SIDDHIVINAYAK SPARSH

By AJAY ANANTA PATIL

RG-MH-06314 · RERA P52000052949 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Stilt Floor, 80%
35 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

SIDDHIVINAYAK SPARSH is a Others project by AJAY ANANTA PATIL in Raigarh, Maharashtra, registered with MahaRERA as P52000052949 on 5 Oct 2023. Possession is promised by 31 Mar 2027. 14 of the 49 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSIDDHIVINAYAK SPARSH
  • TypeOthers
  • Location
    • PLOT NO 80 SECTOR 8
    • PUSHPAK NAGAR
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052949
  • ReraGenie IDRG-MH-06314

Builder

  • NameAJAY ANANTA PATIL
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects11 →

Key dates

this monthRegisteredOct 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Current status

29%14 of 49 units booked
82.9%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHIVINAYAK SPARSHNA8841849

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

SIDDHIVINAYAK SPARSH: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes10%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered5
Open Space11

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area910 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2025
LandownerVillageDistrict
ANJANA RAM PATILKaranjadeRaigarh
GULAB KRISHNA PATILKaranjadeRaigarh
JANAKI NILKANTH GHARATKaranjadeRaigarh
MADHUKAR DHANAJI BHOIRKaranjadeRaigarh
MANJULA BARIKNATH MHATREKaranjadeRaigarh
NARMADA DHANAJI BHOIRKaranjadeRaigarh
VINOD DHANAJI BHOIRKaranjadeRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI2198.31
Proposed, not sanctioned2,198 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW PANVEL
Estimated costRs 5.87 cr
Cost incurredRs 4.87 cr
Work done82.92%
BuildingWingEstimatedIncurred
SIDDHIVINAYAK SPARSHNARs 5.78 crRs 4.80 cr
-NARs 9.00 lakhRs 7.02 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL ARCHITECTS
EngineerVIJAY KUMAR SINGH
EngineerRAJANIKANT VIJAY NARAYAN CHAUBEY
Chartered AccountantG S DESAI AND ASSOCIATES
PartnerRole in project
AJAY ANANTA PATIL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf17 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf17 Jun 2026
Withdrawal Update Form 3File: FORM 3 SIGNED.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf17 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf17 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf17 Feb 2026
Withdrawal Update Form 1File: PL 89 SEC R4 FORM 2 30 06 25 SUNDRAI NIWAS.pdf24 Nov 2025
Withdrawal Update Form 1File: Form 1 Sept 25.pdf24 Nov 2025
Withdrawal Update Form 2File: PL 89 SEC R4 FORM 2 30 06 25 SUNDRAI NIWAS.pdf24 Nov 2025
Withdrawal Update Form 2File: Form 2 Sept 25.pdf24 Nov 2025
Withdrawal Update Form 3File: FORM 3 Q 1 SIDDHIVINAYAK SPARSH PLOT NO 08 80.pdf24 Nov 2025
Withdrawal Update Form 3File: FORM 3 Q 2 SIDDHIVINAYAK SPARSH PLOT NO 08 80.pdf24 Nov 2025
Form 1File: 08-80 form-1.pdf23 Jul 2025
Form 2File: 08-80 form-2.pdf23 Jul 2025
Form 3File: FORM-3.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 08-80 sold-unsold inventory.pdf23 Jul 2025
Form 1File: Form-1 sec-08 plot no-80.pdf11 Jul 2025
Form 2File: form-2 sec-08 plot no-80 15-10-2024.pdf11 Jul 2025
Form 3File: PLOT 80 SEC 08 FORM 3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY SEC 08-80 Q2.pdf11 Jul 2025
Form 1File: FORM NO 1.pdf11 Jul 2025
Form 2File: 80-08-FORM 2-DEC 24.pdf11 Jul 2025
Form 3File: FORM NO-3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: 08-80-SOLD INVENTORY-DEC 24.pdf11 Jul 2025
Form 1File: 80-8-PUSHPAK RERA FORM 1 -MARCH 24.pdf11 Jul 2025
Form 2File: FORM - 2 PLOT NO 8-80.pdf11 Jul 2025
Form 3File: SEC-08 PLOT NO-80 SIDDHIVINAYAK SPARSH FORM 3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sec-08 Plot No-80 SOLD INVENTORY.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08-80 form-1.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 08-80 form-2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: 08-80 sold-unsold inventory.pdf21 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 08-80 form-2A.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO-3.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 80-08-FORM 1-DEC 24.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 80-08-FORM 2-DEC 24.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: 08-80-SOLD INVENTORY-DEC 24.pdf11 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Siddhivinayak Sparsh Form 5.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Siddhivinayak Sparsh Form 5.