Home / Browse projects / Raigarh, Maharashtra / Shrida Residency
Shrida Residency
RG-MH-55305 · RERA P52000017101 · Last updated on MahaRERA portal: 25 Jun 2021
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shrida Residency is a Others project by Rasika Constructions in Raigarh, Maharashtra, registered with MahaRERA as P52000017101 on 13 Jul 2018. The registration is recorded completed; possession was promised by 30 Jan 2022.
At a glance
Project
- NameShrida Residency
- TypeOthers
- Location
- Ramnath Road
- Near Dr. Tiwari Hospital
- Alibag
- Raigarh
- 402201
- Pincode402201
- RERA no.P52000017101
- ReraGenie IDRG-MH-55305
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on13 Jul 2018
- Promised completion30 Jan 2022
- Revised completionNone
- Buildings2 building records
- Documents filed82 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shrida Residency - Wing A | NA | 6 | 0 | 0 | 0 | 0 |
| Shrida Residency - Wing B | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Jun 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
Shrida Residency - Wing A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Shrida Residency - Wing B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 25 Jun 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
| Development of Stilt and Side Marginal Space | Yes | 100% |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Shrida Residency - Wing A | 2 | 2 |
| Shrida Residency - Wing B | 4 | 4 |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Yashwant Balkrishna Paradkar | Alibag | Raigarh |
| Shalan Manohar paradkar | Thane (M Corp.) | Thane |
| Sanket Manohar Paradkar | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kuldip Ramchandra Hajare |
| Engineer | Mahesh Vishnu Chavan |
| Partner | Role in project |
|---|---|
| Rasika Constructions | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Jun 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jun 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jun 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 May 2020
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of ConveyanceFile: 1-10 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 11-20 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 21-30 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 31-40 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 41-50 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 51-60 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 61-68 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 69 -78 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 79-88 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 89-98 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 99-107 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 108-117 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 118-127 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 128-137 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 138-147 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 148-157 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 158-170 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 171-180 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 181-190 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 191-200 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 201-206 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 207-216 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 217-226 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 227-236 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 237-246 Deed of Conveyance.pdf | 25 Jun 2021 |
| Status of ConveyanceFile: 247-254 Deed of Conveyance.pdf | 25 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Annual Audit Report Form 5.pdf | 4 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate FORM 1.pdf | 14 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 - Engineer's Certificate.pdf | 14 Sep 2020 |
| Certificates of CA (Form 3)File: FORM - 3 CA Certificate.pdf | 14 Sep 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate FORM - 4.pdf | 14 Sep 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: पहिली सर्व साधारण सभा घेण्यास मुदतवाढ मिळणेबाबत पत्र.pdf | 17 Aug 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf | 11 Jul 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shrida - Occupancy Certificate.pdf | 13 May 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate.pdf | 3 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf | 3 Mar 2020 |
| Certificates of CA (Form 3)File: CHARTERED ACCOUNTAN'S CERTIFICATE.pdf | 3 Mar 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 17 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf | 17 Dec 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 17 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ANNUAL REPORT - FORM 5.pdf | 2 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.pdf | 25 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf | 25 Sep 2019 |
| Certificates of CA (Form 3)File: CHARTERED ACCOUNTANT'S CERTIFICATE.pdf | 25 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 6 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 6 Jul 2019 |
| Certificates of CA (Form 3)File: CHARTERED ACCOUNTANT CERTIFICATE.pdf | 6 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 15 May 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 15 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 12 Jan 2019 |
| Certificates of CA (Form 3)File: CA Certificate-.pdf | 12 Jan 2019 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE PDF.pdf | 28 Sep 2018 |
| Building plan approvalFile: SANCTION PLAN.pdf | 23 Jun 2018 |
| Layout approvalFile: Layout.pdf | 23 Jun 2018 |
| PAN CardFile: PAN CARD.pdf | 23 Jun 2018 |
| Copy of the legal title reportFile: Title Search.pdf | 23 Jun 2018 |
| Details of encumbrancesFile: Encumbrances Certificate.pdf | 23 Jun 2018 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 23 Jun 2018 |
| Building Plan Approval (IOD)File: SANCTION PLAN.pdf | 23 Jun 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf | 23 Jun 2018 |
| Declaration in FORM BFile: Affidavit cum declaration form B Promoter.pdf | 23 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 23 Jun 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 23 Jun 2018 |
| Proforma of Allotment letterFile: Agreement for sale.pdf | 23 Jun 2018 |
| OtherFile: 7-12.pdf | 23 Jun 2018 |
| OtherFile: COMMON AMENITIES.pdf | 23 Jun 2018 |
| OtherFile: UNDERTAKING.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-1-5.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-6-10.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-11-15.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-16-20.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-21-25.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-21-25.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-26-30.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-31-35.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-36-40.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-41-45.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-46-50.pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-51-55 (2).pdf | 23 Jun 2018 |
| OtherFile: POA PARADKAR SCAN-56-60 (1).pdf | 23 Jun 2018 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Malhar | Ramnath Road Near Tiwari Hospital Taluka Alibag Dist Raigad | 16 | Completed | May 2017 | Dec 2016 |
| Kuber | Near Tamboli Hospital Alibag Dist Raigad | 35 | Completed | Mar 2015 | Jul 2014 |
| Eklavya | Chendhare Taluka Alibag Dist Raigad | 21 | Completed | Oct 2011 | Late, Dec 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
Keep Shrida Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Dr. Tiwari Hospital5,900+ in Raigarh
CROWN
BHASIN PROPERTIES AND DEVELOPERS PVT LTD
GOLDEN PALMS
AKSHAY BUILDERS
Amit Complex
Dattaram Dhaku Gawade and Shobha Dattaram
Violet Hill
Total Environment Resorts Private Limited
Acons Prive
Akshay Gulati
Alibag Divine
A Corporation
See every Raigarh project, with the district possession charts
Builder: Rasika Constructions
Rasika Constructions has 2 registrations on MahaRERA, including Shrida Residency and VAGISHWARI RESIDENCY. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Shrida Residency is delayed beyond 30 Jan 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shrida Residency?
The registered promoter entity is Rasika Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shrida Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shrida Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shrida Residency?
The professionals named in the filing: Architect: Kuldip Ramchandra Hajare; Engineer: Mahesh Vishnu Chavan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shrida Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.