Home / Browse projects / Raigarh, Maharashtra / SHUBHADA COOP HOUSING SOCIETYPROPOSED
SHUBHADA COOP HOUSING SOCIETYPROPOSED
RG-MH-54098 · RERA P52000046434 · Last updated on MahaRERA portal: 9 Oct 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHUBHADA COOP HOUSING SOCIETYPROPOSED is a Residential / Group Housing project by KAUSTUBH JEEVAN KULKARNI in Raigarh, Maharashtra, registered with MahaRERA as P52000046434 on 28 Jul 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 33 of the 40 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSHUBHADA COOP HOUSING SOCIETYPROPOSED
- TypeResidential / Group Housing
- Location
- SANT SAVTA MALI MARG
- CHENDHARE
- Chendhre
- Alibag
- Raigarh
- 402201
- Pincode402201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000046434
- ReraGenie IDRG-MH-54098
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Jul 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed107 files
Current status
Figures as on 9 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHUBHADA COOP HOUSING SOCIETY PROPOSED | NA | 8 | 7 | 40 | 0 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 63%.
SHUBHADA COOP HOUSING SOCIETY PROPOSED: 50% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 63% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 63% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed95
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| VISION DEVELOPERS | Chendhre | Raigarh |
| MANISH GANPAT MALI | Chendhre | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL SUDHAKAR KULKARNI |
| Engineer | MAHESH CHAVAN |
| Chartered Accountant | SANDEEP P BHOIR |
| Partner | Role in project |
|---|---|
| KAUSTUBH JEEVAN KULKARNI | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Mar 2025
Documents filed107
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect Certificate Shubhada soc sep 2025.pdf | 9 Oct 2025 |
| Form 2File: FORM 2 ENGG CERTIFICATE Sept 30 2025 shubhada_DSC.pdf | 9 Oct 2025 |
| Form 3File: Form -3 Kulkarni Realtors Sep 2025.pdf | 9 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Shubhada Society Sep 2025 (1).pdf | 9 Oct 2025 |
| OthersFile: Form 5 Kulkarni Realtors .pdf | 9 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubhada Architect Certificate June 2025.pdf | 3 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kulkarni Realtors Shubhada Soc CA June 2025.pdf | 3 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE june 30 2025 Shubhada_DSC.pdf | 3 Jul 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: shubhada society regn cert.pdf | 3 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Shubhada Sold Unsold 30 June 2025.pdf | 3 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shubhada society Architect Certificate March 2025 (1).pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shubhada CA March 2025.pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE Mar 31 2025 shubhada dsc.pdf | 8 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Shubhada Sold Unsold mar 25.pdf | 8 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Shubhada March 2025.pdf | 8 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for | 28 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch certificate shubhada dec 24.pdf | 9 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shubhada CA Dec 2024.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE Dec 31 2024 shubhada dsc.pdf | 9 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Shubhada Sold Unsold Dec 2024.pdf | 9 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Shubhada Sold Unsold Dec 2024.pdf | 9 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERTIFICATE SEPT 24 SHUBHADA.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE Sep 30 2024 shubhada DSC.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: soldunsold Shubhada Sept 24.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kulkarni Realtors C A September 2024.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kulkarni Realtors 2023-24.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Kulkarni Realtors C A September 2024.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH CERTIFICATE SEPT 24 SHUBHADA.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kulkarni Realtors C A September 2024.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE Sep 30 2024 shubhada DSC.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: soldunsold Shubhada Sept 24.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kulkarni Realtors 2023-24.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Kulkarni Realtors C A September 2024.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shubhada architeck document.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHUBHADA ARCH JUNE 24.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shubhada engineers certificate.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE June 30 2024 shubhada.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Kulkarni Realtors Sold Unsold June 2024.pdf | 4 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHUBHADA CA JUNE 24.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 shubhada march 24.