Registration lapsed No litigation declared Residential / Group Housing project

Silver Spring

By M/s. Shri Venkatesh Ramdev Homes

RG-MH-64377 · RERA P51700006557 · Last updated on MahaRERA portal: 15 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 45 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
4 of 11Construction stages doneacross 2 buildings; furthest along: Staircases, 80%
53 of 132Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

Silver Spring is a Residential / Group Housing project by M/s. Shri Venkatesh Ramdev Homes in Thane, Maharashtra, registered with MahaRERA as P51700006557 on 14 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 45 months from the original filing. 79 of the 132 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSilver Spring
  • TypeResidential / Group Housing
  • Location
    • Station Road
    • Bhayandar
    • Thane
    • 401101
  • Pincode401101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700006557
  • ReraGenie IDRG-MH-64377

Builder

  • NameM/s. Shri Venkatesh Ramdev Homes
  • Entity typePartnership
  • PartnersManoj Motaji Purohit, Santosh Kanwar Uttam Shah, Pankaj Manoj Purohit

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseMar 2022Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Mar 2022)
  • Buildings2 building records
  • Documents filed86 files

Current status

60%79 of 132 units booked

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Silver Spring Wing ANA181783083
SILVER SPRING WING CNA191749049

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 80%.

Silver Spring Wing A62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SILVER SPRING WING CNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered2
Open Space52
BuildingClosed/CoveredOpen SpaceTotal
Silver Spring Wing A13435
SILVER SPRING WING C11819

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,780 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMBMC
Permissible FSI9739.46
Proposed, not sanctioned9,739 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchArihant Apartment Bhayandar West Thane 401101

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnish and Associates
EngineerJiten Patil
Chartered AccountantRamesh D Lukad
PartnerRole in project
M/s. Shri Venkatesh Ramdev Homes-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700011857Mar 2022 → Dec 2024

Reason as filed by the promoterDue to Covid pandemic there was a slow down in construction work and various permission from respected gov authorities was delayed and therefore there was a need to extend the date of Completion of Project. As regard to Maharera Notification all the compliance related to extension is completed and attach for your reference. We request Maharera for please accept our application and update for extension date as soon as possible. Thank You

EXT51700027162Mar 2022 → Dec 2025

Reason as filed by the promoterTo, The Authority, Maharashtra Real Estate Regulatory Authority (MahaRERA), Mumbai, Maharashtra. Subject: Request for Extension of Project Registration for "Silver Spring" under RERA No. P51700006557 Respected Sir/Madam, We, M/s Shri Venkatesh Ramdev Homes, are the developers of the project "Silver Spring," registered under RERA No. P51700006557, located at New S. No. 11, Hissa No. 2B. The project comprises two buildings, Wing A and Wing C, with a total of 132 units (83 units in Wing A and 49 units in Wing C). We wish to bring the following details to your kind attention: Occupancy Certificate

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Feb 2023

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 30012023141126_compressed.pdf15 Jun 2026
Withdrawal Update Form 2File: Form2_compressed.pdf15 Jun 2026
Withdrawal Update Form 3File: CA FORM 3.pdf15 Jun 2026
Form 5 (FY 2021-2022)File: CA (Form 5) (FY 2021-22).pdf14 Mar 2026
Form 5 (FY 2022-2023)File: CA (Form 5) (FY 2022-23).pdf14 Mar 2026
Form 5 (FY 2023-2024)File: CA (Form 5) (FY 2023-24).pdf14 Mar 2026
Withdrawal Update Form 1File: 30012023141126_compressed.pdf27 Dec 2025
Withdrawal Update Form 1File: 30012023141126_compressed.pdf27 Dec 2025
Withdrawal Update Form 2File: Form2_compressed.pdf27 Dec 2025
Withdrawal Update Form 2File: Form2_compressed.pdf27 Dec 2025
Withdrawal Update Form 3File: CA FORM 3.pdf27 Dec 2025
Withdrawal Update Form 3File: CA FORM 3.pdf27 Dec 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf12 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf12 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: venkatesh ramdevhomes 22-23.pdf11 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project) (1).pdf10 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manojbhai_Bhayander W Engineer Certificate_APRIL-JUNE 2024 (1).pdf10 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manojbhai_Bhayander W Engineer Certificate_JULY-SEP 2024 (1).pdf10 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Manojbhai_Bhayander W Engineer Certificate_OCT-DEC 2024 (1).pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: sILVER SPRING-SOLD UNSOLD.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: venkatesh ramdevhomes 23-24.pdf10 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: silverspring030924.pdf6 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: silverspring051224.pdf6 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: silverspring040225.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SHRI VENKATESH RAMDEV HOME_0001.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SHRI VENKATESH RAMDEV HOME1_0001.pdf28 Jan 2025
Certificates of CA (Form 3)File: SILVER SPRING APRIL TO JUNE24.pdf13 Jan 2025
Certificates of CA (Form 3)File: SILVER SPRING JULY TO SEP24.pdf13 Jan 2025
Certificates of CA (Form 3)File: SILVER SPRING OCT TO DEC24.pdf13 Jan 2025
Declaration in FORM BFile: FORM B.pdf11 Jan 2025
Building plan approvalFile: BLDG A.pdf18 Feb 2023
Building plan approvalFile: BLDG C.pdf18 Feb 2023
Building Plan Approval (IOD)File: BLDG A.pdf18 Feb 2023
Building Plan Approval (IOD)File: BLDG C.pdf18 Feb 2023
Disclosure of sold/ booked inventoryFile: 07022023162002_compressed.pdf18 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2a.pdf9 Feb 2023
Disclosure of sold/ booked inventoryFile: ANNEXURE -PANKAJ pUROHIT.pdf4 Feb 2023
Disclosure of sold/ booked inventoryFile: ANNEXURE -Santosh Shah.pdf4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE - Prakash Jain.pdf4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE -Manoj Purohit.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5.pdf3 Feb 2023
Details of encumbrances concerned to FinanceFile: Venkatesh-Legal.pdf2 Feb 2023
Details of encumbrances concerned to LegalFile: Venkatesh-Legal.pdf2 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30012023141126_compressed.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_compressed.pdf2 Feb 2023
Certificates of CA (Form 3)File: CA FORM 3.pdf2 Feb 2023
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf2 Feb 2023
Proforma of Allotment letterFile: Venkatesh-Allotment.pdf2 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Venkatesh- Seperate Bank.pdf2 Feb 2023
Deviation Report with respect to Allotment letterFile: Venkatesh-Allotment Letter.pdf2 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Venkatesh-Agreement.pdf2 Feb 2023
Layout approvalFile: Layout_compressed.pdf29 Jan 2023
Building plan approvalFile: Bldg Plan a_compressed.pdf29 Jan 2023
Building plan approvalFile: Bldg Plan C_compressed.pdf29 Jan 2023
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf29 Jan 2023
Building Plan Approval (IOD)File: Bldg Plan a_compressed.pdf29 Jan 2023
Building Plan Approval (IOD)File: Bldg Plan C_compressed.pdf29 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Jan 2023
Disclosure of sold/ booked inventoryFile: D01.pdf25 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200237394219_For_Asset_Based_Search_16_05_2022_16_52_14_909.pdf16 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form - 5 (2019-20).pdf1 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form - 5 (2020-21).pdf1 Dec 2021
Declaration about Commencement CertificateFile: Shri Venkatesh Ramdev Homes (Format-D) 15-11-2021.pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Shri Venkatesh Ramdev Homes (Quality Assurance Certificate).pdf15 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Shri Venkatesh Ramdev Homes (Quality Assurance Certificate).pdf15 Nov 2021
Disclosure of sold/ booked inventoryFile: Shri Venkatesh Ramdev Homes (Sold Unsold List).pdf15 Nov 2021
Layout approvalFile: Layout Plan.pdf12 Nov 2019
Building plan approvalFile: Floor Plan.pdf12 Nov 2019
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf12 Nov 2019
Building Plan Approval (IOD)File: Floor Plan.pdf12 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: New CC 17 floor.pdf23 Oct 2019
Declaration in FORM BFile: Form B AFF.pdf23 Oct 2019
Layout approvalFile: Layout Plan 1.pdf30 Jul 2017
Building plan approvalFile: Building Plan.pdf30 Jul 2017
PAN CardFile: PAN CARD.pdf30 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf30 Jul 2017
Details of encumbrancesFile: No Encumbrance Certificate.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: Building Plan.pdf30 Jul 2017

How this compares with Thane

60%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 45 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Silver Spring on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhayandar7,600+ in Thane

2 kmSilver SpringCompleted 27Lapsed / revoked 18Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 95 registered projects within 2 km.

Builder: M/s. Shri Venkatesh Ramdev Homes

M/s. Shri Venkatesh Ramdev Homes has 1 registration on MahaRERA, including Silver Spring. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Silver Spring shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Silver Spring is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Silver Spring?

The registered promoter entity is M/s. Shri Venkatesh Ramdev Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Silver Spring?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Silver Spring?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Silver Spring?

The professionals named in the filing: Architect: Anish and Associates; Engineer: Jiten Patil; Chartered Accountant: Ramesh D Lukad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Silver Spring?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Silver Spring. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Silver Spring to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.