ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SILVER NEST

Registered No litigation declared Others project

SILVER NEST

By SILVER NEST

RG-MH-22051 · RERA P52100030154 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
57 of 77Construction stages doneacross 7 buildings; furthest along: Installation of Lifts, 90%
4 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

SILVER NEST is a Others project by SILVER NEST in Pune, Maharashtra, registered with MahaRERA as P52100030154 on 31 Jul 2021. Possession is promised by 31 Dec 2026. 68 of the 72 units on this registration are recorded sold or booked, and 57 of 77 construction stages are filed complete.

At a glance

Project

  • NameSILVER NEST
  • TypeOthers
  • Location
    • CHIKHALI
    • Haveli
    • Pune
    • 412114
  • Pincode412114
  • RERA no.P52100030154
  • ReraGenie IDRG-MH-22051

Builder

  • NameSILVER NEST
  • Entity typePartnership
  • PartnersGANESH JADHAV, SANTOSH BARNE, VISHAL JADHAV

Key dates

this monthRegisteredJul 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings7 building records
  • Documents filed75 files

Current status

94%68 of 72 units booked
84.3%Work done, per cost certificate

Figures as on 30 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA6510010
B WINGNA6510010
C WINGNA6510010
D WINGNA6510010
E WINGNA6510010
F WINGNA7612012
COMMERCIALNA5501010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

57 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Installation of Lifts, at 90%.

A WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
C WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
D WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
E WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
F WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
COMMERCIAL90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes95%
Street LightingYes90%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered29
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
A WING505
B WING505
C WING505
D WING505
E WING404
F WING505
COMMERCIAL01010

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,100 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jun 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI7310.0
Proposed, not sanctioned2,310 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAJMERA COMPLEX PIMPRI PUNE 411018
Estimated costRs 9.00 cr
Cost incurredRs 7.59 cr
Work done84.35%
BuildingWingEstimatedIncurred
F WINGNARs 1.60 crRs 1.35 cr
A WINGNARs 1.43 crRs 1.21 cr
D WINGNARs 1.43 crRs 1.21 cr
B WINGNARs 1.03 crRs 86.65 lakh
C WINGNARs 1.03 crRs 86.65 lakh
E WINGNARs 1.00 crRs 84.62 lakh
-NARs 1.00 crRs 83.51 lakh
COMMERCIALNARs 48.55 lakhRs 41.01 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARATI BAHIRAT
EngineerRAM RANDHAVE
EngineerRAGHVENDRA ANKALGI
Chartered AccountantNAVDEEP JINDAL
Chartered AccountantCA Dolly Gandhi
PartnerRole in project
SILVER NEST-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Feb 2025

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 signed_page-0001.pdf30 Sep 2025
Withdrawal Update Form 1File: Form-1.pdf11 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf11 Aug 2025
Withdrawal Update Form 3File: Form 3 Signed.pdf11 Aug 2025
Form 1File: Form 1.pdf23 Jul 2025
Form 2File: FORM 2.pdf23 Jul 2025
Form 3File: FORM 3 - Signed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf23 Jul 2025
Form 1File: Form 1.pdf23 Jul 2025
Form 2File: FORM 2.pdf23 Jul 2025
Form 3File: FORM 3 Signed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf23 Jul 2025
Form 1File: Form - 1.pdf23 Jul 2025
Form 2File: FORM 2.pdf23 Jul 2025
Form 3File: FORM 3 - Signed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf23 Jul 2025
Form 1File: Form 1.pdf23 Jul 2025
Form 2File: Form 2.pdf23 Jul 2025
Form 3File: FORM 3 -Signed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Signed.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Mar_25.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 june 2024.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sept 24.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec 24.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jun 2024.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2024.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Sep 24.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Sep 24.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silver Nest Form-3 DEC_24 SIGNED.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silver Nest Form-3 Sep_24 SIGNED.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Silver Nest Form-3 Jun_24 SIGNED.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 June_24.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Sep_24.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Dec_24.pdf18 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Completion Silver Nest_11zon.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure June_24.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure Sept_24.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure Dec24.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: audit report form 5 SILVER NEST_SIGNED.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Silver Nest signed.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Silver Nest.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure.pdf24 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form-5 silver nest_.pdf1 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SILVER NEST.pdf3 Feb 2023
Declaration in FORM BFile: FORM B - PROMOTER.pdf19 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE.pdf19 Jul 2021
Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf19 Jul 2021
Copy of the legal title reportFile: SEARCH REPORT IN RERA FORMAT.pdf18 Jul 2021
Layout approvalFile: 1.pdf15 Jul 2021
Building plan approvalFile: 2.pdf15 Jul 2021
Building plan approvalFile: 3.pdf15 Jul 2021
Building plan approvalFile: 4.pdf15 Jul 2021
Building plan approvalFile: 5.pdf15 Jul 2021
Building plan approvalFile: 6.pdf15 Jul 2021
Building plan approvalFile: 7.pdf15 Jul 2021
Building plan approvalFile: 8.pdf15 Jul 2021
PAN CardFile: Firm Pan Card.pdf15 Jul 2021
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf15 Jul 2021
Copy of Layout Approval (in case of layout)File: 1.pdf15 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf15 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf15 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf15 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf15 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf15 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf15 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf15 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf15 Jul 2021
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf15 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf15 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf15 Jul 2021

How this compares with Pune

94%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SILVER NEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKHALI13,700+ in Pune

Builder: SILVER NEST

SILVER NEST has 1 registration on MahaRERA, including SILVER NEST. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SILVER NEST is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SILVER NEST?

The registered promoter entity is SILVER NEST, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SILVER NEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SILVER NEST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SILVER NEST?

The professionals named in the filing: Architect: ARATI BAHIRAT; Engineer: RAM RANDHAVE; Engineer: RAGHVENDRA ANKALGI; Chartered Accountant: NAVDEEP JINDAL; Chartered Accountant: CA Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SILVER NEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SILVER NEST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SILVER NEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.