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE march 31 2024.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: q c kulkarni realtors 2023-24_compressed.pdf | 5 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: kulkarni realtors sold unsold MARCH 24.pdf | 5 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a kulkarni realtors march 2024 (1).pdf | 5 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: c a kulkarni realtors 2023-24.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shubhada architect.pdf | 2 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Kulkarni realtors.pdf | 2 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold Kulkarni realtors.pdf | 2 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate Kulkarni realtors.pdf | 2 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan Oct 03, 2023.pdf | 3 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE 30 SEPT 23.pdf | 3 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: shubhada sold unsold 30-09-23.pdf | 3 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shubhada ca 30-9-23.pdf | 3 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: k r qc 4.pdf | 6 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: k r qc 1.pdf | 6 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: k r qc 2.pdf | 6 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: k r qc 3.pdf | 6 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: sold ' unsold kulkarni realtors (1).pdf | 6 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA COMPRESSED (1).pdf | 6 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SPB.pdf | 6 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shubhada architeck document.pdf | 5 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shubhada engineers certificate.pdf | 5 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shubhda ca qtr mar 23-compressed (1).pdf | 9 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: kr audit declaration.pdf | 7 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: kr qc 21-22.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: KR AUDIT DECLARATION.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KR AUDIT DECLARATION.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KR AUDIT DECLARATION.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KR AUDIT DECLARATION.pdf | 6 Apr 2023 |
| Proforma of Agreement for saleFile: PROFORMA AGREEMENT.pdf | 6 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: k r atul s kulkarni.pdf | 5 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: k r associated consulting engineers mahesh chavan.pdf | 5 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: k r disclosure sold unsold.pdf | 5 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch form 1 shubhada 30 SEPT.pdf | 9 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch form 1 shubhada Dec 22.pdf | 9 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 engg shubhada sept 22_compressed.pdf | 9 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 engg shubhada dec 22.pdf | 9 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold 30 sept shubhada.pdf | 9 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold shubhada 31 dec.pdf | 9 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 shubhada 30 sept_compressed.pdf | 9 Jan 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SUKHADA CO-OP HSG SOCIETY | CHENDHARE ALIBAG | 14 | Completed | Dec 2022 | Feb 2021 |
| YASHDA CO-OP HSG SOCIETY | CHENDHARE ALIBAG | 15 | Completed | Dec 2019 | Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 107 filed documents as one ZIP, foldered, with a manifest
Keep SHUBHADA COOP HOUSING SOCIETYPROPOSED on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHENDHARE5,900+ in Raigarh
Filed coordinates, straight-line distance. 61 registered projects within 2 km.
CROWN
BHASIN PROPERTIES AND DEVELOPERS PVT LTD
GOLDEN PALMS
AKSHAY BUILDERS
Amit Complex
Dattaram Dhaku Gawade and Shobha Dattaram
Violet Hill
Total Environment Resorts Private Limited
Acons Prive
Akshay Gulati
Alibag Divine
A Corporation
See every Raigarh project, with the district possession charts
Builder: KAUSTUBH JEEVAN KULKARNI
KAUSTUBH JEEVAN KULKARNI has 3 registrations on MahaRERA, including YASHDA COOPERATIVE HOUSING SOCIETY PROPOSED and SUKHADA CO-OP HOUSING SOCIETY. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SHUBHADA COOP HOUSING SOCIETYPROPOSED is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHUBHADA COOP HOUSING SOCIETYPROPOSED?
The registered promoter entity is KAUSTUBH JEEVAN KULKARNI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHUBHADA COOP HOUSING SOCIETYPROPOSED?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHUBHADA COOP HOUSING SOCIETYPROPOSED?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHUBHADA COOP HOUSING SOCIETYPROPOSED?
The professionals named in the filing: Architect: ATUL SUDHAKAR KULKARNI; Engineer: MAHESH CHAVAN; Chartered Accountant: SANDEEP P BHOIR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHUBHADA COOP HOUSING SOCIETYPROPOSED?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback