Registered No litigation declared Others project

SHUBHAM EXOTICA

By SRIVARI SHUBHA DEVELOPERS LLP

RG-MH-95537 · RERA P53100076951 · Last updated on MahaRERA portal: 1 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Basement (if any), 90%
37 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

SHUBHAM EXOTICA is a Others project by SRIVARI SHUBHA DEVELOPERS LLP in Sangli, Maharashtra, registered with MahaRERA as P53100076951 on 9 Jul 2024. Possession is promised by 31 Dec 2027. 2 of the 39 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHUBHAM EXOTICA
  • TypeOthers
  • Location
    • NEAR COLLAGE CORNER
    • NORTH SHIVAJINAGAR
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100076951
  • ReraGenie IDRG-MH-95537

Builder

  • NameSRIVARI SHUBHA DEVELOPERS LLP
  • Entity typePartnership
  • Partnersnaina sandip malu, anjana shyamsundar malu, rekha girish malu

Key dates

this monthRegisteredJul 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Jul 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Current status

5%2 of 39 units booked
19.5%Work done, per cost certificate

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHUBHAM EXOTICANA1010221739

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

SHUBHAM EXOTICA: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed74

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots74
Closed/Covered32
Open Space42

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,166 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Nov 2025
LandownerVillageDistrict
SHAMSUNDAR SATYANARAYAN MALUSangli Miraj Kupwad (M Corp.)Sangli
sandip satyanarayan maluSangli Miraj Kupwad (M Corp.)Sangli
girish satyanarayan maluSangli Miraj Kupwad (M Corp.)Sangli
SATISH SURESH KHADEPune (M Corp.)Pune
jayashree kiran bargaleIchalkaranji (M Cl)Kolhapur
dhanashree anil yalruteIchalkaranji (M Cl)Kolhapur

Approvals and building plan

Sanctioning authoritySANGLI MIRAJ KUPWAD MUNICIPAL CORPORATION
Permissible FSI5543.88
Proposed, not sanctioned5,544 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANGLI MAIN GF C S NO 1044 SUKH SHANTI HEIGHTS AMRAI ROAD NORTH SHIVAJINAGAR SANGLI 416416
Estimated costRs 15.48 cr
Cost incurredRs 3.02 cr
Work done19.49%
BuildingWingEstimatedIncurred
SHUBHAM EXOTICANARs 15.48 crRs 3.02 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectambar m shinde
Engineerrokesh basappa kamble
Chartered AccountantV M NAWANDHAR
Chartered AccountantCA SHIVAM SANCHETI
PartnerRole in project
SRIVARI SHUBHA DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 30-9-25.pdf1 May 2026
Withdrawal Update Form 1File: Form 1 31-12-25.pdf1 May 2026
Withdrawal Update Form 2File: FORM-2 30-9-25.pdf1 May 2026
Withdrawal Update Form 2File: Form 2 31-12-25.pdf1 May 2026
Withdrawal Update Form 3File: FORM-3 30-9-25.pdf1 May 2026
Withdrawal Update Form 3File: Form 3 31-12-25.pdf1 May 2026
Withdrawal Update Form 1File: FORM-1 30-6-25.pdf25 Nov 2025
Withdrawal Update Form 2File: FORM-2 30-6-25.pdf25 Nov 2025
Withdrawal Update Form 3File: FORM-3 30-6-25.pdf25 Nov 2025
Form 1File: FORM-1 31-3-25.pdf17 Nov 2025
Form 2File: FORM-2 31-3-25.pdf17 Nov 2025
Form 3File: FORM-3 31-3-25.pdf17 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD - UNSOLD 31-3-25.pdf17 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31-12-24.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 31-12-24.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31-12-24.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold 31-12-24.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30092024.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30092024.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30092024.pdf30 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 30092024.pdf30 Nov 2024
Other - LegalFile: DECLARATION ANOUT CITY SURVEY NUMBER.pdf29 Jun 2024
Other - LegalFile: SALE DEED 325 16 OUT OF 1042_COMPRESSED.pdf27 Jun 2024
Other - LegalFile: Irrevocable Power of Attorney.pdf27 Jun 2024
Other - TechnicalFile: DECALATION CUM UNDERTAKING.pdf8 May 2024
Other - LegalFile: DEVELOPMENT AGREEMENT NEW SCAN PAGE 41 TO 80_compressed.pdf11 Apr 2024
Other - LegalFile: SALE DEED 81 29 OUT OF 1042.pdf11 Apr 2024
Other - LegalFile: DEVELOPMENT AGREEMENT NEW SCAN PAGE 1 TO 40_compressed (1).pdf3 Apr 2024
Other - TechnicalFile: SMKC TO RERA MAIL.pdf3 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Adobe Scan 02-Mar-2024 (1).pdf2 Mar 2024
Other - LegalFile: Adobe Scan 02-Mar-2024.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seprate bank account for real estate project.pdf20 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: REKHA GIRISH MALU.pdf21 Dec 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf8 Dec 2023
Deviation Report with respect to Allotment letterFile: no devation certificate - 20112023.pdf8 Dec 2023
Deviation Report with respect to model copy of AgreementFile: no devation certificate.pdf8 Dec 2023
Layout approvalFile: AMALGAAMTION DRG.pdf6 Dec 2023
Building plan approvalFile: scan0661 PLAN_compressed.pdf6 Dec 2023
Building plan approvalFile: scan0661 SECTION_compressed.pdf6 Dec 2023
PAN CardFile: pan card.pdf6 Dec 2023
Copy of the legal title reportFile: legal title report.pdf6 Dec 2023
Details of encumbrances concerned to FinanceFile: no encumbrance certificate to whomsover it may concern REVISED.pdf6 Dec 2023
Details of encumbrances concerned to FinanceFile: no encumbrance certificate - legal.pdf6 Dec 2023
Details of encumbrances concerned to LegalFile: no encumbrance certificate to whomsover it may concern REVISED.pdf6 Dec 2023
Details of encumbrances concerned to LegalFile: no encumbrance certificate - legal.pdf6 Dec 2023
Copy of Layout Approval (in case of layout)File: AMALGAAMTION DRG.pdf6 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0661 PLAN_compressed.pdf6 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0661 SECTION_compressed.pdf6 Dec 2023
Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf6 Dec 2023
Declaration in FORM BFile: affidavit cum declaration sanket.pdf6 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf6 Dec 2023
CERSAI detailsFile: undertaking1.pdf6 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE CHNGED 20062024_compressed.pdf6 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SANKET BAJAJ.pdf6 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate org- naina malu.pdf6 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in order real estate org - nikhil nawandhar.pdf6 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate org - anjana malu.pdf6 Dec 2023
Proforma of Agreement for saleFile: SHUBHAM EXOTICA RERA agreement DRAFT_compressed (1).pdf6 Dec 2023

How this compares with Sangli

5%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep SHUBHAM EXOTICA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NORTH SHIVAJINAGAR790+ in Sangli

2 kmSHUBHAM EXOTICACompleted 64Lapsed / revoked 43Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 128 registered projects within 2 km.

Builder: SRIVARI SHUBHA DEVELOPERS LLP

SRIVARI SHUBHA DEVELOPERS LLP has 1 registration on MahaRERA, including SHUBHAM EXOTICA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if SHUBHAM EXOTICA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHUBHAM EXOTICA?

The registered promoter entity is SRIVARI SHUBHA DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHUBHAM EXOTICA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHUBHAM EXOTICA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHUBHAM EXOTICA?

The professionals named in the filing: Architect: ambar m shinde; Engineer: rokesh basappa kamble; Chartered Accountant: V M NAWANDHAR; Chartered Accountant: CA SHIVAM SANCHETI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHUBHAM EXOTICA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHUBHAM EXOTICA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHUBHAM EXOTICA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.