Completed No litigation declared Plotted project

R M Dhariwal Township Akola Plotting

By Dhariwal And Chhoriya Developers LLP

RG-MH-01522 · RERA P50100017949 · Last updated on MahaRERA portal: 7 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Akola registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
23 of 204Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

R M Dhariwal Township Akola Plotting is a Plotted project by Dhariwal And Chhoriya Developers LLP in Akola, Maharashtra, registered with MahaRERA as P50100017949 on 28 Sep 2018. The registration is recorded completed; possession was promised by 30 Dec 2024. 181 of the 204 units on this registration are recorded sold or booked.

At a glance

Project

  • NameR M Dhariwal Township Akola Plotting
  • TypePlotted
  • Location
    • Adj Ridhora Shiv Road
    • Akola
    • Akola (M Corp.)
    • 444001
  • Pincode444001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50100017949
  • ReraGenie IDRG-MH-01522

Builder

  • NameDhariwal And Chhoriya Developers LLP
  • Entity typePartnership
  • GSTIN27AAIFD2049J1ZD
  • PartnerAnmol Kanhaiyalal Chhoriya
  • Other registrations10 more →
  • Completed2 of 11
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2018PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Sep 2018
  • Promised completion30 Dec 2024
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed75 files

Current status

89%181 of 204 units booked

Figures as on 7 Feb 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities17

As on 7 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Layout Compound WallNoNot applicable
Ent GateYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area64,200 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMunicipal corporation
Permissible FSI31736.81
Proposed, not sanctioned31,737 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNR TOWER AKOLA-444001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Kunal P Patil
Chartered AccountantAjit Chhajed
PartnerRole in project
Dhariwal And Chhoriya Developers LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Dec 2024

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Akola Form 3 Dec 2024.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Akola Form 1 Dec 2024.pdf23 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Akola Form 4 Dec 2024.pdf23 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Akola Form 2 Dec 2024.pdf23 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AKOLA OCCUPANCY.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Akola Sept24.pdf27 Nov 2024
Certificates of CA (Form 3)File: CA Akola Sept24.pdf27 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER Akola Sept24.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Akola June24.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER Akola June24.pdf12 Aug 2024
Certificates of CA (Form 3)File: CA Akola June24.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Akola March24.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER Akola March24.pdf5 Jun 2024
Certificates of CA (Form 3)File: CA Akola March24_compressed.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: F5 CA Akola Plotting 20-21.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: F5 CA Akola Plotting 21-22.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: F5 CA Akola Plotting 22-23.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: F5 CA Akola Plotting 23-24.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Akola.pdf7 May 2024
Disclosure of sold/ booked inventoryFile: Akola.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR_Akola_Dec23.pdf14 Mar 2024
Certificates of CA (Form 3)File: CA Akola Dec23_compressed.pdf14 Mar 2024
Certificates of CA (Form 3)File: CA Akola Sept 2023.pdf27 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AR_Akola_Dec23.pdf23 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER_Akola_Dec23.pdf23 Feb 2024
Certificates of CA (Form 3)File: CA Akola Sept 2023_compressed.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR akola Sept23.pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER akola Sept23.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Akola march 2023.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Akola June 2023.pdf15 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER Akola June 2023.pdf15 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A)File: ER Akola march 2023.pdf15 Dec 2023
Certificates of CA (Form 3)File: CA Akola March 2023_compressed.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Akola plotting Architect's Certificate.PDF23 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Akola plotting Engineer's Certificate.PDF23 Aug 2023
Certificates of CA (Form 3)File: CA Akola plotting_compressed.pdf23 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar akola site.pdf30 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er akola site1.pdf30 Dec 2022
Certificates of CA (Form 3)File: CA akola_11zon.pdf30 Dec 2022
Disclosure of sold/ booked inventoryFile: Akola.pdf28 Dec 2022
Certificates of CA (Form 3)File: CA akola_11zon.pdf28 Sep 2022
Disclosure of sold/ booked inventoryFile: Akola.pdf27 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar cert akola.pdf23 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er akola_11zon.pdf23 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar cert R M dhariwal township Akola plotting.pdf6 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi R M Dhariwal Township Akola plotting.pdf6 Jul 2022
Certificates of CA (Form 3)File: CA certi R M Dhariwal Township Akola plotting.pdf6 Jul 2022
CERSAI detailsFile: CERSAI AKOLA.pdf14 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: akola ar certificate.pdf19 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: akola er certificate.pdf19 Mar 2022
Certificates of CA (Form 3)File: Akola CA certificate_compressed.pdf19 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AKLOLA.pdf10 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 AKOLA_compressed.pdf10 Feb 2022
Disclosure of sold/ booked inventoryFile: AKOLA.pdf22 Jan 2022
Certificates of CA (Form 3)File: FORM 3 CA AKOLA PLOTTING_compressed.pdf30 Dec 2021
Declaration about Commencement CertificateFile: DECLARATION AKOLA PLOTTING.pdf30 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 AKOLA PLOTTING 2018.pdf27 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 AKOLA PLOTTING 2019.pdf27 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Cetifi Akola Plotting Up To March - 19.pdf12 Aug 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Quality Assurance Cetifi Akola Plotting Up To March - 19.pdf12 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cetifi Akola Plotting Up To March - 19.pdf21 Jun 2019
Certificates of CA (Form 3)File: Ca Cetifi Akola Plotting Up To March - 19.pdf21 Jun 2019
Copy of the legal title reportFile: Akola search report.pdf18 Sep 2018
Details of encumbrancesFile: Encumbrance Certificate for Akola.pdf18 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Demarcated Akola Na Order ( Only TP).pdf18 Sep 2018
Declaration in FORM BFile: Akola Form - B.pdf18 Sep 2018
Proforma of Allotment letterFile: ATS Draft - Akola Plotting.pdf5 Sep 2018
Proforma of Allotment letterFile: Allottment letter Akola Plotting.pdf5 Sep 2018
Layout approvalFile: Final Demarcated Akola Sanction Layout (Only TP ).pdf4 Sep 2018
Building plan approval or NA orderFile: Final Demarcated Akola Sanction Layout (Only TP ).pdf4 Sep 2018
PAN CardFile: D C LLP Pan Card.pdf4 Sep 2018
Copy of Layout Approval (in case of layout)File: Final Demarcated Akola Sanction Layout (Only TP ).pdf4 Sep 2018
Building Plan Approval (IOD)File: Final Demarcated Akola Sanction Layout (Only TP ).pdf4 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Akola NA Order.pdf4 Sep 2018
Certificates of CA (Form 3)File: CA Crtificate - Akola Plotting.pdf4 Sep 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
R M Dhariwal Township Tembhurni PlottingPost - Tembhurni Tal - madha Dist - solapur193CompletedDec 2019Dec 2019

How this compares with Akola

89%of this project is bookeddistrict median 0%
10%of Akola projects moved their completion datethis one has not
33%of Akola registrations have lapsed or been cancelledthis one is completed

Computed across the 120+ Akola projects on ReraGenie, from their own filings.

Keep R M Dhariwal Township Akola Plotting on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Akola120+ in Akola

Builder: Dhariwal And Chhoriya Developers LLP

Dhariwal And Chhoriya Developers LLP has 11 registrations on MahaRERA, including R M Dhariwal Greens Yavatmal Phase 1 and R M Dhariwal Greens Yavatmal Phase - 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Akola district page.

Frequently asked questions

What are my rights if R M Dhariwal Township Akola Plotting is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of R M Dhariwal Township Akola Plotting?

The registered promoter entity is Dhariwal And Chhoriya Developers LLP, a partnership as per the filing. Its GSTIN 27AAIFD2049J1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in R M Dhariwal Township Akola Plotting?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for R M Dhariwal Township Akola Plotting?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at R M Dhariwal Township Akola Plotting?

The professionals named in the filing: Architect: Mr Kunal P Patil; Chartered Accountant: Ajit Chhajed. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in R M Dhariwal Township Akola Plotting?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About R M Dhariwal Township Akola Plotting. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save R M Dhariwal Township Akola Plotting to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.