Home / Browse projects / Palghar, Maharashtra / Signature Residency
Signature Residency
RG-MH-24165 · RERA P99000006550 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 34 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Signature Residency is a Others project by MUNIR ABDULLATIF GAZI in Palghar, Maharashtra, registered with MahaRERA as P99000006550 on 14 Aug 2017. Possession is promised by 30 Dec 2028. 34 complaints are on record with the regulator.
At a glance
Project
- NameSignature Residency
- TypeOthers
- Location
- Kambalgaon
- Boisar
- Palghar
- 401501
- Pincode401501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000006550
- ReraGenie IDRG-MH-24165
Builder
- NameMUNIR ABDULLATIF GAZI
- Entity typeIndividual
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Aug 2017
- Promised completion30 Dec 2028
- Revised completionNone
- Buildings20 building records
- Documents filed75 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 1 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 2 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 3 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 4 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 5 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 6 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 7 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 8 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 9 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 10 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 11 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 12 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 13 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 14 | NA | 4 | 0 | 0 | 0 | 0 |
| Building No 15 | NA | 0 | 0 | 0 | 0 | 0 |
| Building No 34 | NA | 0 | 0 | 0 | 0 | 0 |
| Building No 35 | NA | 0 | 0 | 0 | 0 | 0 |
| Building No 36 | NA | 0 | 0 | 0 | 0 | 0 |
| Building No 37 | NA | 0 | 0 | 0 | 0 | 0 |
| Building No 38 | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
45 of 220 construction stages are filed complete across 20 buildings. The stage furthest along is Basement (if any), at 90%.
Building No 125%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 235%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 67% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 344%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 436%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 536%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 625%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 741%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 843%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 943%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 1043%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 1143%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 1243%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 1335%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 1437%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 150%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 340%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 350%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 360%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 370%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 380%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 10% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 20% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 5% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ketan Gopal Sawant |
| Engineer | Jai Shree Krishna Consulting Engineer |
| Engineer | ShilpLekha Associates |
| Chartered Accountant | CA Archit Patel |
| Partner | Role in project |
|---|---|
| MUNIR ABDULLATIF GAZI | - |
Complaints filed with MahaRERA34
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000197674 | Shweta Ajay Barve | Goldstar Realtors | 29/07/2021 |
| CC006000000054608 | VISHALPRAKASH MUTREJA | Goldstar Realtors | 23/05/2018 |
| CC006000000056461 | Ajay Mitairam Maurya | Goldstar Realtors | 05/10/2018 |
| CC006000000055255 | Dr Munir A Gazi | Goldstar Realtors | 04/07/2018 |
| CC006000000055389 | Abbasi Ibrahimbhai Jhabuawala | Goldstar Realtors | 15/07/2018 |
| CC006000000055405 | Khadija Muffaddal Dohadwala | Goldstar Realtors | 16/07/2018 |
| CC006000000055574 | Shivkumar Gupta | Goldstar Realtors | 26/06/2021 |
