Home / Browse projects / Raigarh, Maharashtra / SILVRA ONE
SILVRA ONE
By BONZER INFRA PRIVATE LIMITED
RG-MH-44870 · RERA P52000049036 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SILVRA ONE is a Others project by BONZER INFRA PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000049036 on 30 Jan 2023. Possession is promised by 31 Dec 2027. 67 of the 196 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSILVRA ONE
- TypeOthers
- Location
- VILLAGE TAKAI
- KHOPOLI
- Tuksai
- Khalapur
- Raigarh
- 410203
- Pincode410203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000049036
- ReraGenie IDRG-MH-44870
Builder
- NameBONZER INFRA PRIVATE LIMITED
- Entity typeCompany
- GSTIN27AAECB0575G1ZT
- Managing DirectorSHAILESH NARSINH PATEL
- DirectorsATULKUMAR NARSINH PATEL, NARSINH MEBHAJI PATEL
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Jan 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed81 files
Current status
Figures as on 30 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 1 | NA | 11 | 10 | 148 | 48 | 196 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 50%.
Building 1: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed464
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building 1 | NA | Rs 29.40 cr | Rs 17.64 cr |
| - | NA | Rs 1.40 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Inspire Architect PRATIK SENGHANI |
| Architect | PRATIK SENGHANI |
| Engineer | S V Patel and Associates |
| Engineer | SURENDRA VELJI PATEL |
| Chartered Accountant | h v patel and associates |
| Chartered Accountant | HARESHKUMAR VASHRAMBHAI PATEL |
| Chartered Accountant | Dipali Kadam |
| Partner | Role in project |
|---|---|
| BONZER INFRA PRIVATE LIMITED | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| S C S NO 351/2013/2013 | PANVEL COURT SENIOR DIVISION | PENDING |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000408327 | Shafiahmed Hakim Janjali | Bonzer Infra Private Limited | 04/12/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 May 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 300625.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: BONZER FORM 1 Q3 311225.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 Q4 310326.pdf | 30 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 30062025.pdf | 30 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 30 Jun 2026 |
| Withdrawal Update Form 2File: BONZER FORM 2 Q3 311225.pdf | 30 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 Q4 310326.pdf | 30 Jun 2026 |
| Withdrawal Update Form 3File: Bonzer Infra Form3 30062025.pdf | 30 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 Q2.pdf | 30 Jun 2026 |
| Withdrawal Update Form 3File: BONZER FORM 3 Q3 311225.pdf | 30 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 Q4 310326.pdf | 30 Jun 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1 FY 25-26.pdf | 15 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bonzer Infra Form-3-.pdf | 15 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SILVARA ONE Q-1.pdf | 15 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 FORM-1.pdf | 17 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf | 17 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Bonzer Infra.pdf | 17 May 2025 |
| Form 1File: 8 FORM-1.pdf | 14 May 2025 |
| Copy of the legal title reportFile: Title Cerificate updated.pdf | 11 May 2025 |
| Other - LegalFile: Bonzer Status Cerificate Cum Report.pdf | 11 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2023.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2023.pdf | 25 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2024.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2024.pdf | 25 Mar 2025 |
| Building plan approvalFile: SILVRA ONE REVISED CC DRAWING Part 1.pdf | 21 Mar 2025 |
| Building plan approvalFile: SILVRA ONE REVISED CC DRAWING Part 2.pdf | 21 Mar 2025 |
| Building plan approvalFile: SILVRA ONE REVISED CC DRAWING Part 3.pdf | 21 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: SILVRA ONE REVISED CC compressed.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: SILVRA ONE REVISED CC DRAWING Part 1.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: SILVRA ONE REVISED CC DRAWING Part 2.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: SILVRA ONE REVISED CC DRAWING Part 3.pdf | 21 Mar 2025 |
| Building plan approvalFile: REVISED SILVRA ONE CC DRAWINGS SCANNED compress.pdf | 17 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED SILVRA ONE CC ORDER SCANNED .pdf | 17 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: REVISED SILVRA ONE CC DRAWINGS SCANNED compress.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 7 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 compressed.pdf | 7 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 7 Dec 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Seperate Declaration.pdf | 3 Jul 2024 |
