Home / Browse projects / Raigarh, Maharashtra / SIDDHIVINAYAK CORNER

Registered No litigation declared Mixed project

SIDDHIVINAYAK CORNER

By SIDDHIVINAYAK BUILDCON

RG-MH-32966 · RERA PM1270002500533 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
65 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 12 documents Report an error

SIDDHIVINAYAK CORNER is a Mixed project by SIDDHIVINAYAK BUILDCON in Raigarh, Maharashtra, registered with MahaRERA as PM1270002500533 on 11 Aug 2025. Possession is promised by 31 Mar 2029. 6 of the 71 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSIDDHIVINAYAK CORNER
  • TypeMixed
  • Location
    • SECTOR-7
    • PUSHPAK DAPOLI
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1270002500533
  • ReraGenie IDRG-MH-32966

Builder

  • NameSIDDHIVINAYAK BUILDCON
  • Entity typePartnership
  • GSTIN27AEAFS0492L1ZR
  • PartnersAJAY ANANTA PATIL, VIJAYA AJAY PATIL
  • Other registrations9 more →
  • Completed8 of 10
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2025PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2025
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed12 files

Current status

8%6 of 71 units booked
28.8%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHIVINAYAK CORNERSIDDHIVINAYAK CORNER - A88271239
SIDDHIVINAYAK CORNERSIDDHIVINAYAK CORNER - B8832032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

SIDDHIVINAYAK CORNER · wing SIDDHIVINAYAK CORNER - ANot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
SIDDHIVINAYAK CORNER · wing SIDDHIVINAYAK CORNER - BNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16

Land and ownership13

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area719 sq m
Land owned byNot the promoter
Named landowners13
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
BEBI BABAN GAIKWADPanvelRaigarh
DATTATRAY BARKU KARAVKARPanvelRaigarh
DROPADI TULSHIRAM NAIKPanvelRaigarh
JAYVANT BABU KARAVKARPanvelRaigarh
KANTA TUKARAM GAIKWADPanvelRaigarh
MOTIRAM BABU KARAVKARPanvelRaigarh
PANDURANG BABU KARAVKARPanvelRaigarh
PRAMOD TULSIRAM GAIKWADPanvelRaigarh
JAYSHREE RAJARAM GAIKWADPanvelRaigarh
SAVITA DHULYA MUKADAMPanvelRaigarh
SAVITRI PANDHARINATH PAVNEKARPanvelRaigarh
SHRAVAN RAJARAM GAIKWADPanvelRaigarh
SHRAVANI RAJARAM GAIKWADPanvelRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI2855.79
Proposed, not sanctioned2,856 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Plot No. 5, Panvel Matheran Road, Sector 19, New Panvel, Navi Mumbai.410206
Estimated costRs 7.29 cr
Cost incurredRs 2.10 cr
Work done28.81%
BuildingWingEstimatedIncurred
SIDDHIVINAYAK CORNERSIDDHIVINAYAK CORNER - ARs 3.50 crRs 1.05 cr
SIDDHIVINAYAK CORNERSIDDHIVINAYAK CORNER - BRs 3.50 crRs 1.05 cr
-NARs 29.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL
EngineerIMPACT DESIGNERR
EngineerADESH VINAYAK KEDARI
Chartered AccountantG S DESAI & ASSOCIATES
PartnerRole in project
SIDDHIVINAYAK BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jun 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed12

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf19 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf19 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf15 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf15 Jun 2026
Withdrawal Update Form 3File: sec-07 plot no-84 form-3-04-03-2026.pdf15 Jun 2026
Withdrawal Update Form 1File: PL 84 SEC 07 FORM 1 30 09 2025 CORNER.pdf17 Dec 2025
Withdrawal Update Form 2File: PL 84 SEC 07 FORM2 30 09 2025 CORNER.pdf17 Dec 2025
Withdrawal Update Form 3File: 07-84 Form-3 SIDDHIVINAYAK CORNER.pdf17 Dec 2025
Declaration and undertaking (Annexure A)File: ANNEXURE A DECLARATION - CUM- UNDERTAKING.pdf25 Jun 2025
Layout approvalFile: ACC DRG.pdf16 Jun 2025
Building plan approvalFile: ACC DRG.pdf16 Jun 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
ANANTA COMPLEXP52000028540KARANJADE, RaigarhMar 2021CompletedAug 2022Jul 2022

How this compares with Raigarh

8%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHIVINAYAK CORNER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK DAPOLI5,900+ in Raigarh

2 kmSIDDHIVINAYAK CORNERCompleted 8Lapsed / revoked 7Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 120 registered projects within 2 km.

Builder: SIDDHIVINAYAK BUILDCON

SIDDHIVINAYAK BUILDCON has 10 registrations on MahaRERA, including SAI VANDAN RESIDENCY and SIDDHIVINAYAK PLAZA. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SIDDHIVINAYAK CORNER is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHIVINAYAK CORNER?

The registered promoter entity is SIDDHIVINAYAK BUILDCON, a partnership as per the filing. Its GSTIN 27AEAFS0492L1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHIVINAYAK CORNER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIDDHIVINAYAK CORNER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHIVINAYAK CORNER?

The professionals named in the filing: Architect: ATUL PATEL; Engineer: IMPACT DESIGNERR; Engineer: ADESH VINAYAK KEDARI; Chartered Accountant: G S DESAI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHIVINAYAK CORNER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHIVINAYAK CORNER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHIVINAYAK CORNER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.