 2 - Simna Heights Shantichandra Heights - March 2025.pdf9 Sep 2025
Form 3File: Form 3- Simna Heights Shantichandra Heights - March 2025.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Simna Heights Shantichandra Heights - March 2025.pdf9 Sep 2025
Form 1File: Form 1 - Simna Heights Shantichandra Heights as on September 2024.pdf9 Sep 2025
Form 2File: Form 2 - Simna Heights Shantichandra Heights as on September 2024.pdf9 Sep 2025
Form 3File: Form 3- Simna Heights Shantichandra Heights as on September 2024.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Simna Heights Shantichandra Heights as on September 2024.pdf9 Sep 2025
Form 1File: Form 1- Simna Heights Shantichandra Heights - December 24.pdf9 Sep 2025
Form 2File: Form 2- Simna Heights Shantichandra Heights - December 24.pdf9 Sep 2025
Form 3File: Form 3- Simna Heights Shantichandra Heights - December 24.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Simna Heights Shantichandra Heights - December 24.pdf9 Sep 2025
Form 1File: Form 1 - Simna Heights Shantichandra Heights - June 2024.pdf9 Sep 2025
Form 2File: Form 2 - Simna Heights Shantichandra Heights - June 2024.pdf9 Sep 2025
Form 3File: Form 3- Simna Heights Shantichandra Heights - June 2024.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Simna Heights Shantichandra Heights - June 2024.pdf9 Sep 2025
Form 1File: Form 1 - Simna Heights as on June 2025.pdf5 Aug 2025
Form 2File: Form 2 - Simna Heights as on June 2025.pdf5 Aug 2025
Form 3File: Form 3 - Simna Heights as on June 2025.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Simna Heights as on June 2025.pdf5 Aug 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf17 Feb 2025
Certificates of CA (Form 3)File: 20 Certificates of CA (Form 3).pdf17 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Simna Heights Shantichndra Heights as on Dec 2024.pdf23 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Simna Heights June 24.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Simna Heights Sep 24.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29 Simna Heights June 24.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29 Simna Heights Sep 24.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Simna Heights June 24.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Simna Heights Sep 24.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29 Simna Heights June 24.pdf10 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29 Simna Heights Sep 24.pdf10 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Simna Heights as on March 2024.pdf26 Apr 2024
Certificates of CA (Form 3)File: Form 3- Simna Heights Shantichandra Heights - March 2024.pdf20 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Simna Heights as on March 2024_compressed.pdf16 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Simna Heights as on Dec 2023.pdf19 Jan 2024
Certificates of CA (Form 3)File: Form 3- Simna Heights and Shantichandra Heights - Dec 2023.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Simna Heights Shantichandra Heights Dec 2023.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Simna Heights as on Sep 2023.pdf4 Dec 2023
Certificates of CA (Form 3)File: Form 3 - Simna Heights as on Sep 2023.pdf4 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Simna Heights as on 30-09-2023_compressed.pdf28 Oct 2023
Disclosure of sold/ booked inventoryFile: Circular 29- Simna Heights as on 30-09-2023.pdf28 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Simna Heights as on March 2023.pdf22 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Simna Heights as on March 2023.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Simna Heights as on June 2023.pdf19 Jul 2023
Certificates of CA (Form 3)File: Form 3- Simna Heights and Shantichandra Heights -Mar 23.pdf19 Jul 2023
Certificates of CA (Form 3)File: Form 3- Simna Heights and Shantichandra Heights - June 23.pdf19 Jul 2023
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION 2023.pdf28 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERTIFICATE 28-06-2023.pdf28 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 2023.pdf28 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate 2019-20_compressed.pdf28 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 2020-21.pdf28 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate 2021-22.pdf28 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate 2022-23.pdf28 Jun 2023
Certificates of CA (Form 3)File: CHARTERED ACCOUNTANT CERTIFICATE 2023_compressed.pdf28 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19.pdf28 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20.pdf28 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21.pdf28 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22.pdf28 Jun 2023
Declaration about Commencement CertificateFile: FORMAT D.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- April 2021.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- April 2020.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- January 2022.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- April 2022.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- July 2022.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- October 2022.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- January 2023.pdf11 Apr 2023

Keep Simna Heights / Shantichndra Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dongri

2 kmSimna Heights / ShantichCompleted 1Lapsed / revoked 5Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: ASHRAF VALI MOHAMMAD QURESH

ASHRAF VALI MOHAMMAD QURESH has 1 registration on MahaRERA, including Simna Heights / Shantichndra Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Simna Heights / Shantichndra Heights is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Simna Heights / Shantichndra Heights?

The registered promoter entity is ASHRAF VALI MOHAMMAD QURESH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Simna Heights / Shantichndra Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Simna Heights / Shantichndra Heights?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Simna Heights / Shantichndra Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Simna Heights / Shantichndra Heights?

The professionals named in the filing: Architect: Ms Kazi & Associates; Engineer: BOPARI M FAROOQUE N; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Gaurav S Rajpal & Co; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Simna Heights / Shantichndra Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Simna Heights / Shantichndra Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Simna Heights / Shantichndra Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.