Home / Browse projects / Palghar, Maharashtra / SILVER GREEN
SILVER GREEN
RG-MH-20581 · RERA P99000007490 · Last updated on MahaRERA portal: 20 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 53 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SILVER GREEN is a Residential / Group Housing project by ACRES DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000007490 on 17 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 53 months from the original filing. 92 of the 107 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.
At a glance
Project
- NameSILVER GREEN
- TypeResidential / Group Housing
- Location
- 0
- Bandate
- Palghar
- 401102
- Pincode401102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000007490
- ReraGenie IDRG-MH-20581
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Jul 2022)
- Buildings3 building records
- Documents filed53 files
Current status
Figures as on 20 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 1 | NA | 5 | 4 | 22 | 0 | 22 |
| BUILDING NO 2 | NA | 5 | 4 | 41 | 0 | 41 |
| BUILDING NO 3 | NA | 5 | 4 | 44 | 0 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 90%.
BUILDING NO 163%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 263%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 363%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DAMODAR PILAJI PATIL | Tembhi Khodave | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 1 | NA | Rs 76.38 lakh | Rs 57.28 lakh |
| BUILDING NO 2 | NA | Rs 76.38 lakh | Rs 57.28 lakh |
| BUILDING NO 3 | NA | Rs 76.38 lakh | Rs 57.28 lakh |
| - | NA | Rs 15.00 lakh | Rs 13.50 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SARC ARCHITECTURE AND PLANNING |
| Engineer | CENTRE LINE CONSULTANTS ENGINEERS |
| Chartered Accountant | NEHALI & CO |
| Partner | Role in project |
|---|---|
| ACRES DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir/Madam. We are writing to formally request an extension of the completion timeline for the above-mentioned project due to certain unavoidable circumstances that have impacted the project's progress. Despite our best efforts to adhere to the initial schedule, the following challenges have caused delays: Phase-Wise Construction and Sequential Completion Strategy: As part of our phase-wise construction plan, priority was given to the completion of Building Nos. 2 and 3. for which we successfully obtained the Occupancy Certificate (O.C.). Construction of Building No. 1 (Wings A and B)
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Dec 2024
Documents filed53
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect form 1.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Form 1-1.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Sep 25.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Form 2-1.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: C A FORM 3.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Sep 25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Sep 25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: Signed CA Certificate kelve -silver green June 25.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: Signed CA Certificate kelve-silver green Sept 25.pdf | 19 Jun 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 14 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 14 May 2025 |
| Declaration in FORM BFile: form B final.pdf | 5 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 5 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 5 Apr 2025 |
| Declaration in FORM BFile: form B 500 rupees.pdf | 28 Mar 2025 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 20 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 20 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 july to sep 24.pdf | 4 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A 19-20.pdf | 4 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 20-21.pdf | 4 Jan 2025 |
| Declaration about Commencement CertificateFile: CC declaration.pdf | 4 Jan 2025 |
| CERSAI detailsFile: cersai.pdf | 4 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC PART.pdf | 5 Dec 2024 |
| Declaration about Commencement CertificateFile: CC declaration.pdf | 5 Dec 2024 |
| CERSAI detailsFile: Cersai declaration.pdf | 5 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 27 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Updated Architect Certificate.pdf | 27 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Updated Engineer Cerificate Awhad.pdf | 27 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Updated Engineering Certificate ARM.pdf | 27 Mar 2018 |
| Certificates of CA (Form 3)File: Updated CA Certificate.pdf | 27 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COMENCEMENTS-CERTIFICATE-1-4.pdf | 24 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COMENCEMENTS-CERTIFICATE-5-9.pdf | 24 Mar 2018 |
| Building plan approvalFile: BUILDING LAYOUT 1.pdf | 29 Jul 2017 |
| Building plan approvalFile: BUILDING LAYOUT 2.pdf | 29 Jul 2017 |
| Layout approvalFile: LAYOUT.pdf | 29 Jul 2017 |
| PAN CardFile: pan.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Report.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: NO ENCUMBERANCE.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: BUILDING LAYOUT 1.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: BUILDING LAYOUT 2.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: DECLARATION B.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: DECLARATION FOR NO SALE AGREEMENT.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 53 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SILVER GREEN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bandate3,200+ in Palghar
Filed coordinates, straight-line distance. 11 registered projects within 2 km.
BLOSSOM AVENUE
DILIPKUMAR AMBALAL JAIN
RAJLAXXMI PARK
SAPHALE LAND DEVELOPERS LLP
STAR VIRATHAN CITY
STAR BUILDERS & DEVELOPERS
VIDHATA EMPIRE
K.M.WORLD
MITHILA COMPLEX
NAVAL RAMBAHADUR SINGH
PARIVAR COMPLEX BUILDING NO 1 AND 3
PARIVAR HOMES
See every Palghar project, with the district possession charts
Builder: ACRES DEVELOPERS
ACRES DEVELOPERS has 4 registrations on MahaRERA, including SILVER GREEN and ACRES ESPACER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SILVER GREEN is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SILVER GREEN?
The registered promoter entity is ACRES DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SILVER GREEN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SILVER GREEN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SILVER GREEN?
The professionals named in the filing: Architect: SARC ARCHITECTURE AND PLANNING; Engineer: CENTRE LINE CONSULTANTS ENGINEERS; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SILVER GREEN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback