Home / Browse projects / Raigarh, Maharashtra / SIDDHIVINAYAK SANKALP
SIDDHIVINAYAK SANKALP
RG-MH-05967 · RERA P52000052663 · Last updated on MahaRERA portal: 18 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 18.60 crore secured on the land, in favour of DCB BANK LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHIVINAYAK SANKALP is a Residential / Group Housing project by YASHODEEP BUILDCON in Raigarh, Maharashtra, registered with MahaRERA as P52000052663 on 15 Sep 2023. Possession is promised by 31 Dec 2027. 167 of the 251 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.
At a glance
Project
- NameSIDDHIVINAYAK SANKALP
- TypeResidential / Group Housing
- Location
- SURVEY NO 32 HISSA NO 11
- KOYNAVELE
- Koyana Velhe
- Panvel
- Raigarh
- 410208
- Pincode410208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000052663
- ReraGenie IDRG-MH-05967
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Sep 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed78 files
Current status
Figures as on 18 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 16 | 15 | 118 | 0 | 118 |
| WING B | NA | 16 | 15 | 133 | 0 | 133 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 80%.
WING A58%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
WING B59%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 30% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 1 | 1 |
| WING B | 1 | 1 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 24.00 cr | Rs 15.16 cr |
| WING B | NA | Rs 24.00 cr | Rs 15.16 cr |
| - | NA | Rs 24.00 cr | Rs 15.16 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Neha Jain |
| Architect | AN ARCH ARCHITECTS AND PLANNER |
| Engineer | NILESH KUMAR |
| Engineer | JEET SHAH |
| Chartered Accountant | RASHMIKESH PANIGRAHI |
| Chartered Accountant | SUDHIR PATEL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| YASHODEEP BUILDCON | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE SANKALP 31-03-2026.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: Form -2 ENGINEERS CERTIFICATE-SANKALP.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Sankalp March 2026.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: AR SANKALP DEC-25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: AR SANKALP DEC-25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: ENG SANKALP DEC-25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: ENG SANKALP DEC-25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: CA SANKALP DEC-25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: CA SANKALP DEC-25.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1 SANKALP SEP-25.pdf | 31 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2 SANKALP SEP-25.pdf | 31 Oct 2025 |
| Withdrawal Update Form 3File: FORM-3 SANKALP SEP-25.pdf | 31 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM-2A SANKALP.pdf | 30 Jul 2025 |
| Form 1File: FORM 1 SANKALP JUNE-25.pdf | 18 Jul 2025 |
| Form 2File: FORM-2 SANKALP JUNE-25.pdf | 18 Jul 2025 |
| Form 3File: FORM-3 SANKALP JUNE-25.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SANKALP JUNE-25.pdf | 18 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SANKALP_ARCHITECT CERTIFICATE.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SANKALP001.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG SANKALP001.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SANKALP001.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: SANKALP INVENTORY DEC24.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SANKALP FORM 1 DEC24.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SANKALP DEC24.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG SANKALP DEC24.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SANKALP AR SEP 24.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SANKALP CA SEP 2024.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SANKALP ENG SEP24.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SANKALP SOLD UNSOLD SEP-24.pdf | 28 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SANKALP YB FORM -5 52663.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SANKALP AR 30-06-2024.pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SANKALP ENG 30-06-2024.pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: SANKALP SOLD UNSOLD 30-06-2024.pdf | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SANKALP CA 30-06-2024.pdf | 8 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SANKALP AR MAR 24001.pdf | 27 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SANKALP ENG MAR 24001.pdf | 27 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SANKALP INVENTORY MAR 24 BW.pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sankalp ca 31 MAR 24_BW.pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SANKALP 31-12-2023.pdf | 22 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SANKALP DEC23.pdf | 24 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR SANKALP 26-12-2023.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG SANKALP 31-12-2023.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SANKALP 31-12-2023 1.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD SANKALP SEP 23_compressed.pdf | 30 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: MORTGAGE DEED INDEX- 2 SIDDHIVINAYAK SANKALP YASHODEEP BUILDCON TO DCB BANK - SURVEY NO 32 | 13 Dec 2023 |
| Details of encumbrances concerned to LegalFile: MORTGAGE DEED INDEX- 2 SIDDHIVINAYAK SANKALP YASHODEEP BUILDCON TO DCB BANK - SURVEY NO 32 | 13 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE SANKALP 3092023.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE SANKALP 3092023.pdf | 18 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SANKALP 3092023.pdf | 18 Oct 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE_New.pdf | 29 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances finance New.pdf | 17 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances legal New.pdf | 17 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances finance New.pdf | 17 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances legal New.pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sankalp New.pdf | 17 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: new disclosure.pdf | 17 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank Account New.pdf | 17 Jul 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT- SANKALP.pdf | 12 Jul 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 12 Jul 2023 |
| PAN CardFile: Yashodeep_PAN.pdf | 6 Jul 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200273636496_For_Asset_Based_Search_06_07_2023_15_45_53_188.pdf | 6 Jul 2023 |
| Proforma of Allotment letterFile: allotment.pdf | 6 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: Allotment_Deviation.pdf | 6 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: Agreement_Deviation.pdf | 6 Jul 2023 |
| Layout approvalFile: Scan-0158.pdf | 5 Jul 2023 |
| Building plan approvalFile: Scan-0159.pdf | 5 Jul 2023 |
| Building plan approvalFile: Scan-0160.pdf | 5 Jul 2023 |
| Building plan approvalFile: Scan-0161.pdf | 5 Jul 2023 |
| Building plan approvalFile: Scan-0162.pdf | 5 Jul 2023 |
| Building plan approvalFile: Scan-0163.pdf | 5 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: Scan-0158.pdf | 5 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0159.pdf | 5 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0160.pdf | 5 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0161.pdf | 5 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0162.pdf | 5 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0163.pdf | 5 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates NA Order for plotted development-SANKALP 1MB.pdf | 5 Jul 2023 |
| Declaration in FORM BFile: DECLARATION FORM-B -SIDDHIVINAYAK SANKALP 1 MB.pdf | 5 Jul 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SIDDHIVINAYAK GARIMA | KOYNAVELE | 236 | Completed | Dec 2018 | Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SIDDHIVINAYAK SANKALP on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KOYNAVELE5,900+ in Raigarh
Filed coordinates, straight-line distance. 157 registered projects within 2 km.
Plot No -1 Sector -29 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No.-1 Sector -39 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -1 Sector -31 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
SAI SUNCITY PHASE II
Chariot Properties LLP
Plot No. 14 Sector-37 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
ARIHANT ADARSH PHASE I
ARIHANT SUPERSTRUCTURES LIMITED
See every Raigarh project, with the district possession charts
Builder: YASHODEEP BUILDCON
YASHODEEP BUILDCON has 3 registrations on MahaRERA, including NIVANTA and SIDDHIVINAYAK DARSHAN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SIDDHIVINAYAK SANKALP is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHIVINAYAK SANKALP?
The registered promoter entity is YASHODEEP BUILDCON, a partnership as per the filing. Its GSTIN 27AACFY4165G1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHIVINAYAK SANKALP?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIDDHIVINAYAK SANKALP?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHIVINAYAK SANKALP?
The professionals named in the filing: Architect: Neha Jain; Architect: AN ARCH ARCHITECTS AND PLANNER; Engineer: NILESH KUMAR; Engineer: JEET SHAH; Chartered Accountant: RASHMIKESH PANIGRAHI; Chartered Accountant: SUDHIR PATEL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHIVINAYAK SANKALP?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback