ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / SHRI GANESHKRIPA

Registered No litigation declared Residential / Group Housing project

SHRI GANESHKRIPA

By KIRAN ENTERPRISES

RG-MH-00053 · RERA P99000053717 · Last updated on MahaRERA portal: 2 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
3 of 11Construction stages donefurthest along: Staircases, 55%
34 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

SHRI GANESHKRIPA is a Residential / Group Housing project by KIRAN ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000053717 on 22 Nov 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 18 of the 52 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHRI GANESHKRIPA
  • TypeResidential / Group Housing
  • Location
    • LAXMIBEN CHHEDA MARG
    • NALLASOPARA (W)
    • Sopara
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • RERA no.P99000053717
  • ReraGenie IDRG-MH-00053

Builder

  • NameKIRAN ENTERPRISES
  • Entity typePartnership
  • PartnerNARENDRA NANJI MEHTA
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredNov 2023First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Nov 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed119 files

Current status

35%18 of 52 units booked
37.6%Work done, per cost certificate

Figures as on 2 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building no 2 Wing A and BNA8849352

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 55%.

Building no 2 Wing A and B: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed74

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots74
Closed/Covered74

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area628 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jul 2025
LandownerVillageDistrict
SHRI GANESHKR SAHAKARI GRIHANIRMAN SANSTHA MARYADIVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI2069.84
Proposed, not sanctioned2,070 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO CIS 383A JNCTN OF S V ROAD JAMNADAS ADUKIA RD KANDIVALI WEST MUMBAI 400 067
Estimated costRs 5.85 cr
Cost incurredRs 2.20 cr
Work done37.6%
BuildingWingEstimatedIncurred
Building no 2 Wing A and BNARs 5.50 crRs 2.20 cr
-NARs 35.13 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA AND ASSOCIATES
ArchitectSANAT NARENDRA MEHTA
EngineerABHISHEK LENGARE
EngineerABHISHEK ARUN LENGARE
EngineerSANAT MEHTA AND ASSOCIATES
Chartered AccountantG B TINAIKAR AND COMPANY
Chartered AccountantGAJANAN BALKRISHNA TINAIKAR
PartnerRole in project
KIRAN ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26082622396Dec 2025 → Dec 2027

Reason as filed by the promoterNon availability of material use due to war and excessive rains caused delay in completion of finishing works

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 Shree Ganesh Kripa FY 2025-2026.pdf2 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A Ganesh Kripa-25-26.pdf28 Jul 2026
Layout approvalFile: Layout plan GANESH KRIPA.pdf29 Jan 2026
Building plan approvalFile: Building plan approval.pdf29 Jan 2026
Withdrawal Update Form 1File: FORM-I GK (OCT-DEC 25).pdf14 Jan 2026
Withdrawal Update Form 2File: FORM-2 GK (OCT-DEC 25).pdf14 Jan 2026
Withdrawal Update Form 3File: FORM-3 GANESH KRIPA.pdf14 Jan 2026
Withdrawal Update Form 1File: Ganesh kripa Form 1 july to september 2025 Bldg-2 Wing- A u0026 B.pdf24 Nov 2025
Withdrawal Update Form 1File: Ganesh kripa Form 1 july to september 2025 Bldg-2 Wing- A u0026 B.pdf24 Nov 2025
Withdrawal Update Form 1File: Ganesh kripa Form 1 july to september 2025 Bldg-2 Wing- A u0026 B.pdf24 Nov 2025
Withdrawal Update Form 1File: Ganesh kripa Form 1 july to september 2025 Bldg-2 Wing- A u0026 B.pdf24 Nov 2025
Withdrawal Update Form 2File: Ganesh Kripa Form 2 July to september 2025.pdf24 Nov 2025
Withdrawal Update Form 2File: Ganesh Kripa Form 2 July to september 2025.pdf24 Nov 2025
Withdrawal Update Form 2File: Ganesh Kripa Form 2 July to september 2025.pdf24 Nov 2025
Withdrawal Update Form 2File: Ganesh Kripa Form 2 July to september 2025.pdf24 Nov 2025
Withdrawal Update Form 3File: Form - 3-July sept 25Untitled.pdf24 Nov 2025
Withdrawal Update Form 3File: Form - 3-July sept 25Untitled.pdf24 Nov 2025
Withdrawal Update Form 3File: Form - 3-July sept 25Untitled.pdf24 Nov 2025
Withdrawal Update Form 3File: Form - 3-July sept 25Untitled.pdf24 Nov 2025
Form 2A (FY 2023-2024)File: Online FORM-2A GANESH KRIPA (Y-2023-24).pdf24 Nov 2025
Form 2A (FY 2024-2025)File: Online FORM-2A GANESH KRIPA (Y-2024-25).pdf24 Nov 2025
Form 5 (FY 2024-2025)File: Form 5-Ganeshkripa-FY 2024-25.pdf22 Nov 2025
Form 5 (FY 2023-2024)File: Form-5GK.pdf20 Nov 2025
Withdrawal Update Form 1File: Ganesh kripa Form 1 july to september 2025 Bldg-2 Wing- A u0026 B.pdf16 Oct 2025
Withdrawal Update Form 2File: Ganesh Kripa Form 2 July to september 2025.pdf16 Oct 2025
Withdrawal Update Form 3File: Form - 3-July sept 25Untitled.pdf16 Oct 2025
Withdrawal Update Form 1File: Form-1-Arch cft GANESH KRIPA (April-June 2025).pdf17 Jul 2025
Withdrawal Update Form 2File: FORM-2 GANESH KRIPA (April-June 2025).pdf17 Jul 2025
Withdrawal Update Form 3File: Form-3-Ganesh kripa.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cft FORM-I GANESH KRIPA Jan-March 2025 dt 11-04-2025_compressed.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cft FORM-I GANESH KRIPA Jan-March 2025 dt 11-04-2025_compressed.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 GANESH KRIPA.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 GANESH KRIPA Jan March 2025 Dt 11-04-2025.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A GANESH KRIPA Dt 11-04-2025.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 FORM 1 ARCH CFT GANESH KRUPA.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 FORM 3 CA CFT GANESH KRUPA.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 ENGG GANESH KRUPA.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed (1).pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold unsold list.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold-Ganeshkripa_compressed.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold-Ganeshkripa.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - GK.pdf8 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 - GK.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July-Sept 2024 Ganesh Kripa-compressed.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Report-compressed.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I July-Sept 2024 Ganesh Kripa.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July-Sept 2024 Ganesh Kripa low.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2July-Sept 2024 Ganesh Kripa.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Cft.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I April-June 2024 Shri Ganesh Kripa.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cft Form II April-June 2024 Shri Ganeshkripa.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 April to June 2024 Ganesh Kripa_compressed (1).pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I.pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 -Engineer's Cft.pdf30 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A Engineer's Cft for Quality Assursnce Cft Form 2A.pdf30 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA_compressed (1).pdf30 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-I-Oct-Dec 2023_compressed.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-II-Oct-Dec-23_compressed.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Oct-Dec 2023_compressed (1).pdf3 Jan 2024
Other - TechnicalFile: Letter-No change.pdf3 Jan 2024
Other - TechnicalFile: Arch cft.pdf16 Nov 2023
Building plan approvalFile: 5 Building Plan Approval _ NA Order for plotted development.pdf3 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan Approval _ NA Order for plotted development.pdf3 Nov 2023
Other - TechnicalFile: 3 Other - Technical.pdf3 Nov 2023
Other - TechnicalFile: Ack-CC.pdf3 Nov 2023
Declaration about Commencement CertificateFile: Delcaration about cc.pdf19 Oct 2023
Building plan approvalFile: ganesh krupa block plan_09-10-23_compressed.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: ganesh krupa block plan_09-10-23_compressed.pdf9 Oct 2023
Other - TechnicalFile: Covering letter.pdf9 Oct 2023
Other - TechnicalFile: verification details.pdf9 Oct 2023
Building plan approvalFile: LAYOUT_compressed.pdf13 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT_compressed.pdf13 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: RENEWAL DT 19-07-23_1.pdf13 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cft.pdf13 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg cft.pdf13 Sep 2023
Building plan approvalFile: Building Plan.pdf21 Jul 2023

How this compares with Palghar

35%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 24 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRI GANESHKRIPA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALLASOPARA (W)3,200+ in Palghar

Builder: KIRAN ENTERPRISES

KIRAN ENTERPRISES has 4 registrations on MahaRERA, including NEW NANDDHAM and LAXMI KIRAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHRI GANESHKRIPA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRI GANESHKRIPA?

The registered promoter entity is KIRAN ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRI GANESHKRIPA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRI GANESHKRIPA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRI GANESHKRIPA?

The professionals named in the filing: Architect: SANAT MEHTA AND ASSOCIATES; Architect: SANAT NARENDRA MEHTA; Engineer: ABHISHEK LENGARE; Engineer: ABHISHEK ARUN LENGARE; Engineer: SANAT MEHTA AND ASSOCIATES; Chartered Accountant: G B TINAIKAR AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRI GANESHKRIPA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRI GANESHKRIPA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRI GANESHKRIPA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.