ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / SHRI DEVI KRIPA RESIDENCY

Registration approved No litigation declared Residential/Group Housing project

SHRI DEVI KRIPA RESIDENCY

By AMARNATH SHETTY KURIYALA

RG-KA-93523 · RERA PRM/KA/RERA/1257/336/PR/110823/006166 · Last updated on RERA Karnataka portal: 11 Aug 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 77 documents Report an error

SHRI DEVI KRIPA RESIDENCY is a Residential/Group Housing project by AMARNATH SHETTY KURIYALA in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/336/PR/110823/006166 on 11 Aug 2023. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameSHRI DEVI KRIPA RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Bantwala
    • Dakshina Kannada
    • 574211
  • Pincode574211
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/336/PR/110823/006166
  • ReraGenie IDRG-KA-93523

Builder

  • NameAMARNATH SHETTY KURIYALA
  • Entity typeProprietorship
  • GSTIN29ARMPS9313D2ZD
  • Authorized SignatoryAMARNATH SHETTY KURIYALA

Key dates

this monthRegisteredAug 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Aug 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRI DEVI KRIPA RESIDENCY---13013

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 11 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 11 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area789 sq m
Named landowners1
LandownerVillageDistrict
AMARNATH SHETTY KURIYALA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.89 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.82 cr-
Payment of taxesRs 5.00 lakh-
On-site expenditure-Site OverheadRs 2.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHALINI SURESH
EngineerSUDHIR SHETTY
Chartered AccountantSRINIDHI RAO

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed77

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/336/PR/110823/006166 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
MR COPY BEFORE AMALGAMATIONFile: MR copy.pdf11 Aug 2023
Registration CertificateFile: trade licence.pdf-
Certificate issued by CA Form 1File: RERA FORM 1.pdf-
Certificate issued by Architect Form 2File: architect certiifcate.pdf-
Certificate issued by Engineer Form 3File: engineer certficate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Certificate from Chartered AccountFile: RERA FORM 1.pdf-
Balance Sheet 2021 - 2022File: BS 2023_compressed.pdf-
Balance Sheet 2020 - 2021File: BS 2022.pdf-
Balance Sheet 2019 - 2020File: BS 2021.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL 2023_compressed.pdf-
Audited Profit and Loss Statement 2020 - 2021File: PL 2022.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PL 2021.pdf-
Cash Flow Statement 2021 - 2022File: IS 2023.pdf-
Cash Flow Statement 2020 - 2021File: IS 2022.pdf-
Auditor's Report 2021 - 2022File: Schedule 2023_compressed.pdf-
Auditor's Report 2020 - 2021File: Schedule 2022.pdf-
Auditor's Report 2019 - 2020File: Schedule 2021.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR AY 2023-24.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR AY 2022-23.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR AY 2021-22.pdf-
building licence-
single layout-
sanction plan_compressed-
sanction plan-
sanction plan-
sanction plan-
specification-
single layout-
single layout-
stability certificate-
search report-
title deed-
Concersion order_compressed-
Concersion order_compressed-
mother deed-
proforma AOS-
proforma allotment letter-
brocuher-
form b_compressed-
affidavit 3(1)-
mescom noc-
water noc-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
railway noc-
single layout order copy-
single layout plan-
Village map-
estimation cost by engineer-
STP-drawing-
carpet area statement-
guidance value-
source of fund-
Occupancy CertificateFile: OC.jpeg-
Architect certificate for having completed the work(in format no 5)File: architect certificate -completion.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: form 4cc_compressed.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: completion affidavit.pdf-
engineer certificateFile: engineer certificate-completion.pdf-
completion certificateFile: completion.jpeg-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep SHRI DEVI KRIPA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmSHRI DEVI KRIPA RESIDENCOther 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: AMARNATH SHETTY KURIYALA

AMARNATH SHETTY KURIYALA has 1 registration on RERA Karnataka, including SHRI DEVI KRIPA RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if SHRI DEVI KRIPA RESIDENCY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHRI DEVI KRIPA RESIDENCY?

The registered promoter entity is AMARNATH SHETTY KURIYALA, a proprietorship as per the filing. Its GSTIN 29ARMPS9313D2ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHRI DEVI KRIPA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHRI DEVI KRIPA RESIDENCY?

The professionals named in the filing: Architect: SHALINI SURESH; Engineer: SUDHIR SHETTY; Chartered Accountant: SRINIDHI RAO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRI DEVI KRIPA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRI DEVI KRIPA RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRI DEVI KRIPA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.