SAINT ANTONY COMPLEX

By LANCY GERALD LOBO

RG-KA-09224 · RERA PRM/KA/RERA/1257/336/PR/190123/005626 · Last updated on RERA Karnataka portal: 6 Jan 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Aug 2020Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 105 documents Report an error

SAINT ANTONY COMPLEX is a Mixed Development project by LANCY GERALD LOBO in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/336/PR/190123/005626 on 19 Jan 2023. Possession is promised by 10 Aug 2020.

At a glance

Project

  • NameSAINT ANTONY COMPLEX
  • TypeMixed Development
  • Location
    • Bantwala
    • Dakshina Kannada
    • 574211
  • Pincode574211
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/336/PR/190123/005626
  • ReraGenie IDRG-KA-09224

Builder

  • NameLANCY GERALD LOBO
  • Entity typeProprietorship Firm
  • Authorized SignatoryLANCY GERALD LOBO

Key dates

Registered
19 Jan 2023
Promised
10 Aug 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Jan 2023
  • Promised completion10 Aug 2020
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAINT ANTONY COMPLEX-----18

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 6 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area607 sq m
Named landowners3
LandownerVillageDistrict
LANCY GERALD LOBO--
LANCY GERALD LOBO--
LANCY GERALD LOBO--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.45 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.40 cr-
On-site expenditure-Consultants FeesRs 2.50 lakh-
Payment of taxesRs 1.00 lakh-
Payment of cessRs 1.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY PRADEEP ASSOCIATES
EngineerAJAY PRADEEP ASSOCIATES
Chartered AccountantGURUPRASAD K

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed105

As listed on the registration, under the names the promoter filed them with; the newest 80 of 105 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/336/PR/190123/005626 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
FARFile: FAR.pdf6 Jan 2023
WATER NOCFile: Borewell.pdf6 Jan 2023
CA reportFile: CA report.pdf6 Jan 2023
Sanction LetterFile: LICENSE.pdf6 Jan 2023
ClarificationFile: clarification.pdf6 Jan 2023
title deed of rtc land ownersFile: TITLE DEED CLARA.pdf13 Dec 2022
title deed of rtc land ownersFile: TITLE DEED JANET.pdf13 Dec 2022
title deed of rtc land ownersFile: TITLE DEED SYLVIA.pdf13 Dec 2022
certified copy obtained by the concerned Sub-registrar regarding value of the property on the basisFile: VAULATION.pdf13 Dec 2022
certified copy obtained by the concerned Sub-registrar regarding value of the property on the basisFile: VAULATION 2.pdf13 Dec 2022
brief estimated cost of construction certified by the Engineer along with the Engineer certificate(FFile: estimation.pdf13 Dec 2022
brief estimated cost of construction certified by the Engineer along with the Engineer certificate(FFile: Form no 6.pdf13 Dec 2022
FORM 2File: Form no 2.pdf13 Dec 2022
FORM 3File: Form no 3.pdf13 Dec 2022
Upload Chartered accountant Membership certificate.File: CA regn certificate.pdf27 Oct 2022
Bank account name should be as per bank account direction circular.File: BANK ACCOUNT.jpeg27 Oct 2022
Upload 2021-22 Balance sheet, profit and loss account with CA UDIN.File: BS and PL 2022.pdf27 Oct 2022
need conversion order for syno 0.05centsFile: 525 5cents conversion order.pdf27 Oct 2022
need advocate search reportFile: Advocate search report.pdf27 Oct 2022
Uploaded Sanction planFile: PLAN SA.PDF27 Oct 2022
Upload certified Carpet area calculation.File: CERTIFIED CARPET AREA.jpg27 Oct 2022
Please upload the source of water supply to the project, incase of bore well, please upload the permFile: NOC WATER.pdf27 Oct 2022
upload the section 3(1) notarized affidavit.File: notarized affidavit new.pdf27 Oct 2022
Septic Tank,File: Septic Tank & Rain Water Harvesting Plan.pdf27 Oct 2022
Certificate from Registered Engineer indicating the structural safety of the building.File: STRUCTURAL STABILITY CERTIFICATE.pdf27 Oct 2022
MESCOM FEE PAID RECEIPTFile: Mescom Bills.pdf27 Oct 2022
RTC, survey 68-1A-
Mutation, survey 68-1A-
Encumbrance Certificate, survey 68-1A-
Conversion/Alienation Order, survey 68-1A-
Sale/Title/Gift Deed, survey 68-1A-
Khatha, survey 68-1A-
RTC, survey 68-1A-
Mutation, survey 68-1A-
Encumbrance Certificate, survey 68-1A-
Conversion/Alienation Order, survey 68-1A-
Sale/Title/Gift Deed, survey 68-1A-
Khatha, survey 68-1A-
RTC, survey 68-1A-
Mutation, survey 68-1A-
Encumbrance Certificate, survey 68-1A-
Conversion/Alienation Order, survey 68-1A-
Sale/Title/Gift Deed, survey 68-1A-
Khatha, survey 68-1A-
Registration CertificateFile: PAN LANCY.jpg-
Certificate issued by CA Form 1File: form 1.pdf-
Certificate issued by Architect Form 2File: Form no 2.pdf-
Certificate issued by Engineer Form 3File: Form no 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: non litigation st antony.pdf-
Certificate from Chartered AccountFile: form 1.pdf-
Balance Sheet 2021 - 2022File: PL and BS 2021.pdf-
Balance Sheet 2020 - 2021File: PL and BS 2020.pdf-
Balance Sheet 2019 - 2020File: PL and BS 2019.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL and BS 2021.pdf-
Audited Profit and Loss Statement 2020 - 2021File: PL and BS 2020.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PL and BS 2019.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 21.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 20.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2019.pdf-
License with plan-
NOC MESCOM-
NOC WATER-
PLAN SA-
PLAN SA-
PLAN SA-
PLAN SA-
PLAN SA-
specification-
PLAN SA-
PLAN SA-
conversion-
conversion-
AOS new-
ALLOTMENT letter-
form B-
notarized affidavit st antony-
NOC MESCOM-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep SAINT ANTONY COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmSAINT ANTONY COMPLEXOther 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: LANCY GERALD LOBO

LANCY GERALD LOBO has 1 registration on RERA Karnataka, including SAINT ANTONY COMPLEX. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if SAINT ANTONY COMPLEX is delayed beyond 10 Aug 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SAINT ANTONY COMPLEX?

The registered promoter entity is LANCY GERALD LOBO, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SAINT ANTONY COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SAINT ANTONY COMPLEX?

The professionals named in the filing: Architect: AJAY PRADEEP ASSOCIATES; Engineer: AJAY PRADEEP ASSOCIATES; Chartered Accountant: GURUPRASAD K. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAINT ANTONY COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAINT ANTONY COMPLEX. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAINT ANTONY COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.