| CC006000000057121 | FATEMA MURTUZA MOOKHTIAR | GOLDSTAR REALTORS | 30/11/2018 |
| CC006000000057123 | MUMTAZ HASANABBAS BALSANIA | GOLDSTAR REALTORS | 30/11/2018 |
| CC006000000078616 | manjula h gala | Prakash rakilal masalia | 26/11/2019 |
| CC006000000195867 | Sachit Jain | Goldstar Realtors | 04/03/2021 |
| CC006000000196876 | ATISH PRABHAKAR JADKAR | M/s Goldstar Realtors | 29/05/2021 |
| CC006000000197387 | REUBEN GUNASEELAN CHARLES | Goldstar Realtors | 24/06/2021 |
| CC006000000197217 | Gopal Dukhran Singh | Goldstar Realtors | 15/06/2021 |
| CC006000000197251 | UMESH YASHWANT SAWANT | Goldstar Relators | 28/07/2021 |
| CC006000000197430 | SANGEET KUMAR SINGH | Goldstar Realtors | 10/07/2021 |
| CC006000000197274 | Surendra Mithiram Yadav | Goldstar Realtors | 15/06/2021 |
| CC006000000197309 | Monali Nitesh Shetty | Goldstar Realtors | 18/06/2021 |
| CC006000000197376 | MR GAURAV PRADEEP BARVE | M/S GOLDSTAR REALTORS | 23/06/2021 |
| CC006000000197378 | SATISH VIJAYAN NAIR | GOLDSTAR REALTORS | 22/06/2021 |
| CC006000000197381 | Satish Vijayan Nair | Goldstar Realtors | 22/06/2021 |
| CC006000000197389 | GIRISHKUMAR VISHWAKARMA | Goldstar Realtors | 24/06/2021 |
| CC006000000197397 | Ashish Kumar Sharma | Amit Masalia | 24/06/2021 |
| CC006000000197726 | Anita Sanjeev Sawant | Goldstar Realtors | 28/07/2021 |
| CC006000000197807 | Dnyanesh Anil Rao Mudholkar | Goldstar Realtor | 04/08/2021 |
| CC006000000197975 | Aditi Rajesh Gadgil | Goldstar Realtor | 13/08/2021 |
| CC006000000198205 | Asad Shafiq Nurie | Goldstar Realtor | 16/09/2021 |
| CC006000000198338 | Amit Balvantrai Mehta | Goldstar Realtor | 19/09/2021 |
| CC006000000198365 | Amit Balvantrai Mehta | Goldstar Realtor | 19/09/2021 |
| CC006000000198406 | SANJAY MADHUKAR BORKAR | Goldstar Realtor | 21/09/2021 |
| CC006000000198408 | KALYANI CAPADIA | Goldstar Realtor | 21/09/2021 |
| CC006000000198421 | BIJENDRA KUMAR SINGH | Goldstar Realtor | 23/09/2021 |
| CC006000000209950 | Vishal Mutreja | Gold Star Realtors | 08/02/2022 |
| CC006000000396728 | Association of Allottees of Luxury Empire Township (Signature Residency) | Asset Reconstruction Company (India) Limited | 18/07/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2028
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form1.pdf | 13 Jul 2026 |
| Form 2File: Form2.pdf | 13 Jul 2026 |
| Form 3File: form3.pdf | 13 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold.pdf | 13 Jul 2026 |
| Form 1File: Form 1 - Rera Certificates Signed.pdf | 6 May 2026 |
| Form 2File: Form 2 - Rera Certificates Signed.pdf | 6 May 2026 |
| Form 3File: Form 3 CA With Annex 31032026 Signed.pdf | 6 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 31-03-2026.pdf | 6 May 2026 |
| Form 1File: Form 1 Dec2025.pdf | 19 Jan 2026 |
| Form 3File: Form 3 Dec 2025.pdf | 19 Jan 2026 |
| Form 2File: FORM 2.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of SOld Unsold.pdf | 19 Jan 2026 |
| Form 1File: Form 1 30092025.pdf | 27 Nov 2025 |
| Form 2File: Form 2 30092025.pdf | 27 Nov 2025 |
| Form 3File: Form 3 with Annexure 30092025.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of SOld & Unsold.pdf | 27 Nov 2025 |
| Form 1File: Form 1 30062025.pdf | 27 Nov 2025 |
| Form 2File: Form - 2.pdf | 27 Nov 2025 |
| Form 3File: Form - 3 wi.pdf | 27 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of SOld & Unsold.pdf | 27 Nov 2025 |
| Form 1File: 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 24 May 2025 |
| Form 2File: 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 24 May 2025 |
| Form 3File: 9 Certificates of CA (Form 3).pdf | 24 May 2025 |
| Form 1File: 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 24 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 Annexure Dr Gazi (1).pdf | 24 May 2025 |
| Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 24 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2023.pdf | 20 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2.pdf | 20 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2024.pdf | 20 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 3.pdf | 20 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: 1.pdf | 20 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 (Dec 22 to March 25).pdf | 17 May 2025 |
| Certificates of CA (Form 3)File: 1-16_11zon.pdf | 17 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 17 May 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 9 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2_11zon.pdf | 9 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1.pdf | 8 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Details -_11zon.pdf | 8 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Annexure signed.pdf | 27 Jun 2024 |
| Certificates of CA (Form 3)File: SR Form - 3 Ann compressed.pdf | 27 Jun 2024 |
| Certificates of CA (Form 3)File: Signed Form 3 With Annexure-1-12.pdf | 20 May 2024 |
| Certificates of CA (Form 3)File: Signed Form 3 With Annexure-13-23-1-5.pdf | 20 May 2024 |
| Certificates of CA (Form 3)File: Signed Form 3 With Annexure-13-23-6-11.pdf | 20 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jan24Architecture Certificate .pdf | 17 May 2024 |
| CERSAI detailsFile: 1CERSAI_Search_Report_Transaction_Id_Based_Search_08_01_2024_12_53_30_736.pdf | 17 May 2024 |
| CERSAI detailsFile: 2CERSAI.pdf | 17 May 2024 |
| CERSAI detailsFile: 3CERSAI_Search_Report_Transaction_Id_Based_Search_08_01_2024_12_53_12_473.pdf | 17 May 2024 |
| CERSAI detailsFile: 4CERSAI_Search_Report_Transaction_Id_Based_Search_08_01_2024_12_52_32_518.pdf | 17 May 2024 |
| Layout approvalFile: Approved Plan 2020.pdf | 8 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Approved Plan 2020.pdf | 8 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC_compressed.pdf | 8 Feb 2024 |
| Certificates of CA (Form 3)File: Updated Form 3.pdf | 22 Feb 2023 |
| Declaration in FORM BFile: Form B.pdf | 14 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 14 Feb 2023 |
| Layout approvalFile: Highlighted layout plan.pdf | 13 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Highlighted layout plan.pdf | 13 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 13 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 13 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 13 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 13 Feb 2023 |
| Layout approvalFile: Layout 45.pdf | 30 Jul 2017 |
| Layout approvalFile: Proposed But Not Sanctioned Layout.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout 45.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Proposed But Not Sanctioned Layout.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf | 30 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Declaration E II.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: Declaration II.pdf | 30 Jul 2017 |
| OtherFile: Declaration from builder i.pdf | 30 Jul 2017 |
| Building plan approvalFile: 45 CC.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: encumbrances certificate phase ii.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: 45 CC.pdf | 29 Jul 2017 |
| PAN CardFile: GSR PAN CARD.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Legal Report 45 46 47 53.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: Form B 45.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: Goldstar Realtors no 45 46 47 53.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Signature Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Boisar3,200+ in Palghar
Filed coordinates, straight-line distance. 55 registered projects within 2 km.
Birla Mrida
Birla Estates Private Limited
Roop Rajat Park Phase 3
MAHAVIR ASSOCIATES
AGAMI INFINITY PARK
MAYURESH REALTY PRIVATE LIMITED
Luxury Empire Township Phase I
VEENAA DEVELOPERS PRIVATE LIMITED
MAHAVIR ARCADE
MAHAVIR DEVELOPERS AND REALTORS
SHANTI VISTA - II
SHAH REALTY CORPORATION
See every Palghar project, with the district possession charts
Builder: MUNIR ABDULLATIF GAZI
MUNIR ABDULLATIF GAZI has 2 registrations on MahaRERA, including Signature Residency and Luxury Empire Township Phase III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Signature Residency is delayed beyond 30 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Signature Residency?
The registered promoter entity is MUNIR ABDULLATIF GAZI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Signature Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Signature Residency?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Signature Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Signature Residency?
The professionals named in the filing: Architect: Ketan Gopal Sawant; Engineer: Jai Shree Krishna Consulting Engineer; Engineer: ShilpLekha Associates; Chartered Accountant: CA Archit Patel. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Signature Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback