Home / Browse projects / Mumbai Suburban, Maharashtra / Shri Vallabh Residency

Registration lapsed No litigation declared Residential / Group Housing project

Shri Vallabh Residency

By SWADHINTA BUILDERS LLP

RG-MH-86051 · RERA P51800005762 · Last updated on MahaRERA portal: 14 Oct 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 57 months past the filed date
  • 15 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jan 2022Possession promised57 months past this date
0 of 11Construction stages donefurthest along: Stilt Floor, 90%
15Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

Shri Vallabh Residency is a Residential / Group Housing project by SWADHINTA BUILDERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005762 on 11 Aug 2017. Possession was promised by 26 Jan 2022 and is now 57 months past that date. 15 complaints are on record with the regulator.

At a glance

Project

  • NameShri Vallabh Residency
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005762
  • ReraGenie IDRG-MH-86051

Builder

  • NameSWADHINTA BUILDERS LLP
  • Entity typeOthers
  • Named personsMANISH THAKKAR, Bhavesh Thakkar

Key dates

57 months past promisethis monthRegisteredAug 2017PromisedJan 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Aug 2017
  • Promised completion26 Jan 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shri Vallabh residencyNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

Shri Vallabh residency: 29% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)50%
Podiums (if any)50%
Plinth50%
Stilt Floor90%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks2%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered19
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,848 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6324.0
Proposed, not sanctioned2,027 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 11 JVPD Scheme Mumbai

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManish Shah
EngineerPravin gala Consultant Pvt Ltd
PartnerRole in project
SWADHINTA BUILDERS LLP-

Complaints filed with MahaRERA15

Case no.ComplainantRespondentFiled
CC006000000192880DAKSHA SHAILESH KAKRECHASwadhinta Builders LLP08/04/2020
CC006000000192882SHAILESH K. KAKRECHAM/s. Swadhinta Builders LLP08/04/2020
CC006000000192883JATIN CHUNILAL GANGARSwadhinta Builders LLP08/04/2020
CC006000000100529Srichand Makhijaswadinta builders limited liabilityy14/08/2019
CC006000000100590Jayesh Jagdish ThakkarSwadinta Builder Limited liability partnership19/08/2019
CC006000000100593Priyanka M WaghelaSwadhintaBuilders LLP19/08/2019
CC006000000100622RajanChandiramaniSwadhinta Builders LLP21/08/2019
CC006000000110658Hitesh ParikhSwadhinta Builders LLP23/08/2019
CC006000000120995Swadhinta Builders LLPShailesh K Kakrecha29/09/2019
CC006000000120997Swadhinta Builders LLPDaksha Shailesh Kakrecha29/09/2019
CC006000000130993SWADHINTA BUILDERS LLPJatin Chunnilal Ganger29/09/2019
CC006000000193209Swadhinta Builders LLPAshok L Narang15/05/2020
CC12500702Keyul ShethSWADHINTA BUILDERS LLP28/02/2025
CC12500771Lalit DharamshiSWADHINTA BUILDERS LLP07/03/2025
CC12500777Leena Priyankar GandhiSWADHINTA BUILDERS LLP07/03/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC-JUNE-23.pdf14 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC-SEP-23.pdf14 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC-FORM-2-JUNE-23.pdf14 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC-FORM-2-SEP-23.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: EC-2020.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: EC-2021.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: EC-2022.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: EC-2023.pdf14 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 3 06 23.pdf13 Oct 2023
Certificates of CA (Form 3)File: FORM-3 06 22.pdf13 Oct 2023
Certificates of CA (Form 3)File: FORM - 3 09 22.pdf13 Oct 2023
Certificates of CA (Form 3)File: FORM - 3 12 22.pdf13 Oct 2023
Certificates of CA (Form 3)File: FORM - 3 03 23.pdf13 Oct 2023
Certificates of CA (Form 3)File: FORM - 3 09 23.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: form 5 17-18.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 22-23.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch 2018-19_compressed.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch 2019-20 (1)_compressed.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch 2020-21_compressed.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch 2021-22_compressed.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch 2022-23_compressed.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng 31-03-2019_compressed.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng 31-03-2020_compressed.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng 31-03-2021_compressed.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng 31-03-2022_compressed.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng 31-03-2023_compressed.pdf15 Apr 2023
Certificates of CA (Form 3)File: FORM-3-2018-2019 (2).pdf15 Apr 2023
Certificates of CA (Form 3)File: FORM-3-2020-2021.pdf15 Apr 2023
Certificates of CA (Form 3)File: FORM-3-2019-2020 (2).pdf15 Apr 2023
Certificates of CA (Form 3)File: FORM -3-2021-2022 (2)_compressed.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM-5-2018-2019 (2).pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5-2019-2020 (1).pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5-2020-2021 (2).pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5-2021-2022 (1).pdf15 Apr 2023
Details of encumbrances concerned to FinanceFile: CC-DECLARATION.pdf7 Feb 2023
Details of encumbrances concerned to LegalFile: CC-DECLARATION.pdf7 Feb 2023
Declaration about Commencement CertificateFile: CC-DECLARATION.pdf7 Feb 2023
CERSAI detailsFile: Undertaking of CRESAI.pdf7 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Seprate Account.pdf7 Feb 2023
Layout approvalFile: BMC plan.pdf31 Jul 2017
Details of encumbrancesFile: encumbrances0001.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: BMC plan.pdf31 Jul 2017
Declaration in FORM BFile: MANISH THAKKAR0001.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BINDESH CHITALIA0001.pdf31 Jul 2017
Certificates of CA (Form 3)File: SHAILESH SHAH0001.pdf31 Jul 2017
Proforma of Allotment letterFile: Rera agreement.pdf31 Jul 2017
Proforma of Allotment letterFile: allotment letter10001.pdf31 Jul 2017
OtherFile: SWADHINTA BUILDERS0001.pdf31 Jul 2017
Layout approvalFile: APPROVED LAYOUT DATED 14-08-20081.pdf30 Jul 2017
Building plan approvalFile: IOD.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: APPROVED LAYOUT DATED 14-08-20081.pdf30 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CCKANDIVLI.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITEC_CERTIFICATE.pdf30 Jul 2017
PAN CardFile: SWADHINTA BUILDERS LLP (1).pdf29 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE_KANDIVLI_JAYESH BHATT (1).pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shri Vallabh Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmShri Vallabh ResidencyCompleted 157Lapsed / revoked 98Other 216Dot size: filed unitsN

Filed coordinates, straight-line distance. 471 registered projects within 2 km.

Builder: SWADHINTA BUILDERS LLP

SWADHINTA BUILDERS LLP has 1 registration on MahaRERA, including Shri Vallabh Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Shri Vallabh Residency shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Shri Vallabh Residency is delayed beyond 26 Jan 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shri Vallabh Residency?

The registered promoter entity is SWADHINTA BUILDERS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shri Vallabh Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Shri Vallabh Residency?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Shri Vallabh Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shri Vallabh Residency?

The professionals named in the filing: Architect: Manish Shah; Engineer: Pravin gala Consultant Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shri Vallabh Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shri Vallabh Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shri Vallabh Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.