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PLOT 80 SEC 08 FORM 3.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 sec-08 plot no-80.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 sec-08 plot no-80 15-10-2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEC-08 PLOT NO-80 SIDDHIVINAYAK SPARSH FORM 3.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEC 08-80 Q2.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- SEC 08-80.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 80-08,form2, June 2024,.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY - 08-80.pdf25 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: sec-08 plot no-80 Form 2A.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 PLOT NO 8-80.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: Sec-08 Plot No-80.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 80-8-PUSHPAK RERA (2024 MARCH).pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 80-8-PUSHPAK RERA (2023 DECEMBER).pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PLOT NO 80-8 FORM - 2.pdf21 Feb 2024
Disclosure of sold/ booked inventoryFile: SIDDHIVINAYAK SPARSH.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sec-08 PLOT NO-80 FORM 3 SIDDHIVINAYAK SPARSH.pdf21 Feb 2024
Declaration about Commencement CertificateFile: rera letter 8-80.pdf8 Sep 2023
Other - TechnicalFile: ATUL PATEL ARCHITECTS Mail - Development permission_CC granted on Plot No 80, Sector 08 at8 Sep 2023
Other - LegalFile: Lease agreement-08-80-(01).pdf22 Aug 2023
Other - LegalFile: Lease agreement-08-80-(02).pdf22 Aug 2023
Other - LegalFile: MOU -08-80.pdf22 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMATE A.pdf10 Aug 2023
Declaration in FORM BFile: AJAY DIRECTOR.pdf7 Aug 2023
Proforma of Agreement for saleFile: NEW AGREEMENT.pdf7 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annaxture A.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 siddhivinayak sparsh.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 SIDDHIVINAYAK SPARSH SEC-08 PLOT NO-80.pdf21 Jul 2023
Copy of the legal title reportFile: TITLE SEARCH -08-80 SIDDHIVINAYAK SPARSH.pdf18 Jul 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE.pdf18 Jul 2023
Details of encumbrances concerned to FinanceFile: LEGAL AND LITIGATION.pdf18 Jul 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE.pdf18 Jul 2023
Details of encumbrances concerned to LegalFile: LEGAL AND LITIGATION.pdf18 Jul 2023
CERSAI detailsFile: DECLARATION ABOUT CERSAI.pdf18 Jul 2023
Proforma of Allotment letterFile: MODEL LETTER OF ALLOTMENT.pdf18 Jul 2023
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER.pdf18 Jul 2023
Deviation Report with respect to model copy of AgreementFile: MODEL OF COPY AGREEMENT.pdf18 Jul 2023
Other - LegalFile: Tripartite Agreement 8 80 1.pdf18 Jul 2023
Other - LegalFile: Tripartite Agreement 8 80 2.pdf18 Jul 2023
Other - LegalFile: Tripartite Agreement 8 80 3.pdf18 Jul 2023
Layout approvalFile: 80-DRG DRAWING-1.pdf12 Jul 2023
Layout approvalFile: 80-DRG DRAWING-2.pdf12 Jul 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
JANAI COMPLEXPlot No 224 at Vadghar Panvel Raigarh 41020638CompletedNov 2023Jan 2023
ANANTA COMPLEXPlot No 225 at Karanjade Panvel Raigarh 41020618CompletedAug 2022Jul 2022

How this compares with Raigarh

29%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHIVINAYAK SPARSH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK NAGAR5,900+ in Raigarh

2 kmSIDDHIVINAYAK SPARSHCompleted 208Lapsed / revoked 54Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 356 registered projects within 2 km.

Builder: AJAY ANANTA PATIL

Ajay Ananta Patil has 4 registrations on MahaRERA, including Janai Complex and SIDDHIVINAYAK SPARSH. Its filings disclose 11 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SIDDHIVINAYAK SPARSH is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHIVINAYAK SPARSH?

The registered promoter entity is AJAY ANANTA PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHIVINAYAK SPARSH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIDDHIVINAYAK SPARSH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHIVINAYAK SPARSH?

The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: VIJAY KUMAR SINGH; Engineer: RAJANIKANT VIJAY NARAYAN CHAUBEY; Chartered Accountant: G S DESAI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHIVINAYAK SPARSH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHIVINAYAK SPARSH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHIVINAYAK SPARSH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.