Home / Browse projects / Akola, Maharashtra / SHRICHARAN HIEGHTS

Registration lapsed No litigation declared Others project

SHRICHARAN HIEGHTS

By SANJAY SHESHARAO INGLE

RG-MH-00884 · RERA P50100009161 · Last updated on MahaRERA portal: 31 Jul 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 69 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Akola registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 70%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SHRICHARAN HIEGHTS is a Others project by SANJAY SHESHARAO INGLE in Akola, Maharashtra, registered with MahaRERA as P50100009161 on 19 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 69 months from the original filing.

At a glance

Project

  • NameSHRICHARAN HIEGHTS
  • TypeOthers
  • Location
    • Akola (M Corp.)
    • Akola
    • 444001
  • Pincode444001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50100009161
  • ReraGenie IDRG-MH-00884

Builder

  • NameSANJAY SHESHARAO INGLE
  • Entity typeIndividual

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseMar 2020Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Mar 2020)
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRICHARAN HIEGHTSNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

SHRICHARAN HIEGHTS: 58% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 31 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area379 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI471.25
Proposed, not sanctioned366 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWALUJ AURANGABAD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYASHRAJ INGLE
Chartered Accountantvishal Holani
PartnerRole in project
SANJAY SHESHARAO INGLE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50100017807Mar 2020 → Dec 2025

Reason as filed by the promoterTHE PROJECT IS A SMALL PROJECT AND DUE TO AKOLA MUNCIPAL CORPORATION ISSUES WE WERE NOT ALLOWED TO CONSTRUCT FOR 3 YEARS HENCE WE HAD NO OTHER OPTION BUT TO TAKE A CASE TO COMMISIONER AND FINALY THEY ALLOWED US TO CONSTRUCT FURTHER HENCE WE REQUEST YOU TO KINDLY ALLOW US TO EXTEND THE PROJECT TILL 2025 DECEMBER

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architects certificate 2024.pdf31 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 engineers 2024.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A quqlity assuarance certificate 2024_compressed.pdf31 Jul 2024
Certificates of CA (Form 3)File: form 3 2024_compressed.pdf31 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 2024.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CERTIFICATE 2A QUALITY ASSUARANCE DEC 23.pdf10 Jan 2024
CERSAI detailsFile: CKYC NO 20081859276890.pdf27 Nov 2023
Declaration in FORM BFile: P50100009161_FileName_2.pdf13 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CERTIFICATE 2A QUALITY ASSUARANCE JUNE23.pdf10 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CERTIFICATE 2A QUALITY ASSUARANCE SEPT 23.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD USOLD ANNEX A 310720.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD USOLD ANNEX A 310721.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD USOLD ANNEX A 310722.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD USOLD ANNEX A 310723.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: SOLD USOLD ANNEX A 23102023.pdf10 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGG CERTIFICATE 2A 2020.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGG CERTIFICATE 2A 2021.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGG CERTIFICATE 2A 2022.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGG CERTIFICATE 2A 2023.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGG CERTIFICATE 2A 2023 2.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGG CERTIFICATE 2A 2023 3.pdf1 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect 2023 FORM 1 N.pdf23 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer 2018_0001.pdf23 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: enginner 2019_0001_CompressPdf.pdf23 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer 2020_0001 COMPREESSED.pdf23 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer 2021_0001 COMPRESSED.pdf23 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: enggineer 2022_0001 COMPRESSED.pdf23 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shricharan_heights_rera_engineers_certificate 23.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: list of sold inventory and booked 2023.pdf23 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect 2018_0001.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect 2019_0001.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect 2020_0001.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect 2021_0001.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect 2022_0001.pdf20 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect 2023_0001(1)edited.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: list of sold inventory and booked.pdf20 Oct 2023
Certificates of CA (Form 3)File: CA 2018_0001 COMPRESSED.pdf20 Oct 2023
Certificates of CA (Form 3)File: CA 2019_0001 COMMPRESS.pdf20 Oct 2023
Certificates of CA (Form 3)File: CA 2020_0001 COMPRESSED.pdf20 Oct 2023
Certificates of CA (Form 3)File: CA 2021_0001 COMPRESS.pdf20 Oct 2023
Certificates of CA (Form 3)File: CA 2022_0001 COMPRESS.pdf20 Oct 2023
Certificates of CA (Form 3)File: ca certificate form 3 COMPRESSS.pdf20 Oct 2023
Details of encumbrances concerned to FinanceFile: TITLE REPORT OF LAWYER SMALL.pdf19 Oct 2023
Details of encumbrances concerned to LegalFile: TITLE REPORT OF LAWYER SMALL.pdf19 Oct 2023
Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: engineer 2020_0001 COMPREESSED.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: engineer 2021_0001 COMPRESSED.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: enggineer 2022_0001 COMPRESSED.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shricharan_heights_rera_engineers_certificate 23.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: list of sold inventory and booked.pdf19 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: CA 2018_0001 COMPRESSED.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 2019_0001.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 20220_0001.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 2022_0001.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 2022_0001.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ca form 5.pdf19 Oct 2023
Proforma of Agreement for saleFile: proforma allotment letter for agreement to sale.pdf19 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration accountss.pdf19 Oct 2023
Deviation Report with respect to Allotment letterFile: proforma allotment letter for upload.pdf19 Oct 2023
Deviation Report with respect to model copy of AgreementFile: proforma allotment letter for agreement to sale.pdf19 Oct 2023
Layout approvalFile: Sanction LAYOUT PDF SMALL.pdf31 Jul 2017
Building plan approvalFile: commencement certificate and approved plaN SMALL.pdf31 Jul 2017
PAN CardFile: PAN CARD SANJAY PDF.pdf31 Jul 2017
Copy of the legal title reportFile: TITLE REPORT OF LAWYER SMALL.pdf31 Jul 2017
Details of encumbrancesFile: TITLE REPORT OF LAWYER SMALL.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanction LAYOUT PDF SMALL.pdf31 Jul 2017
Building Plan Approval (IOD)File: commencement certificate and approved plaN SMALL.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate and approved plaN SMALL.pdf31 Jul 2017
Declaration in FORM BFile: FORM B DELARATIONNEW.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE SMALL.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: ca.pdf31 Jul 2017
Proforma of Allotment letterFile: AGREEMENT PROFORMA.pdf31 Jul 2017

How this compares with Akola

10%of Akola projects moved their completion datethis one moved by 69 months
33%of Akola registrations have lapsed or been cancelledthis one is among them

Computed across the 120+ Akola projects on ReraGenie, from their own filings.

Keep SHRICHARAN HIEGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Akola (M Corp.)120+ in Akola

Builder: SANJAY SHESHARAO INGLE

SANJAY SHESHARAO INGLE has 1 registration on MahaRERA, including SHRICHARAN HIEGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Akola district page.

Frequently asked questions

What does it mean that SHRICHARAN HIEGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHRICHARAN HIEGHTS is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRICHARAN HIEGHTS?

The registered promoter entity is SANJAY SHESHARAO INGLE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRICHARAN HIEGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRICHARAN HIEGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRICHARAN HIEGHTS?

The professionals named in the filing: Architect: YASHRAJ INGLE; Chartered Accountant: vishal Holani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRICHARAN HIEGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRICHARAN HIEGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRICHARAN HIEGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.