DEEP SKYRISE
RG-MH-83413 · RERA PM1240002601654 · Last updated on MahaRERA portal: 21 Jul 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 23 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DEEP SKYRISE is a Mixed project by DEEP REALCON LLP in Palghar, Maharashtra, registered with MahaRERA as PM1240002601654 on 25 Aug 2026. Possession is promised by 31 Dec 2031.
At a glance
Project
- NameDEEP SKYRISE
- TypeMixed
- Location
- NILEMORE
- NALLASOPARA WEST
- Vasai
- Palghar
- 401203
- Pincode401203
- MapView location on Google Maps (as filed on RERA)
- RERA no.PM1240002601654
- ReraGenie IDRG-MH-83413
Builder
- NameDEEP REALCON LLP
- Entity typePartnership
- GSTIN27AAUFD6288R1Z4
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Aug 2026
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings7 building records
- Documents filed23 files
Current status
Figures as on 21 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A TO D (P II S IV BLDG NO 03) | A-WING | 26 | 26 | 96 | 6 | 102 |
| WING A TO D (P II S IV BLDG NO 03) | B-WING | 26 | 26 | 100 | 5 | 105 |
| WING A TO D (P II S IV BLDG NO 03) | C-WING | 26 | 25 | 100 | 0 | 100 |
| WING A TO D (P II S IV BLDG NO 03) | D-WING | 26 | 25 | 96 | 0 | 96 |
| ABC (PH-II SEC-IV BLDG NO 4) | A WING | 26 | 25 | 125 | 0 | 125 |
| ABC (PH-II SEC-IV BLDG NO 4) | B WING | 26 | 25 | 125 | 0 | 125 |
| ABC (PH-II SEC-IV BLDG NO 4) | C WING | 26 | 25 | 146 | 0 | 146 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing.
WING A TO D (P II S IV BLDG NO 03) · wing A-WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING A TO D (P II S IV BLDG NO 03) · wing B-WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING A TO D (P II S IV BLDG NO 03) · wing C-WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING A TO D (P II S IV BLDG NO 03) · wing D-WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ABC (PH-II SEC-IV BLDG NO 4) · wing A WING11%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ABC (PH-II SEC-IV BLDG NO 4) · wing B WING21%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 90% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ABC (PH-II SEC-IV BLDG NO 4) · wing C WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed419
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Stilt / Ground | Stack Parking | Total |
|---|---|---|---|---|
| WING A TO D (P II S IV BLDG NO 03) A-WING | 43 | 6 | 12 | 61 |
| WING A TO D (P II S IV BLDG NO 03) B-WING | 43 | 6 | 12 | 61 |
| WING A TO D (P II S IV BLDG NO 03) C-WING | 42 | 6 | 12 | 60 |
| WING A TO D (P II S IV BLDG NO 03) D-WING | 41 | 8 | 12 | 61 |
| ABC (PH-II SEC-IV BLDG NO 4) A WING | 25 | 13 | 17 | 55 |
| ABC (PH-II SEC-IV BLDG NO 4) B WING | 25 | 12 | 17 | 54 |
| ABC (PH-II SEC-IV BLDG NO 4) C WING | 23 | 6 | 38 | 67 |
Land and ownership1
MahaRERA does not publish landowner contact details.
| Landowner | Village | District |
|---|---|---|
| SHANTINATH BUILDERS | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANAT MEHTA & ASSOCIATES |
| Engineer | ABHISHEK LENGARE |
| Chartered Accountant | S T R & ASSOCIATES |
| Partner | Role in project |
|---|---|
| DEEP REALCON LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
Documents filed23
As listed on the registration. The files themselves are on the MahaRERA portal.
| Document | Uploaded |
|---|---|
| Plan_Bulding Highligh | 21 Jul 2026 |
| Plan_Bldg No 3 ABCD WIng_Built Up Area | 21 Jul 2026 |
| Plan_Bldg No 4 AB WIng_Build Up Area Highlighted | 21 Jul 2026 |
| Plan_Bldg No 4 C WIng_Build Up Area Highlighted | 21 Jul 2026 |
| 2 Approved Plan dated 10 02 2026 for Bldg 4 Wing C1_3_a | 30 Jun 2026 |
| 2 Approved Plan dated 10 02 2026 for Bldg 4 Wing C1_4_b | 30 Jun 2026 |
| APPROVED PLAN_Page 1 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 2 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 3 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 4 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 5 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 6 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 7 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 8 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 1 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 2 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 3 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 4 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 5 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 6 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 7 of 8 | 29 Jun 2026 |
| APPROVED PLAN_Page 8 of 8 | 29 Jun 2026 |
| ANEXURE A REALCON LLP | 27 Jun 2026 |
How this compares with Palghar
Computed across the 3,204 Palghar projects on ReraGenie, from their own filings.
Keep DEEP SKYRISE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NALLASOPARA WEST3,204 in Palghar
Sheetal Yash
DGS BUILDERS AND DEVELOPERS
VIMAL CLASSIC
OM VIMAL DEVELOPERS
DHANANJAY HILL VIEW
DHANLAXMI DEVELOPERS
NAKSHATRA AURIS
RAJLAXMI JSB REALTY LLP
COMFORT HERITAGE
SAI RYDAM REAL ESTATE DEVELOPERS LLP
AV PRIDE
ABHINAV REALTORS
See every Palghar project, with the district possession charts
Builder: DEEP REALCON LLP
DEEP REALCON LLP has 1 registration on MahaRERA, including DEEP SKYRISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if DEEP SKYRISE is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DEEP SKYRISE?
The registered promoter entity is DEEP REALCON LLP, a partnership as per the filing. Its GSTIN 27AAUFD6288R1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DEEP SKYRISE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DEEP SKYRISE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DEEP SKYRISE?
The professionals named in the filing: Architect: SANAT MEHTA & ASSOCIATES; Engineer: ABHISHEK LENGARE; Chartered Accountant: S T R & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DEEP SKYRISE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback