Red flags

  • Possession 2 months past the filed date
  • Rs 19.00 crore secured on the land, in favour of State Bank of India

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Akola registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
4 of 11Construction stages donefurthest along: Internal walls, 75%
94 of 98Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Yamuna Business Park is a Commercial project by Marvel Trinity Real Estate LLP in Akola, Maharashtra, registered with MahaRERA as P50100053326 on 27 Oct 2023. Possession was promised by 31 Aug 2026 and is now 2 months past that date. 4 of the 98 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameYamuna Business Park
  • TypeCommercial
  • Location
    • Opposite Yamuna Plaza
    • National Highway No. 6
    • National Highway No. 6
    • Akola (M Corp.)
    • Akola
    • 444001
  • Pincode444001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50100053326
  • ReraGenie IDRG-MH-05017

Builder

  • NameMarvel Trinity Real Estate LLP
  • Entity typePartnership
  • PartnersGhanshyam Kishore Kothari, Santoshkumar Narendrakumar Heda, Madhur Sunil Innani
  • Other registrations3 more →
  • Completed1 of 4
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

2 months past promisethis monthRegisteredOct 2023PromisedAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion31 Aug 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

4%4 of 98 units booked
71.2%Work done, per cost certificate

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Yamuna Business ParkNA10709898

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

Yamuna Business Park: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes75%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed364

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots364
Closed/Covered364

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,624 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofState Bank of India
Secured amountRs 19.00 crore
CERSAI search filedYes
Declared on20 Jun 2025

Approvals and building plan

Sanctioning authorityAkola Municipal Corporation
Permissible FSI10632.99
Proposed, not sanctioned10,633 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShrawagi Tower, Tilak Road, Akola 444002
Estimated costRs 42.92 cr
Cost incurredRs 30.55 cr
Work done71.17%
BuildingWingEstimatedIncurred
Yamuna Business ParkNARs 42.92 crRs 30.55 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjeev Jain
EngineerKhwaja Saud Ur Rahman Najeeb Rahman
EngineerAgasti Kalyan Rathod
Chartered AccountantHemant Agrawal
Chartered AccountantAgrawal Bajoria Padiya & Associates
Chartered AccountantSAGAR S. RATHI & ASSOCIATES
PartnerRole in project
Marvel Trinity Real Estate LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 YBP.pdf18 Jun 2026
Withdrawal Update Form 2File: Form 2 YBP.pdf18 Jun 2026
Withdrawal Update Form 3File: Form 3 YBP.pdf18 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf9 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf9 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: Form 5.pdf10 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf17 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf20 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf20 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 310325.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 310325.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 310325.pdf19 Apr 2025
Details of encumbrances concerned to FinanceFile: Finance Encumberance.pdf26 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Usold.pdf26 Mar 2025
CERSAI detailsFile: CERSAI.pdf26 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf26 Mar 2025
Details of encumbrances concerned to LegalFile: Finance Encumberance.pdf26 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Format B.pdf26 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Loan Diclosure along with CA Certificate.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 311224.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 311224.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-311224.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 300924.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 300924.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 300924.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 300624.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-300624.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 300624.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: YBP 1 310324.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YBP 2 310324.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YBP 3 310324.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-311223.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-311223.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-311223.pdf20 Jan 2024
Other - TechnicalFile: Gmail - Fwd_ AKOLA MUNICIPAL CORPORATION COMPLATION CERTIFICATE OF BUILDING PERMISSION PRO20 Oct 2023
Other - LegalFile: INDEX-2.pdf6 Oct 2023
Layout approvalFile: Building Sanction Map 1.pdf20 Sep 2023
Building plan approvalFile: Building Sanction Map.pdf20 Sep 2023
Building plan approvalFile: Building Sanction Map 1.pdf20 Sep 2023
PAN CardFile: PAN.pdf20 Sep 2023
Copy of the legal title reportFile: LSR.pdf20 Sep 2023
Details of encumbrances concerned to FinanceFile: Finance Encumberance.pdf20 Sep 2023
Details of encumbrances concerned to FinanceFile: Legal Encumberance.pdf20 Sep 2023
Details of encumbrances concerned to LegalFile: Finance Encumberance.pdf20 Sep 2023
Details of encumbrances concerned to LegalFile: Legal Encumberance.pdf20 Sep 2023
Copy of Layout Approval (in case of layout)File: Building Sanction Map 1.pdf20 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Sanction Map.pdf20 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Sanction Map 1.pdf20 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Sep 2023
Declaration about Commencement CertificateFile: Declaration of Commencement.pdf20 Sep 2023
Declaration in FORM BFile: Form B-Declaration.pdf20 Sep 2023
CERSAI detailsFile: Cersai Declaration.pdf20 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Project Interest- Ghanshyam.pdf20 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Project Interest- Madhur.pdf20 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Project Interest- Santosh.pdf20 Sep 2023
Proforma of Agreement for saleFile: Agrenment to sale.pdf20 Sep 2023
Proforma of Allotment letterFile: Allotment Letter.pdf20 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf20 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf20 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement to Sale.pdf20 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Yamuna TowerP50100051525Near Sai Mandir, AkolaJun 2023CompletedMar 2025Jun 2024

How this compares with Akola

4%of this project is bookeddistrict median 0%
10%of Akola projects moved their completion datethis one has not
33%of Akola registrations have lapsed or been cancelledthis one is on the register

Computed across the 120+ Akola projects on ReraGenie, from their own filings.

Keep Yamuna Business Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near National Highway No. 6120+ in Akola

2 kmYamuna Business ParkCompleted 15Lapsed / revoked 3Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: Marvel Trinity Real Estate LLP

Marvel Trinity Real Estate LLP has 4 registrations on MahaRERA, including Yamuna Tower and Yamuna Business Park. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Akola district page.

Frequently asked questions

What are my rights if Yamuna Business Park is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yamuna Business Park?

The registered promoter entity is Marvel Trinity Real Estate LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yamuna Business Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yamuna Business Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yamuna Business Park?

The professionals named in the filing: Architect: Sanjeev Jain; Engineer: Khwaja Saud Ur Rahman Najeeb Rahman; Engineer: Agasti Kalyan Rathod; Chartered Accountant: Hemant Agrawal; Chartered Accountant: Agrawal Bajoria Padiya & Associates; Chartered Accountant: SAGAR S. RATHI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yamuna Business Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yamuna Business Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yamuna Business Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.