Home / Browse projects / Raigarh, Maharashtra / Amit Complex
Amit Complex
By Dattaram Dhaku Gawade and Shobha Dattaram Gawade Joint Co-Owner
RG-MH-34787 · RERA P52000008849 · Last updated on MahaRERA portal: 9 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 60 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Amit Complex is a Residential / Group Housing project by Dattaram Dhaku Gawade and Shobha Dattaram Gawade Joint Co-Owner in Raigarh, Maharashtra, registered with MahaRERA as P52000008849 on 19 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 60 months from the original filing. 0 of the 185 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.
At a glance
Project
- NameAmit Complex
- TypeResidential / Group Housing
- Location
- Dighi-Pune Road
- Utekhol
- Mangaon
- Raigarh
- 402201
- Pincode402201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000008849
- ReraGenie IDRG-MH-34787
Builder
- NameDattaram Dhaku Gawade and Shobha Dattaram Gawade Joint Co-Owner
- Entity typeOthers
- PartnersDattaram D Gawade Gawade, Shobha D Gawade Gawade
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Aug 2017
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed94 files
Current status
Figures as on 9 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Amit Complex Signature 1 | NA | 8 | 8 | 70 | 10 | 80 |
| Amit Complex Signature 2 | NA | 8 | 8 | 84 | 21 | 105 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 35%.
Amit Complex Signature 191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Amit Complex Signature 230%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 35% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 5% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed585
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Amit Complex Signature 1 | 215 | 55 | 270 |
| Amit Complex Signature 2 | 260 | 55 | 315 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Amit Complex Signature 1 | NA | Rs 24.32 cr | Rs 15.81 cr |
| Amit Complex Signature 2 | NA | Rs 12.76 cr | Rs 3.83 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Manajit Mohite |
| Architect | VASTU CULTURE |
| Engineer | Mr.Shishir Dhawade |
| Engineer | SHIV ASSOCIATES |
| Chartered Accountant | VIDYA SAGAR BHURE |
| Chartered Accountant | RUTUJA SAJJAN NARSINGH |
| Chartered Accountant | Manoj Mahimkar |
| Partner | Role in project |
|---|---|
| Dattaram Dhaku Gawade and Shobha Dattaram Gawade Joint Co-Owner | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of % allottees for purpose of extension of RERA registration period of the said project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 9 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 9 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 9 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 5 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 5 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 5 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 5 Jun 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 5 Jun 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 5 Jun 2026 |
| Withdrawal Update Form 1File: Amit Complex Architect Certificate_compressed.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: Amit Complex Architect Certificate_compressed.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Certificate_compressed.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Certificate_compressed.pdf | 18 May 2026 |
| Building plan approvalFile: Amit Complex Signature_1_2.pdf | 20 Dec 2025 |
| Building plan approvalFile: Amit Complex SIGNATURE 2 A Plot No 60 to 68.pdf | 20 Dec 2025 |
| Building plan approvalFile: Amit Complex SIGNATURE 2 B Plot No 60 to 68.pdf | 20 Dec 2025 |
| Building plan approvalFile: Amit Complex SIGNATURE 1 A Plot No 81 to 88.pdf | 20 Dec 2025 |
| Building plan approvalFile: Amit Complex SIGNATURE 1 B Plot No 81 to 88.pdf | 20 Dec 2025 |
| Withdrawal Update Form 1File: Amit Complex Architect Certificate_compressed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (3) Signed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: Amit Complex Architect Certificate_compressed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: Amit Complex Enginner Certificate_signed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: Withdrawal_Application_Form2_(3)[1] Signed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: Withdrawal_Application_Form2_(3)[1] Signed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Certificate_compressed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Scan Certificate_compressed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Certificate_compressed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (3) Signed.pdf | 2 Dec 2025 |
| Withdrawal Update Form 1File: Amit Complex Architect Certificate_compressed.pdf | 2 Dec 2025 |
| Withdrawal Update Form 2File: Withdrawal_Application_Form2_(3)[1] Signed.pdf | 2 Dec 2025 |
| Withdrawal Update Form 2File: Amit Complex Enginner Certificate_signed.pdf | 2 Dec 2025 |
| Withdrawal Update Form 3File: Scan Certificate_compressed.pdf | 2 Dec 2025 |
| Withdrawal Update Form 3File: Certificate_compressed.pdf | 2 Dec 2025 |
| Withdrawal Update Form 1File: Withdrawal_Application_Form1_April_to_June.pdf | 26 Nov 2025 |
| Withdrawal Update Form 1File: Withdrawal_Application_Form1_April_to_June.pdf | 26 Nov 2025 |
| Withdrawal Update Form 1File: Withdrawal_Application_Form1_April_to_June.pdf | 26 Nov 2025 |
| Withdrawal Update Form 1File: Withdrawal_Application_Form1_April_to_June.pdf | 26 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal_Application_Form2_April_to_June.pdf | 26 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal_Application_Form2_April_to_June.pdf | 26 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal_Application_Form2_April_to_June.pdf | 26 Nov 2025 |
| Withdrawal Update Form 2File: Withdrawal_Application_Form2_April_to_June.pdf | 26 Nov 2025 |
| Withdrawal Update Form 3File: Amit Complex CA Certificate.pdf | 26 Nov 2025 |
| Withdrawal Update Form 3File: Amit Complex CA Certificate.pdf | 26 Nov 2025 |
| Withdrawal Update Form 3File: Amit Complex CA Certificate.pdf | 26 Nov 2025 |
| Withdrawal Update Form 3File: Amit Complex CA Certificate.pdf | 26 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 25 Jul 2025 |
| Building Plan Approval (IOD)File: gavde Plan_11zon.pdf | 11 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: gavde revised cc.pdf | 11 Jan 2024 |
| Declaration about Commencement CertificateFile: REVISED FORMAT D (32).pdf | 11 Jan 2024 |
| Declaration in FORM BFile: Form B Amit Complex.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 sept.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept Amit.pdf | 9 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 9 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf | 9 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 9 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 9 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 9 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29_11zon.pdf | 9 Jan 2024 |
| Certificates of CA (Form 3)File: SIGNEDForm 3 - Amit Complex - September 2023.pdf | 9 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: SIGNEDForm 5 - Amit Complex - 2017-2018 (1).pdf | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SIGNEDForm 5 - Amit Complex - 2018-2019 (1).pdf | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SIGNEDForm 5 - Amit Complex - 2019-2020 (1).pdf | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SIGNEDForm 5 - Amit Complex - 2020-2021 (1).pdf | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SIGNEDForm 5 - Amit Complex - 2021-2022 (1).pdf | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SIGNEDForm 5 - Amit Complex - 2022-2023 (1).pdf | 5 Jan 2024 |
| Declaration about Commencement CertificateFile: Format D Amit Complex.pdf | 2 Jan 2024 |
| Declaration in FORM BFile: Form B.pdf | 2 Jan 2024 |
| OtherFile: declaration.pdf | 14 Nov 2017 |
| Building plan approvalFile: building plan 60 to 68.pdf | 14 Aug 2017 |
| Building plan approvalFile: building plan 060 to 68.pdf | 14 Aug 2017 |
| Building plan approvalFile: building plan Doc 81 - 88.pdf | 14 Aug 2017 |
| Layout approvalFile: building plan 060 to 68.pdf | 14 Aug 2017 |
| Layout approvalFile: building plan 60 to 68.pdf | 14 Aug 2017 |
| Layout approvalFile: building plan Doc 81 - 88.pdf | 14 Aug 2017 |
| PAN CardFile: PAN Ack of AOP.pdf | 14 Aug 2017 |
| Details of encumbrancesFile: encumbarances.pdf | 14 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: building plan 060 to 68.pdf | 14 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: building plan 60 to 68.pdf | 14 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Amit Complex on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Utekhol5,900+ in Raigarh
Filed coordinates, straight-line distance. 28 registered projects within 2 km.
CROWN
BHASIN PROPERTIES AND DEVELOPERS PVT LTD
GOLDEN PALMS
AKSHAY BUILDERS
Violet Hill
Total Environment Resorts Private Limited
Acons Prive
Akshay Gulati
Alibag Divine
A Corporation
Alibaug Life
Wings Realty Ventures LLP
See every Raigarh project, with the district possession charts
Builder: Dattaram Dhaku Gawade and Shobha Dattaram Gawade Joint Co-Owner
Dattaram Dhaku Gawade and Shobha Dattaram Gawade Joint Co-Owner has 1 registration on MahaRERA, including Amit Complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Amit Complex is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Amit Complex?
The registered promoter entity is Dattaram Dhaku Gawade and Shobha Dattaram Gawade Joint Co-Owner, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Amit Complex?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Amit Complex?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Amit Complex?
The professionals named in the filing: Architect: Manajit Mohite; Architect: VASTU CULTURE; Engineer: Mr.Shishir Dhawade; Engineer: SHIV ASSOCIATES; Chartered Accountant: VIDYA SAGAR BHURE; Chartered Accountant: RUTUJA SAJJAN NARSINGH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Amit Complex?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback