Red flags

  • De-registered

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 70%
26 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

SHRIPAL SHANTI - T3 is a Residential / Group Housing project by SHRIPAL SHANTI LLP in Palghar, Maharashtra, registered with MahaRERA as P99000053506 on 8 Nov 2023. Possession is promised by 31 Mar 2027. 0 of the 26 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHRIPAL SHANTI - T3
  • TypeResidential / Group Housing
  • Location
    • EVERSHINE HOMES ROAD
    • BOLINJ
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • RERA no.P99000053506
  • ReraGenie IDRG-MH-06169

Builder

  • NameSHRIPAL SHANTI LLP
  • Entity typePartnership
  • PartnersCHOPRA INFRA LLP LLP, DEVENDRA AMRITLAL BAFNA, KARAN VINOD JAIN, MIDAS REALTIES LLP LLP
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on8 Nov 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

0%0 of 26 units booked
26.7%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRIPAL SHANTI T3NA4426026

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 70%.

SHRIPAL SHANTI T3: 15% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,525 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
VASTU DEVELOPERSVasai-Virar City (M Corp)Palghar
RAJ HARISHCHANDRA THAKURVasai-Virar City (M Corp)Palghar
KUNVARJI BACCHUBHAI SHAHBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityVasai Virar City Muncipal Corporation
Permissible FSI12629.67
Proposed, not sanctioned1,115 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2/3 ATLANTA BUILDING, NARIMAN POINT
Estimated costRs 7.50 cr
Cost incurredRs 2.00 cr
Work done26.67%
BuildingWingEstimatedIncurred
SHRIPAL SHANTI T3NARs 6.50 crRs 2.00 cr
-NARs 1.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectENCON
EngineerSanjay S Narang
EngineerZiya Mujahid AL Asad
Chartered AccountantShrikant D Kawde
Chartered AccountantG.D.SINGHVI & CO
PartnerRole in project
SHRIPAL SHANTI LLP-

Litigation declared1

CaseCourtStatus
RCS 316 / 2020/2020CIVIL JUNIOR JUDGE VASAIIN PROCESS

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf25 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3_compressed (1).pdf20 Jan 2026
Form 5 (FY 2024-2025)File: FORM -5.pdf6 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A Shripal Shanti T3.pdf18 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf30 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf30 Oct 2025
Withdrawal Update Form 3File: FORM 3_compressed.pdf30 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE DATED 31122024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFICATE AS ON 31122024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DATED 31122024.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE DATED 30062024.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DATED 30062024.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE AS ON 10072024.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DATED 30032024.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DATED 30032024.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T3 Form 3 CA Certificate as on 03012024 .pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T3 Form 3 CA Certificate as on 31032024.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE DATED 150224.pdf5 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DATED 150224.pdf5 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC clarification letter from Arch.pdf25 Oct 2023
Declaration in FORM BFile: Form B Shripal T3.pdf25 Oct 2023
Building plan approvalFile: BLDG 3-compressed new.pdf11 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: BLDG 3-compressed new.pdf11 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organizations APC T3.pdf4 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organizations DB T3.pdf4 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organizations KJ T3.pdf4 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organizations MPC T3.pdf4 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organizations PBC T3.pdf4 Sep 2023
CERSAI detailsFile: UNDERTAKING FOR NO CERSAI T3.pdf29 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Shripal Declaration about separate bank account T3.pdf29 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate projects T3.pdf29 Aug 2023
Layout approvalFile: Layout.pdf20 Jun 2023
PAN CardFile: Pan Card Shripal Shanti LLP.pdf20 Jun 2023
Copy of the legal title reportFile: RERA Title Certificate T2.pdf20 Jun 2023
Details of encumbrances concerned to FinanceFile: Declaration - Details of encumbrances concern to financial T3.pdf20 Jun 2023
Details of encumbrances concerned to FinanceFile: Declaration - Details of encumbrances concern to legal.pdf20 Jun 2023
Details of encumbrances concerned to FinanceFile: Declaration - Details of Litigation.pdf20 Jun 2023
Details of encumbrances concerned to LegalFile: Declaration - Details of encumbrances concern to financial T3.pdf20 Jun 2023
Details of encumbrances concerned to LegalFile: Declaration - Details of encumbrances concern to legal.pdf20 Jun 2023
Details of encumbrances concerned to LegalFile: Declaration - Details of Litigation.pdf20 Jun 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf20 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Plinth Completion Certificate dated 17821compressed.pdf20 Jun 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf20 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE_compressed.pdf20 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER CERTIFCATE_compressed.pdf20 Jun 2023
CERSAI detailsFile: Cersai T3.pdf20 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 - T3.pdf20 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organizations RHT.pdf20 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organizations KBS T3.pdf20 Jun 2023
Proforma of Allotment letterFile: Model Allottment letter Shripal T3.pdf20 Jun 2023
Proforma of Agreement for saleFile: Draft of model RERA agreement- DSK Comments (15052023)T3.pdf20 Jun 2023
Deviation Report with respect to Allotment letterFile: Declaration OF Deviation Report Allottment Letter.pdf20 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Declaration for Deviation Report with respect to Model AFS T3.pdf20 Jun 2023

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRIPAL SHANTI - T3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BOLINJ3,200+ in Palghar

Builder: SHRIPAL SHANTI LLP

SHRIPAL SHANTI LLP has 3 registrations on MahaRERA, including SHRIPAL SHANTI PHASE - 1 and SHRIPAL SHANTI - T2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that SHRIPAL SHANTI - T3 shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHRIPAL SHANTI - T3 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRIPAL SHANTI - T3?

The registered promoter entity is SHRIPAL SHANTI LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRIPAL SHANTI - T3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRIPAL SHANTI - T3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRIPAL SHANTI - T3?

The professionals named in the filing: Architect: ENCON; Engineer: Sanjay S Narang; Engineer: Ziya Mujahid AL Asad; Chartered Accountant: Shrikant D Kawde; Chartered Accountant: G.D.SINGHVI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRIPAL SHANTI - T3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRIPAL SHANTI - T3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRIPAL SHANTI - T3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.