Home / Browse projects / Raigarh, Maharashtra / SIDDHIVINAYAK EKDANT

Registered No litigation declared Others project

SIDDHIVINAYAK EKDANT

By KIRAN NARAYAN PAWAR

RG-MH-06589 · RERA P52000054146 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 98%
26 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

SIDDHIVINAYAK EKDANT is a Others project by KIRAN NARAYAN PAWAR in Raigarh, Maharashtra, registered with MahaRERA as P52000054146 on 29 Dec 2023. Possession is promised by 31 Mar 2027. 34 of the 60 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameSIDDHIVINAYAK EKDANT
  • TypeOthers
  • Location
    • PUSHPAK
    • VADGHAR
    • Vadghar (CT)
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000054146
  • ReraGenie IDRG-MH-06589

Builder

  • NameKIRAN NARAYAN PAWAR
  • Entity typeIndividual

Key dates

this monthRegisteredDec 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Dec 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed84 files

Current status

57%34 of 60 units booked
94.6%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA8827532
B WINGNA8828028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 98%.

A WING74%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.72%
B WING74%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.72%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered11
BuildingClosed/CoveredTotal
A WING1010
B WING11

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area640 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jul 2025
LandownerVillageDistrict
AKSHAY DNYANDEO PAWARVadghar (CT)Raigarh
ASHWIN DNYNDEO PAWARVadghar (CT)Raigarh
NARAYAN JATRYA PAWARVadghar (CT)Raigarh
PROMOD NARAYAN PAWARVadghar (CT)Raigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI2520.48
Proposed, not sanctioned2,520 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 5 SECTOR 19 MATHERAN ROAD PANVEL
Estimated costRs 5.30 cr
Cost incurredRs 5.01 cr
Work done94.58%
BuildingWingEstimatedIncurred
A WINGNARs 2.62 crRs 2.49 cr
B WINGNARs 2.62 crRs 2.49 cr
-NARs 5.00 lakhRs 2.50 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL ARCHITECTS
EngineerVIJAY KUMAR SINGH
Chartered AccountantG S DESAI AND ASSOCIATES
PartnerRole in project
KIRAN NARAYAN PAWAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf19 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf19 Jun 2026
Withdrawal Update Form 1File: R5-24- FORM 1-DEC 25 .pdf17 Feb 2026
Withdrawal Update Form 2File: R5-24- FORM 2-DEC 25 .pdf17 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf17 Feb 2026
Withdrawal Update Form 1File: PL 24 SEC R5 FORM1 30 09 25 EKDANT.pdf4 Dec 2025
Withdrawal Update Form 2File: PL 24 SEC R5 FORM2 30 09 25 EKDANT.pdf4 Dec 2025
Withdrawal Update Form 3File: FORM 3 Q2 SIDDDHIVINAYAK EKADANT R5 24.pdf4 Dec 2025
Withdrawal Update Form 1File: PL 24 SEC R5 FORM1 30 06 2025.pdf20 Nov 2025
Withdrawal Update Form 2File: PL 24 SEC R5 FORM2 30 06 2025.pdf20 Nov 2025
Withdrawal Update Form 3File: R5-24 ISHITA ENTERPRISES FORM-3 (1).pdf20 Nov 2025
Form 1File: FORM-1.pdf10 Jul 2025
Form 2File: FORM-2.pdf10 Jul 2025
Form 3File: FORM 3 R5-24 ISHITA ENT.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY - 24 -R5.pdf10 Jul 2025
Form 1File: FORM 1 ISHITA.pdf10 Jul 2025
Form 2File: form 2 (1).pdf10 Jul 2025
Form 3File: R5-24 Form-3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: plot no 24 flat inventory.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 R5 -24.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 R5-24.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD -UNSOLD INVENTORY.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: sold - unsold inventor 24-R5.pdf21 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A R5-24.pdf21 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A R5-24.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5-24 Form-3.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ISHITA.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (1).pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: plot no 24 flat inventory.pdf15 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Siddhivinayak Ekdant Form 5.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SACHIN SURESH DHUMAL -PLOT NO 89.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SACHIN SURESH DHUMAL -PLOT NO 89.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ISHITA ENTERPRISES -PLOT NO 24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ISHITA ENTERPRISES -PLOT NO 24.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 R5-24 ISHITA ENT.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEP.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24-R5-PUSHPAK RERA FORM NO 1.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R5-24 FORM-2 16-07-2024 SIDDHIVINAYAK EKDANT.pdf26 Jul 2024
Disclosure of sold/ booked inventoryFile: R5-24 DISCLOSURE OF SOLD.pdf25 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 A plot no 247 EKDANT.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY - 24 -R5.pdf30 Apr 2024
Layout approvalFile: 24-R5-PUSHPAK-CC.pdf28 Mar 2024
Layout approvalFile: 24-R5-PUSHPAK- CC DGR.pdf28 Mar 2024
Building plan approvalFile: 24-R5-PUSHPAK- CC DGR.pdf28 Mar 2024
Copy of Layout Approval (in case of layout)File: 24-R5-PUSHPAK-CC.pdf28 Mar 2024
Copy of Layout Approval (in case of layout)File: 24-R5-PUSHPAK- CC DGR.pdf28 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 24-R5-PUSHPAK- CC DGR.pdf28 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 24-R5-PUSHPAK-CC.pdf28 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Mar 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold in inventory.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R5-24 ISHITA ENTERPRISES FORM-3 (1).pdf28 Mar 2024
Other - LegalFile: format c.pdf28 Mar 2024
Proforma of Agreement for saleFile: R5-PLOT NO 24 AGREEMENT FOR SALE.pdf22 Dec 2023
Deviation Report with respect to model copy of AgreementFile: DEVAITION REPORT.pdf22 Dec 2023
Copy of the legal title reportFile: R5-24 SIDDHIVINAYAK EKDANT FORMAT -A.pdf20 Nov 2023
Other - LegalFile: 1 R5 24 Lease Agreement.pdf26 Oct 2023
Other - LegalFile: 2 R5 24 Lease Agreement.pdf26 Oct 2023
Other - LegalFile: 3 R5 24 Lease Agreement.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R5-24 FORM-2.pdf13 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 R5-24.pdf12 Sep 2023
Other - LegalFile: R5-24 agreement authorizing promoter for project maharera.pdf7 Sep 2023
Proforma of Allotment letterFile: MODEL FROM OF ALLOTMENT LETTER.pdf2 Sep 2023
Layout approvalFile: 24-R5 CC DRAWING_compressed_compressed_11zon.pdf29 Aug 2023
Building plan approvalFile: 24-R5 CC DRAWING_compressed_compressed_11zon.pdf29 Aug 2023
Copy of Layout Approval (in case of layout)File: 24-R5 CC DRAWING_compressed_compressed_11zon.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 24-R5 CC DRAWING_compressed_compressed_11zon.pdf29 Aug 2023
Declaration in FORM BFile: KIRAN NARAYAN PAWAR.pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Aug 2023
PAN CardFile: PAN.pdf26 Aug 2023
Details of encumbrances concerned to FinanceFile: LEGAL AND LITIGATION ENCUMBRANCE CERTIFICATE.pdf26 Aug 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE DECLARATION RELATED TO FINANCE.pdf26 Aug 2023
Details of encumbrances concerned to LegalFile: LEGAL AND LITIGATION ENCUMBRANCE CERTIFICATE.pdf26 Aug 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION RELATED TO FINANCE.pdf26 Aug 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf26 Aug 2023
CERSAI detailsFile: DECLARATION ABOUT CERSAI DETAIL.pdf26 Aug 2023

How this compares with Raigarh

57%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHIVINAYAK EKDANT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VADGHAR5,900+ in Raigarh

2 kmSIDDHIVINAYAK EKDANTCompleted 133Lapsed / revoked 51Other 106Dot size: filed unitsN

Filed coordinates, straight-line distance. 290 registered projects within 2 km.

Builder: KIRAN NARAYAN PAWAR

KIRAN NARAYAN PAWAR has 1 registration on MahaRERA, including SIDDHIVINAYAK EKDANT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SIDDHIVINAYAK EKDANT is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHIVINAYAK EKDANT?

The registered promoter entity is KIRAN NARAYAN PAWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHIVINAYAK EKDANT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIDDHIVINAYAK EKDANT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHIVINAYAK EKDANT?

The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: VIJAY KUMAR SINGH; Chartered Accountant: G S DESAI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHIVINAYAK EKDANT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHIVINAYAK EKDANT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHIVINAYAK EKDANT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.