Home / Browse projects / Mumbai Suburban, Maharashtra / Siddha Seabrook

Registration lapsed No litigation declared Others project

Siddha Seabrook

By M/S Brizeal Realtors & Developers LLP

RG-MH-46421 · RERA P51800008859 · Last updated on MahaRERA portal: 14 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 12 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
12Complaints at MahaRERAon this registration
Jump to the 188 documents Report an error

Siddha Seabrook is a Others project by M/S Brizeal Realtors & Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008859 on 19 Aug 2017. Possession was promised by 29 Dec 2023 and is now 34 months past that date. The completion date has moved by 12 months from the original filing. 12 complaints are on record with the regulator.

At a glance

Project

  • NameSiddha Seabrook
  • TypeOthers
  • Location
    • Link Road
    • Kandivali (West)
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008859
  • ReraGenie IDRG-MH-46421

Builder

  • NameM/S Brizeal Realtors & Developers LLP
  • Entity typeOthers
  • Named personsAmrut Gada, Mitesh Gada, Ashish Karia, Dhirraj Gada, M/S Sejal Builders and Constructors LLP, Sanjay Jain, Samyak Jain, Siddha Real Estate Development Private Limited, Siddha Stylla Realtors LLP, Siddha Projects Private Limited

Key dates

34 months past promisethis monthRegisteredAug 2017First promiseDec 2022Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion29 Dec 2023
  • Revised completionRevised to 29 Dec 2023 (originally 30 Dec 2022)
  • Buildings3 building records
  • Documents filed188 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Siddha SeabrookNA650000
Siddha SeabrookNA650000
Siddha SeabrookNA650000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

Siddha Seabrook100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Siddha Seabrook100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Siddha Seabrook100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed666

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots666
Closed/Covered540
Open Space126
BuildingClosed/CoveredOpen SpaceTotal
Siddha Seabrook18042222
Siddha Seabrook18042222
Siddha Seabrook18042222

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,157 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI33337.31
Proposed, not sanctioned27,887 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 5 Between A and B Wing Kamala Nagar M G Road Kandivali W Mumbai - 400 067

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDOT Architects
EngineerArijit Malik
Chartered AccountantKshitij Shah & Associates
PartnerRole in project
M/S Brizeal Realtors & Developers LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013061Dec 2022 → Dec 2023

Reason as filed by the promoterOur Project is 90% Complete and only last 6 months we need to handover successfully.Due to unavoidable circumstances where whole world is fighting not just for Covid - 19 pandemic but also difficult to survive financially. We are facing the worst labour and financial issue in this time because of that we are to go ahead with construction of the building. Due to scarcity of demand in housing industry, we hereby revised the plan with compact flats instead of huge flats to get best sale in the project and for the survival of the Project. Also note that, getting the permission from department as m

Litigation declared2

CaseCourtStatus
60/2015Bombay High CourtFor Framing issues
1260/2018Bombay High CourtNotice of motion for hearing

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC006000000195385Pramod GuptaBrizeal Realtors and Developers LLP29/12/2020
CC006000000195387Jitendra GuptaBrizeal Realtors and Developers LLP29/12/2020
CC006000000195386Sandeep JainBrizeal Realtors and Developers LLP29/12/2020
CC006000000428818Suryakant Vitthal LokhandeBRIZEAL REALTORS AND DEVELOPER LLP12/01/2024
CC006000000479917Khushboo MukherjeeBrizeal Realtors & Developers LLP03/04/2024
CC12401302satish Liladhar ModiMR DINESH KUMAR YADAV31/12/2024
CC12500038M/S Brizeal Realtors & Developers LLPDINESH KUMAR YADAV04/01/2025
CC12500067M/S Brizeal Realtors & Developers LLPMR PRANAB CHATTERJEE08/01/2025
CC12500096M/S Brizeal Realtors & Developers LLPAnkur Shirish Sanghvi10/01/2025
CC12500864Ashok Kumar Kunju PillaiM/S Brizeal Realtors & Developers LLP12/03/2025
CC12502017Ankur Shirish SanghviM/S Brizeal Realtors & Developers LLP20/06/2025
CC12602801Arihant Surajmal JainM/S Brizeal Realtors & Developers LLP14/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed188

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 188 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf14 Dec 2024
Certificates of CA (Form 3)File: FORM 3.pdf14 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf14 Dec 2024
Declaration about Commencement CertificateFile: Form D.pdf14 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf24 Jul 2023
Declaration about Commencement CertificateFile: FORM D.pdf24 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf24 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf24 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Units.pdf24 Jul 2023
Certificates of CA (Form 3)File: Form 3.pdf24 Jul 2023
Declaration about Commencement CertificateFile: Form D.pdf25 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.PDF25 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.PDF25 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Units.pdf25 May 2023
Certificates of CA (Form 3)File: Form 3.pdf25 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf18 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.PDF18 Jan 2023
Certificates of CA (Form 3)File: Form 3.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 - FY 17-18.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - FY 18-19.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - FY 19-20.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - FY 20-21.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - FY 21-22.pdf17 Jan 2023
Declaration about Commencement CertificateFile: Form D.pdf10 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold:Unsold UNits.pdf10 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf17 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf17 Oct 2022
Certificates of CA (Form 3)File: Form 3.pdf17 Oct 2022
Certificates of CA (Form 3)File: Form 3.pdf10 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf27 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf27 Jun 2022
Certificates of CA (Form 3)File: Form 3.pdf27 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Siddha-Seabrook-RERA Compliance-Rehab01-Dec2020.pdf8 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Siddha-Seabrook-RERA Compliance-Rehab02-Dec2020.pdf8 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Siddha-Seabrook-RERA Compliance-Sale Building-Dec2020.pdf8 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-1_DEC2020.pdf8 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-2_DEC2020.pdf8 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENEGINEERS CERTIFICATE_Sale Bldg_DEC2020.pdf8 May 2021
Certificates of CA (Form 3)File: Form 3 Siddha Seabrook Oct to Dec 20-3.pdf8 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Siddha Seabrook-RERA Compliance-Rehab01-Sept2020.pdf22 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Siddha Seabrook-RERA Compliance-Rehab02-Sept2020.pdf22 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Siddha Seabrook-RERA Compliance-Sale BuildinG-Sept2020.pdf22 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENEGINEERS CERTIFICATE_Sale Bldg_Sept'2020.pdf22 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-1_Sept'2020.pdf22 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-2_Sept'2020.pdf22 Mar 2021
Certificates of CA (Form 3)File: Form 3 Siddha Seabrook Q2 FY 19-20_compressed 5.pdf22 Mar 2021
Certificates of CA (Form 3)File: Form 3 Siddha Q1.pdf8 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Rehab-1_Jun2020.pdf7 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Rehab-2_Jun2020.pdf7 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Sale Building_Jun2020.pdf7 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Sale Bldg.pdf7 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-1_June'2020.pdf7 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-2_June'2020.pdf7 Oct 2020
Certificates of CA (Form 3)File: Form 3 Rera March 2020 - 1.pdf7 Oct 2020
PAN CardFile: BRD Pan Card.pdf3 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: CC of Sale upto 43rd Floor Dt- 11 08 20.pdf3 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Rehab-1_Mar2020.pdf3 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Rehab-2_Mar2020.pdf3 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Sale Building_Mar2020.pdf3 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Rehab-1_Mar2020.pdf3 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-1_March'2020.pdf3 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-2_March'2020.pdf3 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-Sale Bldg.pdf3 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-1_March'2020.pdf3 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Brizeal-Rehab-1_Dec2019.pdf17 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Brizeal-Rehab-2_Dec2019.pdf17 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Sale Building_Dec2019.pdf17 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENEGINEERS CERTIFICATE_Sale Bldg_Sept'19.pdf17 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-1_June'19.pdf17 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-2_June'19.pdf17 Aug 2020
Certificates of CA (Form 3)File: Form 3 Siddha Oct - Dec 19.pdf17 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Rehab-1_Sept2019.pdf29 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Rehab-2_Sept2019.pdf29 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE_Sale Building_Sept2019.pdf29 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENEGINEERS CERTIFICATE_Sale Bldg_Sept'19.pdf29 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-1_June'19.pdf29 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE_Rehab-2_June'19.pdf29 Nov 2019
Certificates of CA (Form 3)File: Form_3_Siddha_Jul_-_Sept__19_final.pdf29 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFCIATE_SALE REHAB_JUN-2019_compressed (1).pdf28 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENEGINEERS CERTIFICATE_Sale Bldg_June'19.pdf28 Sep 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Siddha Seabrook on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali (West)6,700+ in Mumbai Suburban

2 kmSiddha SeabrookCompleted 146Lapsed / revoked 93Other 161Dot size: filed unitsN

Filed coordinates, straight-line distance. 400 registered projects within 2 km.

Builder: M/S Brizeal Realtors & Developers LLP

M/S Brizeal Realtors & Developers LLP has 1 registration on MahaRERA, including Siddha Seabrook. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Siddha Seabrook shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Siddha Seabrook is delayed beyond 29 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Siddha Seabrook?

The registered promoter entity is M/S Brizeal Realtors & Developers LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Siddha Seabrook?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Siddha Seabrook?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Siddha Seabrook?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Siddha Seabrook?

The professionals named in the filing: Architect: DOT Architects; Engineer: Arijit Malik; Chartered Accountant: Kshitij Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Siddha Seabrook?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Siddha Seabrook. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Siddha Seabrook to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.