| Other - LegalFile: Status Certificate Report and Order.pdf | 8 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 dt 27 05 24.pdf | 7 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dt 06 05 24.pdf | 7 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2023.pdf | 7 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2024.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Bonzer 290424 signed final.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 16 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 4 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 4 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate 311223.pdf | 13 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Forms 1 _DEC23.pdf | 12 Jan 2024 |
| Copy of the legal title reportFile: Shailendra Title rtn 16 Dec 2023.pdf | 5 Jan 2024 |
| Other - LegalFile: Roznama Bonzer to be Upload final.pdf | 5 Jan 2024 |
| Other - LegalFile: Exhibit 5 and 31 Case 351 2013 upload Final.pdf | 5 Jan 2024 |
| Copy of the legal title reportFile: Title Report.pdf | 4 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 22 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate Dt 210723.pdf | 22 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Silvra One 2207 signed.pdf | 22 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encrumbrance _Bonzer.pdf | 24 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encrumbrance _Bonzer.pdf | 24 Jan 2023 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 19 Jan 2023 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 13 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with Allotment letter.pdf | 13 Jan 2023 |
| Layout approvalFile: Layout_1.pdf | 10 Jan 2023 |
| Building plan approvalFile: Layout Page 2.pdf | 10 Jan 2023 |
| PAN CardFile: Bonzer PAN Card.pdf | 10 Jan 2023 |
| Copy of the legal title reportFile: Title Report_11zon.pdf | 10 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration Finance.pdf | 10 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Declaration Finance.pdf | 10 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: Layout_1.pdf | 10 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout Page 2.pdf | 10 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC and Property Card.pdf | 10 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration Commencement certificate.pdf | 10 Jan 2023 |
| Declaration in FORM BFile: Form B Declaration_11zon.pdf | 10 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Architect Certificate.pdf | 10 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate_Final.pdf | 10 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate_11zon.pdf | 10 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Interest Real Estate Final.pdf | 10 Jan 2023 |
| Proforma of Agreement for saleFile: Draft Agreement for Sale.pdf | 10 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Seperate Bank Ac.pdf | 10 Jan 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Bonzer Celebration | Serve No-06, Hissa No-1B,1,2,3,4, Khopoli Pen Road, Opp. Vithoba Temple, Takai, Khopoli | Completed | Sep 2016 | Jun 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SILVRA ONE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHOPOLI5,900+ in Raigarh
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
Godrej Hillview Estate
Godrej Projects Development Limited
Haware My First Home Shil Phata Phase 2 Bldg 1
Haware Properties LLP
UNIMONT IMPERIA
RSM DESIGNERS
Haware My First Home Shil Phata Phase 1 Bldg 1
Haware Properties LLP
AeroEstate
HOABL Landmark Realty Private Limited
Haware My First Home Shil Phata Phase 2 Bldg 2
Haware Properties LLP
See every Raigarh project, with the district possession charts
Builder: BONZER INFRA PRIVATE LIMITED
BONZER INFRA PRIVATE LIMITED has 1 registration on MahaRERA, including SILVRA ONE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SILVRA ONE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SILVRA ONE?
The registered promoter entity is BONZER INFRA PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAECB0575G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SILVRA ONE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SILVRA ONE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SILVRA ONE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SILVRA ONE?
The professionals named in the filing: Architect: Inspire Architect PRATIK SENGHANI; Architect: PRATIK SENGHANI; Engineer: S V Patel and Associates; Engineer: SURENDRA VELJI PATEL; Chartered Accountant: h v patel and associates; Chartered Accountant: HARESHKUMAR VASHRAMBHAI PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SILVRA ONE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.