Home / Browse projects / Nashik, Maharashtra / SHYAM VRINDAVAN

Registered No litigation declared Residential / Group Housing project

SHYAM VRINDAVAN

By SHYAM CONSTRUCTION

RG-MH-05038 · RERA P51600023205 · Last updated on MahaRERA portal: 30 Mar 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 51 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 51 months from the original
19 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

SHYAM VRINDAVAN is a Residential / Group Housing project by SHYAM CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600023205 on 6 Dec 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 51 months from the original filing.

At a glance

Project

  • NameSHYAM VRINDAVAN
  • TypeResidential / Group Housing
  • Location
    • S NO 71/1
    • SAMARTH NAGAR
    • BEHIND SHARAD PAWAR MARKETYARD
    • PETH ROAD
    • MAKHMALABAD LINK ROAD
    • Nashik (M Corp.)
    • Nashik
    • 422004
  • Pincode422004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600023205
  • ReraGenie IDRG-MH-05038

Builder

  • NameSHYAM CONSTRUCTION
  • Entity typePartnership
  • GSTIN27ACMFS6663H1ZJ
  • PartnerSURENDER RAJURAM SAINI
  • Declared earlier projects3 →

Key dates

this monthRegisteredDec 2019First promiseSep 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Dec 2019
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 16 Sep 2023)
  • Buildings3 building records
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VALLABH A WINGNA120000
MOHAN B WINGNA70000
KESHAV C WINGNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

VALLABH A WING41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MOHAN B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
KESHAV C WING77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 30 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed425

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots425
Closed/Covered299
Open Space126
BuildingClosed/CoveredOpen SpaceTotal
VALLABH A WING23681317
MOHAN B WING312354
KESHAV C WING322254

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,258 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
SHYAM CONSTRUCTIONNashikNashik
ALPANA KESHAV GHOTEKARNashik (M Corp.)Nashik
VISHAL KESHAV GHOTEKARNashik (M Corp.)Nashik
VIKAS KESHAV GHOTEKARNashikNashik
SUJATA NARENDRA SONAWANENashik (M Corp.)Nashik
NARENDRA BABURAO SONAWANENashikNashik
CHANDRASHEKHAR MADHAVRAO VANJARINashikNashik
VEENA CHANDRASHEKHAR VANJARINashikNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI6995.65
Proposed, not sanctioned6,996 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALA NO 1 AND 2, RAJMILLAB SOCIETY, DINDORI NAKA, NEAR PANCHVATI CIRCLE, NASHIK, 422003

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SHYAM CONSTRUCTION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600017597Sep 2023 → Sep 2024

Reason as filed by the promoterWe, Shyam Construction have registered our project named SHYAM VRINDAVAN with MahaRERA having project registration number P51600023205. The certificate of the project is valid till 16/09/2023. We would like to apply for extension of project under section 6 of Rera Act, 2016 due to the following reasons: 1. Our project is registered in initial phase of rera and also it was new for us. We erred estimating the time for completion of project. 2. In between there was Covid Wave due to which construction work and bookings of our project were affected. It took considerable amount of time for our busi

EXT51600025639Sep 2023 → Dec 2027

Reason as filed by the promoterOur project is registered in initial phase of rera and also it was new for us. We erred estimating the time for completion of project. In between there was Covid Wave due to which construction work and bookings of our project were affected. It took considerable amount of time for our business to cope up and get back to routine business activity. Consequently, there were labour and financial problems due to which the project was further delayed. We had obtained extension of project under section 6 but could not complete the project due to financial distress. Our building consists of two wings v

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Dec 2024

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf30 Mar 2026
Form 2File: Form 2.pdf30 Mar 2026
Form 3File: Form 3.pdf30 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory 16-12-2024.pdf30 Mar 2026
Building plan approvalFile: Revised SP 1.pdf19 Dec 2024
Building plan approvalFile: Revised SP 2.pdf19 Dec 2024
Building plan approvalFile: Revised SP 3.pdf19 Dec 2024
Declaration in FORM BFile: Form B.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised SP 1.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised SP 2.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised SP 3.pdf19 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2023-24.pdf19 Dec 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf20 Sep 2023
Declaration in FORM BFile: Form B.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 2020.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 2021.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 2022.pdf20 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2023.pdf17 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf17 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 2019-20.pdf17 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 2020-21.pdf17 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 2021-22.pdf17 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2022-23.pdf17 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf24 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf24 Aug 2023
PAN CardFile: SC PAN.pdf4 Dec 2019
Details of encumbrancesFile: Nil Encumbrances letter.pdf4 Dec 2019
Proforma of Allotment letterFile: Allotment letter n Agreement.pdf4 Dec 2019
OtherFile: Flat wise details_min.pdf4 Dec 2019
OtherFile: Letter credai etc.pdf4 Dec 2019
Layout approvalFile: Building Plan 1-3_upload.pdf18 Nov 2019
Building plan approvalFile: Building Plan 3-3 Uplaod.pdf18 Nov 2019
Copy of the legal title reportFile: Title Investigation report.pdf18 Nov 2019
Copy of Layout Approval (in case of layout)File: Building Plan 1-3_upload.pdf18 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3-3 Uplaod.pdf18 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-upload.pdf18 Nov 2019
Declaration in FORM BFile: Dilip Saini.pdf18 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate for Completion.pdf18 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cost Cert Madhukar more n Asso.pdf18 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate_Sham Vrindavan.PDF18 Nov 2019
OtherFile: Building Plan 2-3__upload.pdf18 Nov 2019

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHYAM VILLABAJRAJ NAGAR DHATRAK PHATA OPP WATER TANK AGRA ROAD NASHIK 4220035CompletedApr 2017Apr 2017
SHYAM KUNJ APPARTMENTASHTAVINAYAK NAGAR BEHIND SAMARTH NAGAR MAHKHMALABAD ROAD NASHIK9CompletedApr 2017Apr 2017
SHRI VINAYAK APPARTMENTOPP MAHAVIR COLLEGE AT AND POST WARVANDI DINDORI NASHIK56CompletedFeb 2016Feb 2016

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 51 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHYAM VRINDAVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PETH ROAD, MAKHMALABAD LINK ROAD4,100+ in Nashik

2 kmSHYAM VRINDAVANCompleted 54Lapsed / revoked 16Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 129 registered projects within 2 km.

Builder: SHYAM CONSTRUCTION

SHYAM CONSTRUCTION has 1 registration on MahaRERA, including SHYAM VRINDAVAN. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHYAM VRINDAVAN is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHYAM VRINDAVAN?

The registered promoter entity is SHYAM CONSTRUCTION, a partnership as per the filing. Its GSTIN 27ACMFS6663H1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHYAM VRINDAVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHYAM VRINDAVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SHYAM VRINDAVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHYAM VRINDAVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHYAM VRINDAVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.