Home / Browse projects / Raigarh, Maharashtra / SIDDHIVINAYAK EKDANT
SIDDHIVINAYAK EKDANT
RG-MH-06589 · RERA P52000054146 · Last updated on MahaRERA portal: 19 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIDDHIVINAYAK EKDANT is a Others project by KIRAN NARAYAN PAWAR in Raigarh, Maharashtra, registered with MahaRERA as P52000054146 on 29 Dec 2023. Possession is promised by 31 Mar 2027. 34 of the 60 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.
At a glance
Project
- NameSIDDHIVINAYAK EKDANT
- TypeOthers
- Location
- PUSHPAK
- VADGHAR
- Vadghar (CT)
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000054146
- ReraGenie IDRG-MH-06589
Builder
- NameKIRAN NARAYAN PAWAR
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Dec 2023
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings2 building records
- Documents filed84 files
Current status
Figures as on 19 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 8 | 8 | 27 | 5 | 32 |
| B WING | NA | 8 | 8 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 98%.
A WING74%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 94% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 72% |
B WING74%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 94% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 72% |
Progress on shared amenities15
As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed11
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 10 | 10 |
| B WING | 1 | 1 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| AKSHAY DNYANDEO PAWAR | Vadghar (CT) | Raigarh |
| ASHWIN DNYNDEO PAWAR | Vadghar (CT) | Raigarh |
| NARAYAN JATRYA PAWAR | Vadghar (CT) | Raigarh |
| PROMOD NARAYAN PAWAR | Vadghar (CT) | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 2.62 cr | Rs 2.49 cr |
| B WING | NA | Rs 2.62 cr | Rs 2.49 cr |
| - | NA | Rs 5.00 lakh | Rs 2.50 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL PATEL ARCHITECTS |
| Engineer | VIJAY KUMAR SINGH |
| Chartered Accountant | G S DESAI AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| KIRAN NARAYAN PAWAR | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 19 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 19 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 19 Jun 2026 |
| Withdrawal Update Form 1File: R5-24- FORM 1-DEC 25 .pdf | 17 Feb 2026 |
| Withdrawal Update Form 2File: R5-24- FORM 2-DEC 25 .pdf | 17 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 17 Feb 2026 |
| Withdrawal Update Form 1File: PL 24 SEC R5 FORM1 30 09 25 EKDANT.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: PL 24 SEC R5 FORM2 30 09 25 EKDANT.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 Q2 SIDDDHIVINAYAK EKADANT R5 24.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: PL 24 SEC R5 FORM1 30 06 2025.pdf | 20 Nov 2025 |
| Withdrawal Update Form 2File: PL 24 SEC R5 FORM2 30 06 2025.pdf | 20 Nov 2025 |
| Withdrawal Update Form 3File: R5-24 ISHITA ENTERPRISES FORM-3 (1).pdf | 20 Nov 2025 |
| Form 1File: FORM-1.pdf | 10 Jul 2025 |
| Form 2File: FORM-2.pdf | 10 Jul 2025 |
| Form 3File: FORM 3 R5-24 ISHITA ENT.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY - 24 -R5.pdf | 10 Jul 2025 |
| Form 1File: FORM 1 ISHITA.pdf | 10 Jul 2025 |
| Form 2File: form 2 (1).pdf | 10 Jul 2025 |
| Form 3File: R5-24 Form-3.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: plot no 24 flat inventory.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 R5 -24.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 R5-24.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD -UNSOLD INVENTORY.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: sold - unsold inventor 24-R5.pdf | 21 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A R5-24.pdf | 21 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A R5-24.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5-24 Form-3.pdf | 10 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ISHITA.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (1).pdf | 15 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: plot no 24 flat inventory.pdf | 15 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Siddhivinayak Ekdant Form 5.pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SACHIN SURESH DHUMAL -PLOT NO 89.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SACHIN SURESH DHUMAL -PLOT NO 89.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ISHITA ENTERPRISES -PLOT NO 24.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ISHITA ENTERPRISES -PLOT NO 24.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 R5-24 ISHITA ENT.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEP.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24-R5-PUSHPAK RERA FORM NO 1.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R5-24 FORM-2 16-07-2024 SIDDHIVINAYAK EKDANT.pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: R5-24 DISCLOSURE OF SOLD.pdf | 25 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 A plot no 247 EKDANT.pdf | 10 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 4 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY - 24 -R5.pdf | 30 Apr 2024 |
| Layout approvalFile: 24-R5-PUSHPAK-CC.pdf | 28 Mar 2024 |
| Layout approvalFile: 24-R5-PUSHPAK- CC DGR.pdf | 28 Mar 2024 |
| Building plan approvalFile: 24-R5-PUSHPAK- CC DGR.pdf | 28 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 24-R5-PUSHPAK-CC.pdf | 28 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 24-R5-PUSHPAK- CC DGR.pdf | 28 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 24-R5-PUSHPAK- CC DGR.pdf | 28 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 24-R5-PUSHPAK-CC.pdf | 28 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 28 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 28 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold in inventory.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5-24 ISHITA ENTERPRISES FORM-3 (1).pdf | 28 Mar 2024 |
| Other - LegalFile: format c.pdf | 28 Mar 2024 |
| Proforma of Agreement for saleFile: R5-PLOT NO 24 AGREEMENT FOR SALE.pdf | 22 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVAITION REPORT.pdf | 22 Dec 2023 |
| Copy of the legal title reportFile: R5-24 SIDDHIVINAYAK EKDANT FORMAT -A.pdf | 20 Nov 2023 |
| Other - LegalFile: 1 R5 24 Lease Agreement.pdf | 26 Oct 2023 |
| Other - LegalFile: 2 R5 24 Lease Agreement.pdf | 26 Oct 2023 |
| Other - LegalFile: 3 R5 24 Lease Agreement.pdf | 26 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R5-24 FORM-2.pdf | 13 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 R5-24.pdf | 12 Sep 2023 |
| Other - LegalFile: R5-24 agreement authorizing promoter for project maharera.pdf | 7 Sep 2023 |
| Proforma of Allotment letterFile: MODEL FROM OF ALLOTMENT LETTER.pdf | 2 Sep 2023 |
| Layout approvalFile: 24-R5 CC DRAWING_compressed_compressed_11zon.pdf | 29 Aug 2023 |
| Building plan approvalFile: 24-R5 CC DRAWING_compressed_compressed_11zon.pdf | 29 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 24-R5 CC DRAWING_compressed_compressed_11zon.pdf | 29 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 24-R5 CC DRAWING_compressed_compressed_11zon.pdf | 29 Aug 2023 |
| Declaration in FORM BFile: KIRAN NARAYAN PAWAR.pdf | 29 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 29 Aug 2023 |
| PAN CardFile: PAN.pdf | 26 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: LEGAL AND LITIGATION ENCUMBRANCE CERTIFICATE.pdf | 26 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE DECLARATION RELATED TO FINANCE.pdf | 26 Aug 2023 |
| Details of encumbrances concerned to LegalFile: LEGAL AND LITIGATION ENCUMBRANCE CERTIFICATE.pdf | 26 Aug 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION RELATED TO FINANCE.pdf | 26 Aug 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 26 Aug 2023 |
| CERSAI detailsFile: DECLARATION ABOUT CERSAI DETAIL.pdf | 26 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SIDDHIVINAYAK EKDANT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VADGHAR5,900+ in Raigarh
Filed coordinates, straight-line distance. 290 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: KIRAN NARAYAN PAWAR
KIRAN NARAYAN PAWAR has 1 registration on MahaRERA, including SIDDHIVINAYAK EKDANT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SIDDHIVINAYAK EKDANT is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIDDHIVINAYAK EKDANT?
The registered promoter entity is KIRAN NARAYAN PAWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIDDHIVINAYAK EKDANT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIDDHIVINAYAK EKDANT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIDDHIVINAYAK EKDANT?
The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: VIJAY KUMAR SINGH; Chartered Accountant: G S DESAI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDDHIVINAYAK EKDANT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback